• 제목/요약/키워드: Hoist Scheduling

검색결과 4건 처리시간 0.022초

PCB 생산라인에서의 호이스트 스케쥴링을 위한 유전자알고리즘의 응용

  • 임준묵
    • 한국산업정보학회논문지
    • /
    • 제1권1호
    • /
    • pp.29-62
    • /
    • 1996
  • In this paper, the problem of determining cyclic schedules for a material handling hoist in the printed-circuit-board(PCB) electroplating line is considered. The objective of this research is to determine an optimal simple-cycle schedule of the hoist which in turn maximizes the line throughput rate. Previous approaches to the cyclic hoist scheduling problem are all mathematical programming-based approaches to develop cyclic schedules(Mixed Integer Programming, Linear Programming based Branch and Bound, Branch and Bound Search Method and so on). In this paper, a genetic algorithm-based approach for a single hoist scheduling in the PCB electroplating line is described. Through some experiments for the well known example data and randomly generated data, the proposed algorithm is shown to be more efficient than the previous mathematical programming-based algorithm.

An Approach to Double Hoist Scheduling in the Chemical Processes

  • Lim, Joon-Mook;Hwang, Hark
    • 한국경영과학회지
    • /
    • 제18권2호
    • /
    • pp.131-145
    • /
    • 1993
  • This paper deals with scheduling problem of the chemical process system where aircraft parts go through a given sequence of tanks filled with chemical solutions. The system has two hoists which move carriers holding the parts between tanks. A mixed integer programming model is developed from which a maximum throughput schedule can be found for the hoist movements. To show the validity of the model, a real world problem is solved and the results are compared with those with an existing approach.

  • PDF

단일 호이스트 생산시스템에서 다양한 주문을 처리하기 위한 분지한계 기반의 휴리스틱 일정계획 (Branch-and-Bound Based Heuristic Scheduling for the Single-Hoist and Multiple-Products Production System)

  • 이정구;김정배;고시근
    • 대한산업공학회지
    • /
    • 제42권3호
    • /
    • pp.173-181
    • /
    • 2016
  • This paper deals with the single-hoist and multiple-products scheduling problem. Although a mixed integer linear programming model for the problem was developed earlier, a branch-and-bound based heuristic algorithm is proposed in this paper to solve the big-size problems in real situation. The algorithm is capable of handling problems incorporating different product types, jobs in the process, and tank capacities. Using a small example problem the procedure of the heuristic algorithm is explained. To assess the performance of the heuristic we generate a bigger example problem and compare the results of the algorithm proposed in this paper with the optimal solutions derived from the mathematical model of earlier research. The comparison shows that the heuristic has very good performance and the computation time is sufficiently short to use the algorithm in real situation.

OHT 작업 계획을 위한 실시간 스케줄링 시스템 개발 (Development of Real-Time Scheduling System for OHT Mission Planning)

  • 이복주;박희문;권용환;한경아;서경민
    • 정보처리학회논문지:컴퓨터 및 통신 시스템
    • /
    • 제10권7호
    • /
    • pp.205-214
    • /
    • 2021
  • 반도체 물류 공정은 스마트 제조를 위해 물류 자동화 시스템을 운영한다. 물류 자동화 시스템 중 하나인 OCS(OHT Control System)는 천장에 설치된 레일을 따라 이동하는 OHT(Overhead Hoist Transport)를 자율적으로 제어하는 시스템이다. 본 논문은 반도체 물류 공정에서 효율적인 작업 계획을 위한 실시간 스케줄링 시스템을 제안한다. 제안 시스템의 주된 역할은 OHT 할당 및 최적경로 생성이며, 전체 OCS에서 별도의 독립된 시스템으로 개발하여 시스템의 수정 및 확장이 용이하도록 구성하였다. 시스템 개발을 위해 반도체 물류의 기능 요구사항을 식별하고, 명령 유형에 따른 OHT 제어 시나리오를 정의하였다. 그리고 시스템 간 연동 확장성을 위해 국제반도체장비재료협회(SEMI) 규격을 적용하여 시퀀스 다이어그램과 인터페이스 메시지를 설계하였다. 기능 요구사항과 설계 문서를 바탕으로 개발된 스케줄링 시스템은 Main 시스템 및 데이터베이스와 실시간 연동되어 OHT의 최적할당 및 경로제어를 수행한다. 개발 시스템의 기능 검증을 위해 실제 반도체 물류 현장에서 OCS Main 시스템과 통합시험을 수행하였다. 6가지의 기본 시나리오와 2가지의 예외 시나리오에서 개발 시스템이 OHT 최적할당과 경로제어를 성공적으로 수행함을 검증하였다.