• Title/Summary/Keyword: High-speed rail

Search Result 817, Processing Time 0.026 seconds

Characterizing the Structure of China's Passenger Railway Network Based on the Social Network Analysis(SNA) Approaches : Focused on the 2008, 2013, and 2018 Railway Service Data, Respectively (사회 네트워크 분석 방법론에 기초한 중국의 여객 철도 네트워크 특성 분석 : 2008년, 2013년, 2018년 운행 데이터를 중심으로)

  • Zhao, Pei-Song;Lee, Jin-Hee;Lee, Man-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.10
    • /
    • pp.685-697
    • /
    • 2019
  • The study aimed to analyze the structure of China's passenger railway network in the years of 2008, 2013, and 2018, respectively. At the same time, it tried to investigate its derivative impact on the patterns of Chinese urban network. The analytical tool was based on the NetMiner4.0. In order to measure network characteristics of China's passenger railway network, it primarily focused on the degree centrality, betweenness centrality, and closeness centrality. First of all, the higher degree centralities, with a few exceptions, were observed in BeiJing, ShangHai, GuangZhou, WuHan, XiAn, ChengDu, HaErBin, and ShenYang over a decade. In contrast, the higher betweenness centralities were recorded in cities of higher development potential including WuLuMuQi, GuiYang, ShenYang, and KunMing. The closeness centrality analyses confirmed the fact that most metropoles like BeiJing, ShangHai, and GuangZhou kept the highest train accessibility during the same research period. At the same time, the opening up of a new stretch of high speed railway network has consecutively strengthened connectivity between BeiJing and TianJin. Owing to unprecedented development of railway traffic and its extensive operations, this study believes that Chinese major cities, without interruption, would pursue a series of urban policy alternatives geared towards railway stations-oriented networking and competitively try to extend their network ranges.

Development of a Quasi-Three Dimensional Train/Track/Bridge Interaction Analysis Program for Evaluating Dynamic Characteristics of High Speed Railway Bridges (고속철도 교량의 동특성 해석을 위한 준3차원 차량/궤도/교량 상호작용 해석기법의 개발)

  • 김만철
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.16 no.2
    • /
    • pp.141-151
    • /
    • 2003
  • Railway bridges are subject to dynamic loads generated by the interaction between moving vehicles and the bridge structures. These dynamic loads result in response fluctuations in bridge members. To investigate the real dynamic behavior of the bridge, therefore, a number of analytical and experimental Investigations should be carried out. In this paper, a train/track/bridge interaction analysis program for evaluating the dynamic characteristics of bridges due to KTX operation in terms of structural safety, operational safety and passenger comfort is developed. To build a practical model of train/track/bridge, Hertzian spring for wheel/rail contact modeling and Winkler element for ballast are applied. This program also used torsional degree of freedom and constraint equation based on geometrical relationship in order to take into consideration three-dimensional eccentricity effect due to the operation on double track through quasi-three dimensional analysis. To verify the developed Program, comparison has been made between the measured results and those of simulation of the typical PSC box bridge(2@40m=80m) of the KHSR bridges.

A Study on Analysis Electrical Characteristics of Cable Lenght change about area Boundary of UM71C Audio Frequency Track Circuit (고속철도 AF궤도회로경계구간 케이블길이 변화에 따른 전기특성 분석연구)

  • Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bum Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4849-4854
    • /
    • 2015
  • It has been often occurred for the outside components(BU, SVaC, DB) of UM71c AF track circuits to be broken down caused by some pieces of falling ice in the winter time or by infrastructure repairing equipments while facility maintenance works since 2004, opening of Kyeongbu High Speed Rail Express. In this paper, we proposed that we could move the outside components of UM71c track circuit out of wayside from present place. Then we can assure that the life time of those components would be extended. So we simulated the electrical characteristics by changing cable length using MATLAB Simulinks and we designed the compensation capacitor. Also, we obtained the same results as those of simulation by field demonstration test on site. The design specifications obtained from this field verification test could be applied in the absent section of track circuit, if only have a little more intensified research to compensate changed electrical characteristics and to redesign inner impedance of the track circuit.

Analysis of Slope Stability at the End of OO tunnel being Distributed by Mica Schist (운모편암 분포지인 OO 터널 종점부에서 절토사면의 안전성 분석 연구)

  • Lee, Byung-Joo;SunWoo, Choon
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.287-294
    • /
    • 2009
  • To be design the slope, the area distributed the mica schist which was metamorphosed by shale or mudstone must carefully consider the stability. Mica schist is another unstable rock for slope by schistosity, cleavage, axial plane of a fold etc. In general mica schist contains the swelling clay minerals such as smectite, vermiculite and montmorillonite. These minerals make the slope unstable. At OO tunnel construction area for the rail way of the Kyungbu high speed train, the slope of mica schist is very unstable by the distribution phenomena of the discontinuous plane such as joints which are 1-5 cm spacing and thrust and strike-slip fault. By the drilling core of this area, most RQD have 0-20%.

Excavation Support Design and Stability Analysis of Shallow Tunnel in Heavily Fractured Rock Mass (연약 파쇄 지반내 터널의 굴착.보강 설계 및 안정성 분석)

  • Shin, Hee-Soon;Synn, Joong-Ho;Park, Chan;Han, Kong-Chang;Choi, Young-Hak;Choi, Yong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.87-92
    • /
    • 2000
  • In excavation of tunnels especially located in shallow depth, it is not rare to meet geological change in excavation progress worse than expected in the initial design stage. This paper present a case study on the re-design of excavation and support system of a shallow tunnel under construction where it meets the unexpected bad geological condition during excavation. The detailed geological investigation shows that the rock mass is heavily weathered and fractured with RMR value less than 20. Considering this geological condition, the design concept is focused on the reinforcement of the ground preceding the excavation of tunnel. Two design patterns, LW-grouting & forepoling with pilot tunnelling method and the steel pipe reinforced grouting method, are suggested. Numerical analysis by FLAC shows that these two patterns give the tunnel and roof ground stable in excavation process while the original design causes severe failure zone around the tunnel and floor heaving. In point of the mechanical stability and the degree of construction, the steel pipe reinforced grouting technique proved to be good for the reinforcement of heavily fractured rock mass in tunnelling. This assessment and design process would be a guide in the construction of tunnels in heavily weathered and fractured rock mass situation.

  • PDF

Smoothed Particle Hydro-dynamic Analysis of Improvement in Sludge Conveyance Efficiency of Screw Decanter Centrifuge (입자 완화 유체 동역학 해석 기법을 이용한 스크류 디켄터형 원심분리기의 슬러지 이송 효율 향상 분석)

  • Park, Dae Woong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.39 no.3
    • /
    • pp.285-291
    • /
    • 2015
  • A centrifuge works on the principle that particles with different densities will separate at a rate proportional to the centrifugal force during high-speed rotation. Dense particles are quickly precipitated, and particles with relatively smaller densities are precipitated more slowly. A decanter-type centrifuge is used to remove, concentrate, and dehydrate sludge in a water treatment process. This is a core technology for measuring the sludge conveyance efficiency improvement. In this study, a smoothed particle hydro-dynamic analysis was performed for a decanter centrifuge used to convey sludge to evaluate the efficiency improvement. This analysis was applied to both the original centrifugal model and the design change model, which was a ball-plate rail model, to evaluate the sludge transfer efficiency.

A Study on the Spray and Combustion Characteristics of Diesel-ethanol-biodiesel Blended Fuels in a Diesel Engine (디젤엔진에서 디젤-에탄올-바이오디젤 혼합연료의 분무 및 연소 특성에 관한 연구)

  • Park, Su-Han;Youn, In-Mo;Lee, Chang-Sik
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.18 no.5
    • /
    • pp.76-84
    • /
    • 2010
  • The aim of this study is to analyze the effect of the ethanol blending in diesel-ethanol blended fuels on the spray and combustion characteristics in a common-rail four-cylinder diesel engine. For the analysis of the spray characteristics, the spray images were obtained using a high speed camera with metal-halide lamps. From these spray images, the macroscopic spray characteristics such as the spray tip penetration and spray cone angle were investigated. Also, the combustion characteristics including the combustion pressure and the rate of heat release were studied with the analysis of the exhaust emissions in diesel-ethanol blended fuel driven diesel engine. It can be confirmed from the experiment on spray characteristics of diesel-ethanol blended fuels that the increased ethanol blending ratio induced the decrease of the spray tip penetration after the end of the injection. The spray cone angle slightly increased by the blending of ethanol fuel. In the experiment on atomization characteristics, the ethanol blending caused the improvement of the diesel atomization performance. On the other hand, at the same engine load condition, the increase of the ethanol blending ratio lead to lengthen the ignition delays, and to decrease the peak combustion pressure and the rate of heat release. Totally, the combustion and emission characteristics of ULSD and DE10 showed similar characteristics. However, in the case of DE20, CO and HC rapidly increased, and $NO_x$ decreased. It can be believed that 20% ethanol disturbed the combustion of diesel-ethanol blended fuel due to the low cetane number and evaporation.

A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market (공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구)

  • Kim Min-Kee;Shin Sung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.265-270
    • /
    • 2002
  • Frequent design changes or unnecessary project executions due to illogical practice, lack of feasibility study and, hasty drive have raised problems of budget waste in Korean construction projects. Since the MOCT (Ministry of Construction & Transportation) published Master Plan for budget efficiency for government projects, there have been a lot of policy efforts for budget saving. However, it has been pointed out that cost management at the pre-construction phase, which greatly influences the cost still remains imperfect. The target cost for government clients is not being estimated reasonably, and cost controlling at the pre-construction phase is not yet being carried out properly for keeping the budget. Therefore, improved construction cost management at the pre-construction phase was proposed in this paper. The cost management systems of advanced countries were investigated for it, and the issues were drawn from the cost management systems of these countries. On the basis of the issues, the present conditions and problems of domestic construction cost management at the pre-construction phase were analyzed for suggestion.

  • PDF

A Study on the Concrete Lining Behavior due to Tunnel Deterioration (터널 열화로 인한 콘크리트 라이닝의 거동에 관한 연구)

  • Han, Young-Chul;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.21-34
    • /
    • 2014
  • This paper studies the time-dependent behaviors of tunnel and surrounding ground due to tunnel deterioration. In the first part, the literature on deterioration characteristics of tunnels was reviewed. In the second part, a numerical analysis was performed to investigate the behavior of concrete lining on the typical section of Korean high-speed rail tunnel (weathered rock) after determination of input variables related to deterioration impact. The result shows that the settlement at the crown of tunnel and surface ground increased up to 7.0% and 30.2% of the total settlements during construction stage, respectively, and the internal convergence reduction of 9.0 mm for concrete linings was generated within 30 years after completion of tunnel construction. Also the loosening height increased up to 2.55 times of tunnel height within 50 years, which is higher than that of Terzaghi's recommendation on ultimate state. Due to this process of extending zones, it is found that additional loads were applied to concrete lining with the axial stress about 3.20~3.66 MPa, which accelerates tunnel deterioration. Finally the quantitative design approach to evaluate time-dependent behavior of lining and surrounding ground due to tunnel deterioration was proposed.

On the Improvement of the Design Verification Process for the Development of Railway Systems with Systems Safety Considered (철도시스템 개발에서 시스템 안전성을 고려한 설계검증 프로세스의 개선에 관한 연구)

  • Sim, Sang-Hyun;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.51-60
    • /
    • 2013
  • As the human demand or desire on brand new systems otherwise equipped with new functions grows drastically, so does the complexity of the systems. With this trend, the systems are becoming bigger in scale and at the same time the safety requirements are more stringent in the development. Typical systems examples in such a situation may include high-speed railway systems, aero and space systems, marine systems, etc. Failure of those systems can cause serious damages on both the human being and wealth with social infrastructure. As such, it is quite necessary to ensure that the safety requirements be satisfied in the system development. To achieve this need, there could be a lot of solutions to take. In this paper, regarding safety, a special attention is given to the verification phase process, which is one of the intermediate phases of whole systems development process. More specifically, the ultimate concern is placed on how to carry out the design verification while ensuring the safety requirements. To do so, some improvements in the verification phase were proposed first. Then, the outcomes were combined with the systems safety process by generating an integrated process model to reach the goal. As a case study, application to a railway system was discussed, where strict safety requirements are usually necessary. It would be expected that the potential likelihood of failure with rail systems could be reduced if the results obtained are used effectively with some enhancement from further study.