• Title/Summary/Keyword: High-speed Operation

Search Result 2,226, Processing Time 0.039 seconds

The Study for Speed-up of Main Line by High Speed Train (기존선의 고속전철 연계운용으로 고속화 방안)

  • 박광복
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.105-113
    • /
    • 2001
  • This report was studied about speed-up for main line of KNR(Korea National Railroad) by High Speed Train. The maximum speed of Kyun-Pu line was recorded a 140km/h by Saemaul train in 1985 and the average speed its is a 107km/h now. For operation KTX Kyun-Pu High Speed Train and G7 Korea High Speed Train in KNR line, this report was studied about operation status of High Speed Train in advanced countries, operation situation of train in KNR line and plan of speed-up for main line.

  • PDF

Study on the Establishment of Rail Grinding Criteria of High-Speed Railway Lines Considering the KTX Operation Circumstances (KTX 운행현황을 고려한 고속선 레일 연마 기준 정립에 대한 연구)

  • Kim, Man-Cheol;Kang, Tae-Ku
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.377-385
    • /
    • 2007
  • The importance of maintenance of rail surface defects is increasing more according to the KTX operation. That is because during high speed operation of rolling stock, rail surface defects may cause shortened fatigue life of rail, acceleration of track degradation and reduced ride comfort. The paper was intended to study the establishment of rail grinding criteria of high-speed railway lines considering the KTX operation circumstances. For this, the specimens of UIC 60 rail on Kyeong-Bu high-speed operation lines were collected and they were analyzed for metallographic structure and tested for the hardness. By analyzing the test results to the factors affecting the RCF causing the defects of rail surface, the study suggested the rail grinding criteria of the domestic high speed railway lines. As the factors affecting RCF, passing tonnage, running speed and track condition are considered.

  • PDF

CMOS binary image sensor with high-sensitivity metal-oxide semiconductor field-effect transistor-type photodetector for high-speed imaging

  • Jang, Juneyoung;Heo, Wonbin;Kong, Jaesung;Kim, Young-Mo;Shin, Jang-Kyoo
    • Journal of Sensor Science and Technology
    • /
    • v.30 no.5
    • /
    • pp.295-299
    • /
    • 2021
  • In this study, we present a complementary metal-oxide-semiconductor (CMOS) binary image sensor. It can shoot an object rotating at a high-speed by using a gate/body-tied (GBT) p-channel metal-oxide-semiconductor field-effect transistor (PMOSFET)-type photodetector. The GBT PMOSFET-type photodetector amplifies the photocurrent generated by light. Therefore, it is more sensitive than a standard N+/P-substrate photodetector. A binary operation is installed in a GBT PMOSFET-type photodetector with high-sensitivity characteristics, and the high-speed operation is verified by the output image. The binary operations circuit comprise a comparator and memory of 1- bit. Thus, the binary CMOS image sensor does not require an additional analog-to-digital converter. The binary CMOS image sensor is manufactured using a standard CMOS process, and its high- speed operation is verified experimentally.

PMSM Sensorless Operation for High Variable Speed Compressor (고속압축기 구동 PMSM을 위한 센서리스 운전)

  • 석줄기;이동춘;황준현
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.51 no.12
    • /
    • pp.676-681
    • /
    • 2002
  • This paper presents the implementation and experimental investigation of sensorless speed control for a variable-speed PMSM(Permanent Magnet Synchronous Motor) in super-high speed compressor operation. The proposed control scheme consists of two different sensorless algorithms to guarantee the reliable starting operation in low speed region and full torque characteristics using the vector control in high speed region. An automatic switching technique between two control modes is proposed to minimize the speed and torque pulsation during the switching instant of control mode. A testing system of 3.3㎾ PMSM has been built and 90% load test results at 7000r/min are presented to examine the feasibility of proposed sensorless control scheme.

2500 fps High-Speed Binary CMOS Image Sensor Using Gate/Body-Tied Type High-Sensitivity Photodetector (Gate/Body-Tied 구조의 고감도 광검출기를 이용한 2500 fps 고속 바이너리 CMOS 이미지센서)

  • Kim, Sang-Hwan;Kwen, Hyeunwoo;Jang, Juneyoung;Kim, Young-Mo;Shin, Jang-Kyoo
    • Journal of Sensor Science and Technology
    • /
    • v.30 no.1
    • /
    • pp.61-65
    • /
    • 2021
  • In this study, we propose a 2500 frame per second (fps) high-speed binary complementary metal oxide semiconductor (CMOS) image sensor using a gate/body-tied (GBT) p-channel metal oxide semiconductor field effect transistor-type high-speed photodetector. The GBT photodetector generates a photocurrent that is several hundred times larger than that of a conventional N+/P-substrate photodetector. By implementing an additional binary operation for the GBT photodetector with such high-sensitivity characteristics, a high-speed operation of approximately 2500 fps was confirmed through the output image. The circuit for binary operation was designed with a comparator and 1-bit memory. Therefore, the proposed binary CMOS image sensor does not require an additional analog-to-digital converter (ADC). The proposed 2500 fps high-speed operation binary CMOS image sensor was fabricated and measured using standard CMOS process.

A Study of Systematization for Train Control Technique (열차제어기술 체계화 방안에 대한 연구)

  • Lee, Jae-Ho;Shin, Duc-Ko;Lee, Kang-Mi
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.2010-2016
    • /
    • 2009
  • Before introducing high speed train, train signal system was operated passively depending on a driver by signal lamp display. Now it is changing to onboard signaling system because of train speed increased(conventional track is 230km/h, high speed track is 380km/h), high speed. low speed freight train operation mixed, operation for high speed train in conventional track and dense operation. ie. ETCS(European Train Control System) Level 1 is introducing. Also, in case of high speed train, the train control system of France was introduced and has operated from 2004, now we have a difficulty for rising speed more than 300km/h because of commercial operation speed limited as 300km/h. Therefore, it need to establish the train control technique according to trackside surroundings and develope standard system like European ERTMS/ETCS, China CTCS(Chinese Train Control System), Japan D-ATC(Digital Automatic Train Control). In this paper, we derive the systematization method for Korea train technique by network-oriented, information-oriented, intelligence-oriented and combination-oriented corresponding train development direction. Proposed method has a merit to prevent cross by mixed operation with existing system and improvement after validity demonstration and system development and supply train system to meet user requirement in exporting.

  • PDF

Operational Characteristics of the High-speed Interrupter for Reliability Enhancement of Power Supply and Demand (전력수급의 신뢰도 확보를 위한 고속 인터럽터 동작 특성)

  • Choi, Hye-Won;Choi, Hyo-Sang;Jung, Byung-Ik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.1
    • /
    • pp.143-148
    • /
    • 2013
  • When the fault occurs in power system, the fault-current exceeds breaking capacity of the circuit breaker. So, reliablity of the power system is decreased sharply. Superconducting fault-current limiter (SFCL) is operated without impedance in normal state. The fault-current is limited by its impedance during the fault condition. However, the SFCL has several weak points such as huge size, high-price, liquid-nitrogen operation for the real power system. In this paper, We suggested the high-speed interrupter to limit the fault-current in case of the single line-to-ground fault. In addition, we compared the high-speed interrupter with the SFCL to ensure the operation reliability. The proposed interrupter detected the fault-current through the CT, and the power was supplied by operation of the SCR control system. In this experiment, the power of high-speed interrupter was applied after the 4.8[msec] from fault instant. The on-off operation of the interrupter was started after half-cycle from the fault. The fault-current was flowed into the impedance element by the switching operation of the high-speed interrupter. So, the fault current was limited within one cycle, and then it didnt exceed the capacity of a circuit breaker. We confirmed that there was slight difference between the SFCL with high-speed interrupter in terms of limiting-time of the fault-current and switching speed of the SCR. The high-speed interrupter was considered to be more efficient than the SFCL in size, cost or reliability.

Loss Analysis of Three Phase Induction Motor Connected to Single Phase Source (단상전원에 접속된 3상 유도전동기의 손실분석)

  • Kim, Do-Jin;Jwa, Chong-Keun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.2
    • /
    • pp.121-126
    • /
    • 2008
  • This paper analyzes the losses of a Steinmetz connection three-phase induction motor which is supplied by a single-phase source. The T-type equivalent circuit which is taken no-load losses into account is used to determine phase converter capacitive reactances at starting and rated speed by using the condition of the minimum voltage unbalance. The starting and the operating capacitor are replaced at the slip of the same voltage unbalance factor points which are depicted using two capacitive reactances. The operation characteristics are investigated by comparing with those of three-phase balanced operation to find the feasibility of single-phase operation. To analyze the losses of this motor, the output power decrease factor(OPDF), the loss ratio(LR), the no load loss ratio(NLLR), the copper loss ratio(CLR), the stator copper loss ratio(SCLR), and the rotor copper loss ratio(RCLR) are defined and simulated in the whole slip range. The simulated results show that OPDF is maintained almost uniformly, LR is low at low speed and high at high speed, CLR is higher !ban NLLR, but CLR varies concavely and NLLR varies convexly at high speed, SCLR is low at low speed and high at high speed, but SCLR varies convexly at high speed, and RCLR is nearly opposite to SCLR.

A Study on the Characteristics of Transferring Vibration and Effect of Nearby-Building Induced by the High-speed Train in Operation (고속철도 운행에 의한 진동전달특성 및 인접건물에 미치는 영향에 관한 연구)

  • 배동명;신창혁;최철은;박상곤;백용진
    • Journal of KSNVE
    • /
    • v.11 no.2
    • /
    • pp.354-364
    • /
    • 2001
  • The vibration induced by high speed train running on rail is dealt with as an environmental problem. The train induced vibration is characterized by moving loads at specific frequencies and soil conditions. In fact, it is predicted that the vibration sources are involved the wheel distance, number of cars, speed of operation, drift of rails, structural born vibration, etc. In this paper the characteristics of transferring vibration induced by the high-speed train in operation is discussed. Field measurements was conducted at region from Chungnam Yungj So-jung-myan to Chungbuk Chungwon hyun-do-myun. In the near future. these data will be used as the fundamental data for establishment of the countermeasure for vibrational reduction of high speed train using the results of the field measurements and quantitative prediction of the vibration level

  • PDF

A Comparative Analysis on the Operating System of Urban Railway & Conventional·High speed Railway (도시철도와 일반·고속철도의 운영방식에 관한 비교 분석)

  • Choi, Jong-Gil;Yun, Hak-Sun
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.8
    • /
    • pp.953-958
    • /
    • 2015
  • Generally, Urban railway have special characteristics with short distance journey and minimum headway intercity transportation. These days, urban railway operators choose the driverless operation system without driver. On the contrary, Conventional & high speed railway utilize for long distance and high speed running. Because of special conditions of freight railway operation compared with urban railway, operation of conventional & high speed railway is showed very different characteristics. In this paper, We compares different operation scheme of urban railway and conventional & high speed railway and then present condition for train control system based on radio.