• Title/Summary/Keyword: Horizontal Drilling

Search Result 54, Processing Time 0.02 seconds

Estimation of Drilling Velocity for Horizontal Wells Based on Alluvial Sediment Characteristics (충적층 입자 특성을 고려한 수평집수정 굴착 속도 추정)

  • Kim, Gyoo-Bum;Lee, Jeong-Woon;Lee, Chi-Hyung
    • The Journal of Engineering Geology
    • /
    • v.25 no.2
    • /
    • pp.273-280
    • /
    • 2015
  • Delays in horizontal well drilling when encountering heterogeneous sediments can have negative effects on the construction process at a riverbank filtration site. Grain size analysis, including calculation of the coefficient of uniformity and the coefficient of curvature, was conducted on soil samples collected at each drilling depth during the process of drilling horizontal wells. These results were then used to develop a linear equation for estimating drilling velocity using the coefficient of uniformity and the coefficient of curvature as inputs. Testing of the linear equation in other horizontal wells indicates that the equation is most appropriate for coarse-sand-sized and well-sorted sediment. Because this study was conducted in a region with small- to medium-sized streams, more data are needed from larger rivers to modify the general equation. Our results will provide better estimates of drilling velocity, in turn enabling more detailed design and more effective construction management at riverbank filtration sites.

Evaluation of Flow Characteristics of Mud Treatment System for Onshore Drilling (육상시추용 Mud treatment system의 유동특성 평가)

  • Kim, Seung-Chan;Chun, Joong-Ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.763-772
    • /
    • 2021
  • Drilling Mud Treatment Systems are widely used for Oil Gas drilling mud circulation, horizontal directional drilling mud recycling, geothermal drilling, mining, coal exploration drilling, water well drilling. Degasser is a device used in drilling to remove gasses from drilling fluid which could otherwise form bubbles. For small amounts of entrained gas in a drilling fluid, the degasser can play a major role of removing small bubbles that a liquid film has enveloped and entrapped. As with the desander, its purpose is to remove unwanted solids from the mud system. The smaller cones allow the desilter to efficiently remove smaller diameter drill solids. In this study, a simulation study is conducted on the degasser of the facility in the Mud Treatment System to conduct a performance review on the gas separation in the mud.

Prediction of Geological Condition Ahead of Tunnel Face Using Hydraulic Drilling Data (유압 천공데이터를 이용한 터널 굴진면 전방 지질상태 예측)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Kim, Kwang-Sik;Yim, Sung-Bin;Seo, Kyoung-Won
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.483-492
    • /
    • 2009
  • During construction of a tunnel and underground structure, it is very important to acquire accurate information of the rock mass will be excavated. In this study, the drill monitoring method was applied for rapid prediction of geological condition ahead of the tunnel face. Mechanical data(speed, torque and feed pressure) from drilling process using a hydraulic drilling machine were analyzed to assess rock mass characteristics. Rock mass information acquired during excavation from drilling monitoring were compared with results from horizontal boring and tunnel seismic profiling(TSP). As the result, the drilling monitoring method is useful to assess rock mass condition such as geological structures and physical properties ahead of the tunnel face.

Geomechanical study of well stability in high-pressure, high-temperature conditions

  • Moradi, Seyyed Shahab Tabatabaee;Nikolaev, Nikolay I.;Chudinova, Inna V.;Martel, Aleksander S.
    • Geomechanics and Engineering
    • /
    • v.16 no.3
    • /
    • pp.331-339
    • /
    • 2018
  • Worldwide growth in hydrocarbon and energy demand is driving the oil and gas companies to drill more wells in complex situations such as areas with high-pressure, high-temperature conditions. As a result, in recent years the number of wells in these conditions have been increased significantly. Wellbore instability is one of the main issues during the drilling operation especially for directional and horizontal wells. Many researchers have studied the wellbore stability in complex situations and developed mathematical models to mitigate the instability problems before drilling operation. In this work, a fully coupled thermoporoelastic model is developed to study the well stability in high-pressure, high-temperature conditions. The results show that the performance of the model is highly dependent on the truly evaluated rock mechanical properties. It is noted that the rock mechanical properties should be evaluated at elevated pressures and temperatures. However, in many works, this is skipped and the mechanical properties, which are evaluated at room conditions, are entered into the model. Therefore, an accurate stability analysis of high-pressure, high-temperature wells is achieved by measuring the rock mechanical properties at elevated pressures and temperatures, as the difference between the model outputs is significant.

An Experimental Study of Cuttings Transport in Directional Slim Hole Drilling (방향성 소구경 굴착의 입자 이송특성에 관한 연구)

  • Han, Sang-Mok;Kim, Jeong-Hwan;Hwang, Young-Kyu;Woo, Nam-Sub;Kim, Young-Ju
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.2
    • /
    • pp.20-25
    • /
    • 2012
  • During drilling, the precipitation velocity of cuttings within an annulus depends on the density and configuration of the cuttings, and on the density, viscosity, and rheological characteristics of the drilling fluid. In directional drilling in particular, it is difficult to adjust and control the cuttings. In contrast to vertical drilling, it is very important to evaluate the flow characteristics of a drilling flow field. However, research on the transfer features of cuttings is inadequate. In this study, in order to identify transfer features of cuttings, an experiment was performed under wide-ranging conditions by constructing a slim hole annulus ($44mm{\times}30mm$) device. In this experiment, the particle volume fraction were influenced by particle size, particle concentration within the flow, pipe rotation, flow volume, and inclination of the annulus. In addition, a mathematical formula for volumetric concentration was deduced and compared to the test results and behavior of cuttings under the other drilling condition was made to be predicted. Therefore, this study can provide meaningful data for vertical and horizontal drilling, and for directional drilling.

Numerical Approach to Investigate the Effect of Mud Pressure on the Borehole Stability during Horizontal Directional Drilling (수평굴착 시 점토압력이 굴착공의 안정에 미치는 영향에 관한 수치해석적 연구)

  • Kang, Jae Mo;Lee, Janggeun;Bae, Kyu-Jin;Moon, Changyeul;Ban, Hoki
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.12
    • /
    • pp.71-76
    • /
    • 2015
  • Recently, people are increasingly interested in horizontal directional drilling (HDD) to construct oil and gas pipeline and utility pipeline in the urban area as one of trenchless methods. One of major issues during the HDD is the collapse of borehole, which may be the potential causes of ground collapse. This study investigated the effect of mud pressure on the borehole stability, using finite element analysis. Since the borehole is being drilled with a certain angle, three dimensional analysis should be performed. The borehole stability was examined by applying two different types of mud pressures, i.e., uniform and non-uniform, to the exterior surface of borehole. The results show that the high mud pressure at the beginning of drilling, i.e., at shallow depth, causes the borehole collapse, whereas the borehole was stable even at high mud pressure as the drilling depth increases. It can be said that the determination of maximum mud pressure is strongly related to the drilling depth.

The feasibility study for the building integrated geothermal system using the horizontal heat exchanger (수평형 지중열교환기를 이용한 건물일체형 지열시스템의 도입타당성 분석)

  • Chae, Ho-Byung;Nam, Yujin;Yoon, Sung-Hoon
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.1
    • /
    • pp.81-87
    • /
    • 2015
  • Recently, in order to prevent increasing energy usages in the international community, many countries have attempted to develop the innovative renewable energy systems. Among the renewable energy systems, Ground source heat pump(GSHP) system which supply the heating, cooling and hot water in the building has been attracted by its stability of heat production and high efficiency. However, the initial drilling costs become very expensive and the construction period takes longer the other systems, because GSHP system needs more than 100 m depth drilling. In this study, in order to reduce initial costs of the GSHP, the building integrated geothermal system using the horizontal heat exchanger was developed. The heating and cooling load in the standard housing model was calculated by a simulation and the system design capacity in the high-rise apartment was decided by the total load. Based on the system design capacity, the high-rise apartments were applied to a BIGS and vertical GSHP system and there are analyzed about initial costs. In the result, the initial cost of BIGS could reduce 24% of the initial cost of the vertical GSHP system.

Current R&Ds Status for Shale Gas Extraction (셰일가스 생산에 관한 연구개발 현황)

  • Han, Bangwoo;Kim, Hak-Joon;Kim, Yong-Jin;Kim, Han-Seok
    • Transactions of the KSME C: Technology and Education
    • /
    • v.1 no.1
    • /
    • pp.91-98
    • /
    • 2013
  • Shale gas is in the limelight as one of the new energy sources under the circumstances of unstable energy supply and high energy consumption. It is expected to change dynamics of global energy markets due to its abundant resources and global distribution. Shale gas extraction process consists of drilling, fracturing and production. We have surveyed the technologies required for shale gas developments such as a horizontal drilling, a hydraulic fracturing and so on, the environmental issues occurred during the development, the additional technologies to solve the environmental problems and the current research and developments status.

A STUDY ON THE TEMPERATURE CHANGES OF BONE TISSUES DURING IMPLANT SITE PREPARATION (임플랜트 식립부위 형성시 골조직의 온도변화에 관한 연구)

  • Kim Pyung-Il;Kim Yung-Soo;Jang Kyung-Soo;Kim Chang-Whe
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.40 no.1
    • /
    • pp.1-17
    • /
    • 2002
  • The purpose of this study is to examine the possibility of thermal injury to bone tissues during an implant site preparation under the same condition as a typical clinical practice of $Br{\aa}nemark$ implant system. All the burs for $Br{\aa}nemark$ implant system were studied except the round bur The experiments involved 880 drilling cases : 50 cases for each of the 5 steps of NP, 5 steps of RP, and 7 steps of WP, all including srew tap, and 30 cases of 2mm twist drill. For precision drilling, a precision handpiece restraining system was developed (Eungyong Machinery Co., Korea). The system kept the drill parallel to the drilling path and allowed horizontal adjustment of the drill with as little as $1{\mu}m$ increment. The thermocouple insertion hole. that is 0.9mm in diameter and 8mm in depth, was prepared 0.2mm away from the tapping bur the last drilling step. The temperatures due to countersink, pilot drill, and other drills were measured at the surface of the bone, at the depths of 4mm and 8mm respectively. Countersink drilling temperature was measured by attaching the tip of a thermocouple at the rim of the countersink. To assure temperature measurement at the desired depths, 'bent-thermocouples' with their tips of 4 and 8mm bent at $120^{\circ}$ were used. The profiles of temperature variation were recorded continuously at one second interval using a thermometer with memory function (Fluke Co. U.S.A.) and 0.7mm thermocouples (Omega Co., U.S.A.). To simulate typical clinical conditions, 35mm square samples of bovine scapular bone were utilized. The samples were approximately 20mm thick with the cortical thickness on the drilling side ranging from 1 to 2mm. A sample was placed in a container of saline solution so that its lower half is submerged into the solution and the upper half exposed to the room air, which averaged $24.9^{\circ}C$. The temperature of the saline solution was maintained at $36.5^{\circ}C$ using an electric heater (J. O Tech Co., Korea). This experimental condition was similar to that of a patient s opened mouth. The study revealed that a 2mm twist drill required greatest attention. As a guide drill, a twist drill is required to bore through a 'virgin bone,' rather than merely enlarging an already drilled hole as is the case with other drills. This typically generates greater amount of heat. Furthermore, one tends to apply a greater pressure to overcome drilling difficulty, thus producing even greater amount heat. 150 experiments were conducted for 2mm twist drill. For 140 cases, drill pressure of 750g was sufficient, and 10 cases required additional 500 or 100g of drilling pressure. In case of the former. 3 of the 140 cases produced the temperature greater than $47^{\circ}C$, the threshold temperature of degeneration of bone tissue (1983. Eriksson et al.) which is also the reference temperature in this study. In each of the 10 cases requiring extra pressure, the temperature exceeded the reference temperature. More significantly, a surge of heat was observed in each of these cases This observations led to addtional 20 drilling experiments on dense bones. For 10 of these cases, the pressure of 1,250g was applied. For the other 10, 1.750g were applied. In each of these cases, it was also observed that the temperature rose abruptly far above the thresh old temperature of $47^{\circ}C$, sometimes even to 70 or $80^{\circ}C$. It was also observed that the increased drilling pressure influenced the shortening of drilling time more than the rise of drilling temperature. This suggests the desirability of clinically reconsidering application of extra pressures to prevent possible injury to bone tissues. An analysis of these two extra pressure groups of 1,250g and 1,750g revealed that the t-statistics for reduced amount of drilling time due to extra pressure and increased peak temperature due to the same were 10.80 and 2.08 respectively suggesting that drilling time was more influenced than temperature. All the subsequent drillings after the drilling with a 2mm twist drill did not produce excessive heat, i.e. the heat generation is at the same or below the body temperature level. Some of screw tap, pilot, and countersink showed negative correlation coefficients between the generated heat and the drilling time. indicating the more the drilling time, the lower the temperature. The study also revealed that the drilling time was increased as a function of frequency of the use of the drill. Under the drilling pressure of 750g, it was revealed that the drilling time for an old twist drill that has already drilled 40 times was 4.5 times longer than a new drill The measurement was taken for the first 10 drillings of a new drill and 10 drillings of an old drill that has already been used for 40 drillings. 'Test Statistics' of small samples t-test was 3.49, confirming that the used twist drills require longer drilling time than new ones. On the other hand, it was revealed that there was no significant difference in drilling temperature between the new drill and the old twist drill. Finally, the following conclusions were reached from this study : 1 Used drilling bur causes almost no change in drilling temperature but increase in drilling time through 50 drillings under the manufacturer-recommended cooling conditions and the drilling pressure of 750g. 2. The heat that is generated through drilling mattered only in the case of 2mm twist drills, the first drill to be used in bone drilling process for all the other drills there is no significant problem. 3. If the drilling pressure is increased when a 2mm twist drill reaches a dense bone, the temperature rises abruptly even under the manufacturer-recommended cooling conditions. 4. Drilling heat was the highest at the final moment of the drilling process.