• Title/Summary/Keyword: How to win the bid

Search Result 3, Processing Time 0.017 seconds

Design and Implement of Multi-agent System for Internet Auction (인터넷 경매를 위한 멀티 에이전트 시스템의 설계 및 구현)

  • 김은영;김태석;김광휘
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.3
    • /
    • pp.321-328
    • /
    • 2001
  • Existing internet auction systems have adopted the form which gives a win to the auction bidder who proposes the top bid price for the goods posted on the auction board. But they haven't been satisfying the automatical one-step processing for user’s convenience because they must require continuous care of user for bidding and checking as well as neglecting the convenience of user interface while participating in the electronic bidding system. The agent push mail to a auctioneer information that able to get how much profit as calculate duration time and start price with bidding history stored database. So, this thesis propose a multi-agent system in internet auction that generate the highest margin for auctioneer’s goods.

  • PDF

An Analysis of Factors Affecting the Amount of Long-term Repair Allowance Used and the Amount of General Repair Cost Used in Apartment Houses : Focused on the Bidding Construction Cost of Apartment Houses in Busan (공동주택의 장기수선충당금 사용액과 일반보수비 사용액에 영향을 미치는 요인 분석 : 부산시 공동주택의 입찰공사비를 대상으로)

  • Lee, Chan-Ho
    • Journal of Industrial Convergence
    • /
    • v.20 no.5
    • /
    • pp.1-9
    • /
    • 2022
  • Today, apartment houses account for a very high proportion of the types of residence. This study analyzed the difference between the bidding construction cost using the long-term repair allowance and using the general repair cost, and analyzed the difference of factors affecting the amount of use of these two items. For this purpose, related data on apartment housing complexes located in seven representative districts of Busan from 2017 to 2021 were collected and analyzed from the apartment housing management information system. As a result of statistical analysis, the type of bidding variable had the greatest negative(-) effect on the bidding construction cost, and the next factor that affected was different between the amount of long-term repair allowance used and general repair cost used. In addition, there was a difference in statistical significance in the type of bidding by construction year for the number of bidding works between the case of using the long-term repair allowance and the case of using the general repair cost. The results of this analysis will help to find ways to reduce bidding construction costs. However, it is expected to find additional meaning by including more detailed variables such as technical ability.

A Study on the Effect of the Bidding Stage Factors of Logistics Outsourcing Service on Trust, Cooperation and Service Satisfaction (물류아웃소싱 서비스의 입찰단계 요인이 신뢰, 협력 및 서비스 만족도에 미치는 영향에 관한 연구)

  • Lee, Nam-Seung;Song, Sang-Hwa
    • Journal of Korea Port Economic Association
    • /
    • v.36 no.2
    • /
    • pp.19-36
    • /
    • 2020
  • The bidding phase for logistics outsourcing services is critical for both shippers and logistics companies. According to the logistics bidding phase, the shipper should provide logistics operation information to logistics companies to resolve uncertainty. In addition, the logistics company can win the contract volume that was placed in the bid by expressing their experience and know-how, and proposing to share the risks and benefits of the shipper's logistics operation. Therefore, it is necessary to examine the factors that can be identified during the bidding phase for logistics outsourcing and how these factors affect the satisfaction of logistics outsourcing services. Based on the factors identified in the preceding studies on logistics outsourcing partnership factors and those on logistics outsourcing determinants, a survey was conducted on experts engaged in logistics companies, performing logistics for domestic shippers and analyzed using Smart-PLS. This study presents the following implications. First, in the logistics bidding phase, the shipper should provide its logistics operation information to logistics firms to resolve uncertainties. Details An in-depth explanation of the operation details will be presented via the bidding presentation, and on-site tours of manufacturing plants and logistics centers should also be carried out if necessary. Second, in the bidding phase, logistics companies should appeal through proposals to their competitiveness, such as experience and knowledge of the logistics of the shipper, and also consider alliances with other logistics companies to supplement their insufficient logistics services. Third, logistics companies should make proposals to share profits and risks through logistics outsourcing during the bidding phase, propose accepting risks from environmental uncertainties of the shipper within its capacity to an acceptable extent, and share the benefits of carrying out the shipper's logistics.