• Title/Summary/Keyword: Hoop

Search Result 340, Processing Time 0.028 seconds

FEA Study on Hoop Stress of Multilayered SiC Composite Tube for Nuclear Fuel Cladding (핵연료 피복관용 다중층 SiC 복합체 튜브의 Hoop Stress 전산모사 연구)

  • Lee, Hyeon-Geun;Kim, Daejong;Park, Ji Yeon;Kim, Weon-Ju
    • Journal of the Korean Ceramic Society
    • /
    • v.51 no.5
    • /
    • pp.435-441
    • /
    • 2014
  • Silicon carbide-based ceramics and their composites have been studied for application to fusion and advanced fission energy systems. For fission reactors, $SiC_f$/SiC composites can be applied to core structural materials. Multilayered SiC composite fuel cladding, owing to its superior high temperature strength and low hydrogen generation under severe accident conditions, is a candidate for the replacement of zirconium alloy cladding. The SiC composite cladding has to retain its mechanical properties and original structure under the inner pressure caused by fission products; as such it can be applied as a cladding in fission reactor. A hoop strength test using an expandable polyurethane plug was designed in order to evaluate the mechanical properties of the fuel cladding. In this paper, a hoop strength test of the multilayered SiC composite tube for nuclear fuel cladding was simulated using FEA. The stress caused by the plug was distributed nonuniformly because of the friction coefficient difference between the inner surface of the tube and the plug. Hoop stress and shear stress at the tube was evaluated and the relationship between the concentrated stress at the inner layer of the tube and the fracture behavior of the tube was investigated.

Hysteretic Behavior of R/C Shear Wall with Various Lateral Reinforcements in Boundary Columns for Cyclic Lateral Load (경계부재내 횡보강근 배근방법에 따른 R/C전단벽의 반복하중에 대한 이력거동)

  • Seo, Soo-Yeon;Oh, Tae-Gun;Kim, Kyeong-Tae;Yoon, Seong-Joe
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.3
    • /
    • pp.357-366
    • /
    • 2010
  • This paper presents experimental results about shear wall with various lateral reinforcement details in boundary elements. The research objective is to study the structural behavior of shear wall with boundary column confined by rectangular spiral hoops and headed cross ties developed to improve workability in the fabrication of boundary columns. These two details can be fabricated in a factory and put together on-site after being delivered so that the construction work may be reduced. Main parameters in the experimental study were the types of hoop and cross tie: rectangular spiral hoop and headed cross tie vs. standard hoop and cross tie with hook. Four half scaled shear wall specimens with babel shape were made and tested by applying horizontal cyclic load under constant axial force, 10% of nominal compressive strength of concrete. Based on the test result, it was shown that the shear wall with rectangular spiral hoop and headed cross tie in boundary columns has structural capacity compatible with conventional shear wall. The specimen SW-Hh which has bigger hoop bar and higher volumetric ratio of transverse reinforcements than other showed improved energy dissipating characteristic but it presented a rapid reduction of strength after peak point. The results indicates that, it is necessary to consider volumetric ratio of transverse reinforcements as well as hoop space in designing of shear wall with boundary columns for improved strength and ductility.

Moment-Curvature Relationship of RC Structural Walls with Confined Boundary Elements Using Pre-Fabricated Rectangular Continuous Hoops (사각 연속횡보강 선조립철근으로 단부횡보강된 RC 구조벽체의 모멘트-곡률 관계)

  • Kim, Hui-Do;Lee, Seung-Hyun;Cho, Jae-Hui;Kim, Sung-Hyun;Kang, Su-Min
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.1
    • /
    • pp.45-55
    • /
    • 2022
  • Because boundary confinement details proposed in the current design standards are significantly inferior in workability and production quality, it is necessary to develop boundary confinement details of RC structural walls that are capable of ensuring seismic performance and workability. With the recent development of the wire rod manufacturing technology, various pre-fabricated continuous hoop details can be manufactured. In this study, an analysis was conducted on the moment-curvature relationship of RC structural walls to which the pre-fabricated continuous hoop details were applied. According to the nonlinear cross-section analysis, the RC structure wall to which the details of the pre-fabricated continuous hoop details are applied can ensure seismic performance as the area of the pre-fabricated continuous hoop increases. Based on these research results, when applying the pre-fabricated continuous hoop in detail, it is necessary to secure the area of the pre-fabricated continuous hoop as much as the area of the existing boundary confinement.

Constructability and Economic Evaluation of Continuous Hoop Reinforcement Method

  • Kang, Su-Min;Park, Sung-Woo;Jang, Se-Woong;Jin, Jong-Min;Eom, Tae-Sung;Park, Hong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.291-305
    • /
    • 2013
  • This paper presents the continuous hoop reinforcement method as a means to overcome the difficulty of rebar construction due to the seismic detail of lateral reinforcement. Because the continuous hoop has no seismic hook, and there is less interference during the rebar work, rebar quantities and construction time can be reduced. Since the details of column and beam continuous hoops are different from those of conventional lateral reinforcements, the construction method should be developed through mock-up tests. The length of the beam mock-up is 8m and the section size is $500mm{\times}700mm$, the height of the column mock-up is 2.8m and 4m, and the section size is $800{\times}800mm$. The length and the size are determined based on the elements that are generally used in reinforced concrete basement parking lots and office buildings. The results of the mock-up test showed that the quantities of rebar could be reduced by 20% and the time could be reduced by up to 40% compared with conventional lateral reinforcements.

Stresses around an underground opening with sharp corners due to non-symmetrical surface load

  • Karinski, Y.S.;Yankelevsky, D.Z.;Antes, M.Y.
    • Structural Engineering and Mechanics
    • /
    • v.31 no.6
    • /
    • pp.679-696
    • /
    • 2009
  • The paper aims at analyzing the stress distribution around an underground opening that is subjected to non-symmetrical surface loading with emphasis on opening shapes with sharp corners and the stress concentrations developed at these locations. The analysis is performed utilizing the BIE method coupled with the Neumann's series. In order to implement this approach, the special recurrent relations for half plane were proven and the modified Shanks transform was incorporated to accelerate the series convergence. To demonstrate the capability of the developed approach, a horseshoe shape opening with sharp corners was investigated and the location and magnitude of the maximum hoop stress was calculated. The dependence of the maximum hoop stress location on the parameters of the surface loading (degree of asymmetry, size of loaded area) and of the opening (the opening height) was studied. It was found that the absolute magnitude of the maximum hoop stress (for all possible surface loading locations) is developed at the roof points when the opening height/width ratio is relatively large or when the pressure loading area is relatively narrow (compared to the roof arch radius), and contrarily, when the opening height/width ratio is relatively small or when the surface pressure is applied to a relatively wide area, the absolute magnitude of the maximum hoop stress is developed at the bottom sharp corner points.

Allowable peak heat-up cladding temperature for spent fuel integrity during interim-dry storage

  • Jang, Ki-Nam;Cha, Hyun-Jin;Kim, Kyu-Tae
    • Nuclear Engineering and Technology
    • /
    • v.49 no.8
    • /
    • pp.1740-1747
    • /
    • 2017
  • To investigate allowable peak cladding temperature and hoop stress for maintenance of cladding integrity during interim-dry storage and subsequent transport, zirconium alloy cladding tubes were hydrogen-charged to generate 250 ppm and 500 ppm hydrogen contents, simulating spent nuclear fuel degradation. The hydrogen-charged specimens were heated to four peak temperatures of $250^{\circ}C$, $300^{\circ}C$, $350^{\circ}C$, and $400^{\circ}C$, and then cooled to room temperature at cooling rates of $0.3^{\circ}C/min$ under three tensile hoop stresses of 80 MPa, 100 MPa, and 120 MPa. The cool-down specimens showed that high peak heat-up temperature led to lower hydrogen content and that larger tensile hoop stress generated larger radial hydride fraction and consequently lower plastic elongation. Based on these out-of-pile cladding tube test results only, it may be said that peak cladding temperature should be limited to a level < $250^{\circ}C$, regardless of the cladding hoop stress, to ensure cladding integrity during interim-dry storage and subsequent transport.

Analysis of Characteristics of Spent Fuels on Long-Term Dry Storage Condition

  • Yoon, Suji;Park, Kwangheon;Yun, Hyungju
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.2
    • /
    • pp.205-214
    • /
    • 2021
  • Currently, the interim storage pools of spent fuels in South Korea are expected to become saturated from 2024. It is required to prepare an operation plan of a domestic dry storage facility during a long-term period, with the researches on safety evaluation methods. This study modified the FRAPCON code to predict the spent fuel integrity evaluation such as the axial cladding temperature, the hoop stress and hydrogen distribution in dry storage. The cladding temperature in dry storage was calculated using the COBRA-SFS code with the burnup information which was calculated using the FRAPCON code. The hoop stress was calculated using the ideal gas equation with spent fuel information such as rod internal pressure. Numerical analysis method was used to calculate the degree of hydrogen diffusion according to the hydrogen concentration and temperature distribution during a dry storage period. Before 50 years of dry storage, the cladding temperature and hoop stress decreased rapidly. However, after 50 years, they decreased gradually and the cladding temperature was below 400 K. The initial temperature distribution and hydrogen concentration showed a parabolic line, but hydrogen was transferred by the hydrogen concentration and temperature gradient over time.

A Study on Design of Type IV Hydrogen Pressure Vessels with Filament Winding Method (필라멘트 와인딩 공법을 적용한 타입 IV 수소 압력용기 설계 연구)

  • Sungjin Ahn;Hyunbum Park
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.6
    • /
    • pp.127-132
    • /
    • 2023
  • In this study, designing of a Type 4 pressure vessel using the filament winding method was conducted. In order to prevent leakage in consideration of the design of the hydrogen storage tank, a liner was designed by applying high-density polyethylene (HDPE), and the composite structure was designed by stacking carbon/epoxy in the hoop and helical directions. As a theoretical approach, the angle of the helical fiber and fiber thickness of each hoop and helix were designed. The safety of the design was verified using the commercial software ANSYS.

The Effect of Weight-shift Training with Hula Hoop on Weight Shift Change and Gait in Stroke Patients: A Cross - Sectional Pilot Study (훌라후프를 이용한 체중이동훈련이 뇌졸중 환자의 체중이동변화와 보행에 미치는 영향: 단면 예비연구)

  • Ko, Yeoun-Ju;Lee, Han-Suk
    • Journal of the Korean Society of Physical Medicine
    • /
    • v.12 no.1
    • /
    • pp.9-14
    • /
    • 2017
  • PURPOSE: To evaluate the effect of weight shift training with Hula Hoop on weight shift change and gait in stroke patients. METHODS: Ten stroke patients were enrolled in this study, and randomly divided into 2 groups. The study group underwent weight shift training with Hula Hoop, while the control group received general physical therapy that included weight shift training. All the studies were performed over a period of 4 weeks. Before and after the intervention, plantar pressure and performance in the 10 m walk test (10MWT) were assessed. Wilcoxon signed ranks test was used to compare the change from before to after the intervention in each group. The differences between the study and control groups were analyzed by using the Mann-Whitney test. RESULTS: After 4 weeks of intervention, the change in weight shift and performance in the 10MWT from before to after the experiment showed no statistical significance (p>.05). In addition, the comparison between the groups showed no significance in terms of weight-shift change, and performance in the 10MWT (p>.05). CONCLUSION: Although the difference was not statistically significant, the degree of improvement was similar to that attained with the conventional exercise treatment related to weight- shift training. During the course of the treatment, the patients received feedback through repeated training by themselves. Weight-shift training with Hula Hoop would be effective in improving the walking ability and weight-shifting on the paralyzed side of stroke patients. In the future, the effectiveness of this training would need to be validated.

Hoop Ring Test Method to Evaluate the Fiber Material Properties of Composite Motor Case (Hoop ring 시험방법을 이용한 복합재연소관의 섬유방향 물성 평가)

  • Hwang, Tae-Kyung;Park, Jae-Byum;Kim, Hyung-Kun;Lee, Sang-Woo
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.429-432
    • /
    • 2009
  • The deformation and burst pressure of composite motor case highly depends on fiber material properties. Therefore, measuring exact fiber material properties is a priority item to develop a advanced composite motor case. However, the fiber material properties in composite motor case is very sensitive on the various processing variables (equipment, operator and environmental condition etc..)and size effect, so the fiber material properties can't be measured exactly from the existing specimen test method. This paper suggests a newly developed test method, hoop ring test, that is capable of pressure testing with ring specimens extracted from real composite motor case. The results of hoop ring test showed excellent agreement with measured fiber material properties from hydro-burst test with full scale composite motor cases.

  • PDF