• Title/Summary/Keyword: Housing Reconstruction Projects

Search Result 36, Processing Time 0.024 seconds

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • v.24 no.3
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

An Analysis on the Actual Condition and the Influential Factors in Reconstruction Projects for Deteriorated Apartment Housing (노후아파트의 재건축 추진 영향요인 분석 -대구광역시 사례를 중심으로-)

  • 장석하;현택수;최무현
    • Journal of the Korean housing association
    • /
    • v.10 no.1
    • /
    • pp.145-154
    • /
    • 1999
  • In this study, various factors affect on the reconstruction of the deteriorated apartment housing complex in the Taegu-City were analyzed. The conclusions obtained in this research were summarized as follows; 1) In case of 4 to 5 storied apartment buildings, those were main objects for reconstruction. The number of the buildings and households consisting apartment complex and the total building area and the ground area were appeared as major factors. Those factors were highly correlated with the consensus of reconstruction. 2) As a maximun area of reconstruction was limited, higher existing consensus capacity and its ratio affect negatively on reconstruction of deteriorated apartments. 3) The main motivation for reconstruction is disadvantages among the members of reconstruction association were main obstacles to reconstruct the deteriorated apartment buildings. Therefore, a resoanble alternatives for reconstruction plans and administrative managements were needed.

  • PDF

Analyzing the Current Situation and Issues of Urban Renewal Projects in Korea: Focused on Housing Redevelopment Projects and Housing Reconstruction Projects (전국 도시재정비사업 추진실태 분석을 통한 개선방안 고찰: 주택재개발사업 및 주택재건축사업을 중심으로)

  • Lim, Jung-Min;Lee, Young-Hwan;Kim, Jae-Sung;Kim, Sung-Youn
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.333-348
    • /
    • 2013
  • The detailed current situation of urban renewal projects which have implemented in all over the country is sorted by regional and divisional groups, researching press reports. Problems in the progress of promoting urban renewal projects made the paper are analyzed in this research. This research examined the actual condition about urban renewal projects synthetically and then, deduced the following improvement plan. First, formulating long-term renewal plan is needed. Secondly, It should be changed into the gradual urban renewal project on a small scale according to various conditions of each local area. Finally, support of the central government in consideration of local conditions should be carried out.

Housing Preference Factors in Redevelopment - A Case study of Cheongju's Residential Property - (재정비구역 주민들의 주거선호요인에 관한 연구 - 청주시 사례를 중심으로 -)

  • Jang, Yong-Hoon;Kim, Dong-Ho;Hwang, Hee-Yun
    • Journal of the Korean housing association
    • /
    • v.20 no.4
    • /
    • pp.49-57
    • /
    • 2009
  • Established redevelopment and reconstruction projects were unified into one law in 2003 when the 'Act of Urban, Residential and Environment Improvement' was enacted. However, the act only focused on the improvement of the physical state of residential environments established by maintenance projects. In order to be effective, the law also needs to improve the nonphysical aspects of the residential environment. While conducting our research and comparing it with past research, we identified the major factors of residential preferences in order to extract and analyze the nonphysical state of residential environments. As a result, we found that social and economic factors are significantly more important to residents than cultural factors. Also, we found that in each district studied the housing preferences were the most important in redevelopment and reconstruction with the exception of Sangdang-Gu (where the community was the most important factor) and Hungduk-Gu (where the social factor was most important). For future purposes, it is necessary to consider the variables according to each location in order to reflect the needs of the residents when building an apartment complex within the redevelopment and reconstruction district.

Improvement of Small-size Multi-housing Area Reconstruction Project Using AHP Analysis (AHP분석을 통한 가로주택정비사업의 개선방안)

  • Kim, Suk-Joon;Lee, Sang-Ho;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.79-85
    • /
    • 2019
  • The policy introduced recently in order to promote small-size reconstruction housing projects for rehabilitating downtown area consists of aged multi houses has been little practiced, as preferential provisions for such projects are more likely applicable for large projects. Several expert interviews and surveys were conducted to find efficient clauses to overcome the problems and their relative weights. As the results, it is revealed that 'relation of floor area ratio' and 'relaxation of building height limit criteria' are the most effective whereas 'purchasing and operating of residents' common facilities with public fund' is little. The study results would be a great interests for public institutions to rebuild aged housing area without destroying local communities and to provide socially disadvantaged class with rental housing at the same time.

A FUNDAMENTAL STUDY ON IMPROVING PROCESS BY APPLYING CONSTRUCTION MANAGEMENT(CM) METHODS TO HOUSING RECONSTRUCTION PROJECTS

  • Kyunghwan Ahn;Keunwon Lee;Myungun Kim;Byungjoo Kang;Won Kwon;Jaeyoul Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1497-1502
    • /
    • 2009
  • Due to the construction union's inefficient manner of carrying out their construction projects, lot's of conflicts and arguments among the union members are happening, so the proper model of reconstruction and process at each level of projects are also being recognized as an important part of the industry. So I would like to present an ideal process model of home reconstruction industry. Here below I'm presenting the benefits of this model when its applied properly. Through the study of information gained from the survey of residents, benefits such as AHP, analysis of SPSS, reduced construction time, budget cut, etc. will be produced

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.

A Study on the Aspect of Change of Residential Environment after the Cancellation of Housing Renewal District - Focusing on Daegu Metropolitan City - (정비구역 해제 후 주거환경 변화 양상에 관한 연구 - 대구광역시를 중심으로 -)

  • Kim, Ji-Yeon;Lee, Sang-Hong;Kim, Young-Hwa
    • Journal of the Korean housing association
    • /
    • v.27 no.1
    • /
    • pp.51-61
    • /
    • 2016
  • Under the guise of a residential environment improvement, distendedly designated Pre-Housing Renewal districts and Renewal Districts by Basic Plan for Renewal Projects are not promoted and leaved for a long-term so that residential problems have become worse. In case of the canceled Housing Renewal district, at the time when the district are canceled, the residential environment has become already superannuated for more than 10 years but there is no follow-up plan to manage that problem so that the exact management plan for those neglected districts is urgently needed. Therefore, the purpose of this study is to analyze the aspect of change of residential environment after the cancellation and indicate appearing problems by conducting on the case of Canceled districts of Daegu Housing Renewal District. This study will be the first step to seek practical management measures for canceled districts, and on the basis of this, the research will become a precedent to seek the sustainable planning measures for the designation and management of Renewal Projects from now on.

A Study on the CM Application to the Apartment Reconstruction Project - Focused on the CM Work Scope in the Reconstruction Project - (공동주택 재건축사업의 건설사업관리 적용방안에 관한 연구)

  • Kim Kwan-Whae;Yoo Moung Nam;Seo Jae-Woong;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.251-256
    • /
    • 2001
  • After the late 70's, the apartment housing have been constructed numerously, but the apartment housing has been deteriorated and the maintenance cost has been increasingly upward as time goes by. Because of that, the reconstruction of the apartment housing is widespread in the late 90's. But as the owner, the congregation, is not an expert, there are many problems in the reconstruction projects. Thus, the necessity of the CM in the reconstruction project is getting higher, but the appropriate method for the application of the CM is not established yet. In this study, the CM work scope that is applicable in the reconstruction project is developed through the inquiry and interview to the experts. Especially, The work scope developed in this study is established to be adapted easily in the practical use for each project phase.

  • PDF