1 |
Chen, H., Chu, C., and Proth, J. M. (1998), Cyclic scheduling of a hoist with time window constraints, IEEE Transactions on Robotics and Automation, 14(1), 144-152.
DOI
|
2 |
Hindi, K. S. and Fleszar, K. (2004), A constraint propagation heuristic for the single-hoist multiple-products scheduling problem, Computers and Industrial Engineering, 47(1), 91-101.
DOI
|
3 |
Kumar, P. R. (1994), Scheduling semiconductor manufacturing plants, IEEE Control System, 14(6), 33-40.
DOI
|
4 |
Kuntay, I., Xu, Q., Uygun, K., and Huang, Y. (2006), Environmentally conscious hoist scheduling for electroplating facilities, Chemical Engineering Communications, 193(3), 273-292.
DOI
|
5 |
Lei, L. and Wang, T. J. (1989), A proof : The cyclic HSP is NP-complete, Technical Report 89-0016, Graduate School of Management, Rutgers University.
|
6 |
Lei, L. and Wang, T. J. (1994), Determining optimal cyclic hoist schedules in a single-hoist electroplating line, IIE Transactions, 26(2), 25-33.
DOI
|
7 |
Lim, J. M. (1997), A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line, Computers and Industrial Engineering, 33(3/4), 789-792.
DOI
|
8 |
Liu, C. W., Zhao, C. Y., and Xu, Q. (2012), Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and fresh water minimization, Chemical Engineering Science, 68(1), 202-214.
DOI
|
9 |
Paul, H. J., Bierwirth, C., and Kopfer, H. (2007), A heuristic scheduling procedure for multi-item hoist production lines, International Journal of Production Economics, 105(1), 54-69.
DOI
|
10 |
Phillips, L. W. and Unger, P. S. (1976), Mathematical programming solution of a hoist scheduling programm, AIIE Transactions, 28(2), 219-225.
|
11 |
Shapiro, G. W. and Nuttle, H. L. (1988), Hoist scheduling for a PCB electroplating, IIE Transactions, 20(2), 157-167.
DOI
|
12 |
Tian, N., Che, A., and Feng, J. (2013), AIChE Letter: Real-time hoist scheduling for multistage material handling process under uncertainties, AIChE Journal, 59(4), 1046-1048.
DOI
|
13 |
Xu, Q. and Huang, Y. (2004), Graph-assisted optimal cyclic hoist scheduling for environmentally benign electroplating, Industrial and Engineering Chemistry Research, 43(26), 8307-8316.
DOI
|
14 |
Yih, Y. (1994), An algorithm for hoist scheduling problems, International Journal of Production Research, 32(3), 501-516.
DOI
|
15 |
Yin, N. C. and Yih, Y. (1992), Crane scheduling in a flexible electroplating line : A tolerance-based approach, Journal of Electronics Manufacturing, 2(4), 137-144.
DOI
|
16 |
Zhao, C., Fu, J., and Xu, Q. (2013), Real-time dynamic hoist scheduling for multistage material handling process under uncertainties, AIChE Journal, 59(2), 465-482.
DOI
|