Deeper Underground Greater Metropolitan Express Train Network Effect (긴급제언 - 대심도 광역지하급행철도 네트워크 효과)

  • Lee, Sun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.4
    • /
    • pp.45-50
    • /
    • 2009
  • The modal split structure of the Korea's transportation system has been dominated by road-oriented structure. The shortage of the inftrastructure to accommodate the rapidly increasing travel demand has brought about socio-economic losses such as severe traffic congestion and high logistic costs, and thereby weakened the competitiveness of the country. Highway transportation sector is more vulnerable to energy consumption comparing with railway sector since the highway sector is dependent mostly on fossil fuels for its energy source. In 2006 annual road cogestion costs in Korea reached 24.6 trillion won, with an average annual growth rate of 5.4%. The annual road congestion cost of intercity highways were 9.2 trillion won. As the new cities that recently developed are located far from Seoul area, the boundary of commuting in Seoul metropolitan area is extended. It makes passengers have longer trips with longer travel time, and the congestion problem to be more serious. In this regards, Gyeonggi Provincial Government proposed a deeper underground metropolitan express train system for the greater Metropolitan area. which is named as GTX. Gyeonggi Province suggested 3 key underground lines, based on the outcome of the feasibility study conducted by the Korea Society of Transportation, and submitted to the Ministry of Land Transportation and Maritime Affairs for its review. If the project is approved for construction and completed in 2016, the daily volume of surface traffic bound for Seoul will be reduced substantially and therefore the users will be benefitted for time savings by an annual amount of 2 trilion won every year.

  • PDF

A Study on the Operational Results of SMART Highway Test-bed (스마트하이웨이 테스트베드 운영결과에 대한 고찰)

  • Jin, Goou-Dong;Kim, Sug-Tae;Lee, Soo-Yang;Kim, Chun-Gyung;Park, Ji-Hun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.4
    • /
    • pp.27-39
    • /
    • 2015
  • This study addressed the process to construct, operate, verify the test beds, which had been equipped with a variety of core technologies such as WAVE, Road-Radar, Smart Tolling developed by Smart Highway Project. We have met our research goals, but there were limitations to secure the performance and user feedback because of small scale and short operating time. So, we will enhance user safety, convenience and comfort by accumulating and analyzing big data then improving testbeds and related technologies through subsequent research projects for a long time.

PPI (PRIVATE PARTICIPATION IN INFRASTRUCTURE) STATUS OF SOC (SOCIAL OVERHEAD CAPITALS) AND ITS IMPROVEMENT IN KOREA

  • Sugk-Yong Yoon ;Sung-Won Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.353-359
    • /
    • 2005
  • The infrastructure in korea has been improved drastically since July 7th, 1970 which was the first highway completed date in Korea (Seoul-Pusan). This is one of the major factors for the competitiveness of a country. Now the total length of highway in Korea is more than 2000km. However Korea is 11th in the trade volume in the world, the SOC level of Korea is around 20th at most in the world (IMD 2004). The infrastructure in Korea comparing other developed countries is far below, which gives the impact of cost of goods, even twice expensive in transporting goods through highways, railways and ports etc. Now the government budget is gradually spending more for welfare and health care side. The most of additional expense of welfare is increasing rather than SOC budget is decreasing or staying as it is as 2003. The government may think that the level of SOC is enough in point of view of preference input of budget such as welfare and health care etc. However the SOC level in Korea is far form the competitiveness of the country. The main points of this paper is to show that where Korea is in point of SOC level to go for developed country, and what to do to facilitate BOT, BTO and BTL projects. Korean government has tried to improve the practice of PPI (Private Participation of Infrastructure) with the Act on Private Capital Inducement in 1994 and the Act on Private Investment in 1997.

  • PDF

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

Study on safety early-warning model of bridge underwater pile foundations

  • Xue-feng Zhang;Chun-xia Song
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.2
    • /
    • pp.107-116
    • /
    • 2023
  • The health condition of of deep water high pile foundation is vital to the safe operation of bridges. However, pier foundations are vulnerable to damage in deep water due to exposure to sea torrents and corrosive environments over an extended period. In this paper, combined with aninvestigation and analysis of the typical damage characteristics of main pier group pile foundations, we study the safety monitoring and real-time early warning technology of the deep water high pile foundations, we propose an early warning index item and early warning threshold of deep water high pile foundation by utilizing a numerical simulation analysis and referring to domestic and foreign standards and literature. First, we combine the characteristics of structures and draw on more mature evaluation theories and experience in civil engineering-related fields such as dam and bridge engineering. Then, we establish a scheme consisting of a Early Warning Index Systemand evaluation model based on the analytic hierarchy process and constant weight evaluation method and apply the research results to a project based on the Jiashao bridge in Zhejiang province, China. Finally, we verify the rationality and reliability of the Early Warning Index Systemof the Deep Water High Pile Foundations.

Characteristic Analysis for Weight Values of Evaluation Items by Traffic Safety Project Type (교통안전사업 유형별 평가항목의 가중치 특성분석)

  • Lee, Heewon;Lee, Jisun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.147-156
    • /
    • 2018
  • PURPOSES : The purpose of this study is to analyze the characteristics of the weight values of evaluation items by traffic safety project type. METHODS : In general, a large-scale investment in projects such as the traffic safety project requires economic analyses to be performed in advance. However, there is an argument for considering special characteristics of the traffic safety project. Therefore, this study conducted characteristic analysis of the weight values of evaluation items. The analysis consisted of two steps. The first step was hypothesis verification using analysis of variance (ANOVA). In this process, the authors examined whether the weight of evaluation items is the same regardless of the traffic safety project type. Based on the first step's results, the authors proceeded to the second step. The objective of this step was to analyze how different the weight values are by traffic safety project type using an analytic hierarchy process. RESULTS : According to the ANOVA test results, the benefit to cost ratios have different weight values based on traffic safety project type at the 0.01 significance level. The policy evaluation items, such as the plans connection, resident opinion, and regional equity, also showed the same results except that the result for the related plans connection was statistically significant at the 0.05 level. Based on the first step's result, the AHP analysis in the second step showed that the traffic safety projects for vulnerable users and pedestrians have very low weight values in economic evaluation factors compared with other safety project types. The weight values for vulnerable users and pedestrians were 0.29 and 0.26, respectively, in economic evaluation items. On the other hand, the weight values for other safety project types were around 0.6. Among the policy evaluation items, resident opinion showed a higher weight value than other factors, such as connection and regional equity items. CONCLUSIONS : The social and economic impact of a traffic safety project varies by project type and project characteristics. Although the economic approach is overarching and a reasonable methodology is applied for large-scale projects, it should be noted that the safety issue, especially for transportation of vulnerable uses, requires a non-economical approach. Based on the analysis results, this study suggests that the priority of the projects should be determined by separating them into independent assessment groups depending on their characteristics.

A Study on Placement of Point Detectors Based on Homogeneous Section for Travel Time Estimation in National Highway (일반국도 통행시간 추정을 위한 동질구간 기반 지점검지기 배치에 관한 연구)

  • Kim, Seong-Hyeon;Im, Gang-Won;Lee, Yeong-In
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.1 s.87
    • /
    • pp.73-84
    • /
    • 2006
  • This study was carried out to set up the logic to determine lengths of the homogeneous sections effectively in order to provide dynamic travel time on real time base for the application of the model. First, considering real time traffic pattern fluctuation, lengths of the homogeneous sections for each time period and the final homogeneous sections were determined. In order to determine lengths of the homogeneous sections according to traffic condition, the cluster analysis was used based on real time data. In order to verify the homogeneous section the case with detectors in all links and the case with detectors in homogeneous section for each time period are used. As the results of verification, each cases showed similar estimation results. The results of this study are expected to be used for National Highway traffic management and the system to Provide a traffic information in the future. According to this study, when the homogeneous section decision model are used to the ITS project for National Highway, operation cost is expected to be cut by effectively establishing point detectors.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

Selection of Long-Term Pavement Performance Sections for Development of Distress Prediction Model in National Asphalt Pavement (국도 아스팔트 포장 파손예측모델 개발을 위한 장기 관측 구간 선정에 관한 연구)

  • Kwon, Soo-Ahn;Yoo, Pyeong-Joon;Kim, Ki-Hyun;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.4 no.1 s.11
    • /
    • pp.123-134
    • /
    • 2002
  • Special pavement test sections were selected to develop a distress prediction model on asphalt pavement of National Highway. Experimental design was conducted for the selection of LTPP sections on in-service pavement(new and overlaid pavement) using several variables affecting pavement performance. Preliminary sections that satisfied the design template were chosen from the national highway database, and final selection was fixed through field inspection. The number of monitoring section is 95 including 47 overlaid pavement. A pavement distress data such as crack and rutting were collected for two years. An interim pavement performance analysis was peformed to show feasibility of performance monitoring program. Data related pavement such as traffic, weather, material characteristic and crack etc. should be collected for next project years and distress prediction model will be developed through the statistical analysis.

  • PDF

Estimation of Contingency for Highway Construction Project Using Regression Analysis (회귀분석을 이용한 고속도로 건설공사 예비비의 산정)

  • Yoon, Yoo Jung;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.617-626
    • /
    • 2006
  • The purpose of contingency estimate is to manage the increase in construction cost and the extension of the term of works due to the inevitable occurrence of uncertain situations. The aim of contingency strategies have two intentions. One thing, can be called a passive strategy, gets ready for construction cost increase due to uncertainty factors, the other thing, can be called a active strategy, gets rid of the obstruction factors of work prior to construction performance. Therefore, from the view point of medium and long term, there is necessary to accumulate data in conjunction with design modification cases and carefully analyze uncertainty factors from construction types and characters. Therefore, this thesis will analyze design modification case at a special work such as highway and select factors that affect construction cost and present contingency estimate process using regression analysis.