• Title/Summary/Keyword: High-rise Building Construction

Search Result 711, Processing Time 0.028 seconds

The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction (초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구)

  • Cha, Minsoo;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings (초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구)

  • Kim, Sang Hwan;Choy, Won Cheol;Kim, Ju Hyung;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

Development of An Optimal Call-response Algorithm of Construction Lift for High-rise Building Construction (초고층 건설용 리프트의 최적 호출 응답 알고리즘 개발)

  • Ahn, Heejae;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.6-7
    • /
    • 2018
  • Although the importance of the construction lift is increasing, no improvements are being made to its operating system. This study proposed an optimal call-response algorithm of the construction lift for high-rise building construction by using image sensing technology, height measuring sensor, and load cell. This algorithm makes turn-around decision of the construction lift by considering the information and the number of user. It occurs when the call comes from a floor where the construction lift already have passed. The purpose of this study is to reduce the total latency of the construction lift user. Furthermore, it is possible to prevent delay in construction duration by carrying out a priority operation of the construction lift for the critical workforce.

  • PDF

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

The Study of Load Test Method for In-Site Casting Pile In High Rise Building. (초고층에서의 현장타설말뚝 재하시험방법 고찰)

  • Kim, Dae-Hak;Hong, Young-Kil;Han, Sung-Moo;Gu, Ung-Hwoe;Park, Chan-Duck
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.385-392
    • /
    • 2008
  • Modern city have had a lot of high-rise building in high standards and multi-level performance. Using of city space reach better stages by using integration. These skyscraper have increased working load on ground. that building is efficiently designed for that soil capacity is well applied. With material side, big size pile, high strength concrete and high strength steel is used for that getting enough lobby space and resisting load increased of high-rise building. limit load test and load transmitted test can make soil capacity optimized. By the way, method of measuring pile capacity is more advanced and bigger. pile type applied by high rise building have underground excavation space, also reflect regional soil property and have some fact reviewed. A lot of high rise building recently is built as land mark in Seoul, Busan and Incheon. about method of measuring capacity of foundation pile, example of construction field is compared and reviewed.

  • PDF

A Study on the Work-Planning Method of High-rise Building (초고층 건물의 구조체 공사의 작업계획방법에 관한연구)

  • Kim Dae-Gil;Hwang Jae-Hoo;Jung Ho-Geun;Kim Ju-Hwan;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.129-132
    • /
    • 2006
  • Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

  • PDF

Automation Technology Application for Efficient Project Management of Steel Framing High-rise Building Construction (고층 철골공사의 사업관리 효율화를 위한 자동화 기술 적용 방안 연구)

  • Kim, Chane-Seop;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.3-4
    • /
    • 2010
  • With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.

  • PDF

A Preliminary Study to Apply Group Control System to Lifts for High-rise Construction (초고층 공사 리프트의 그룹제어 시스템 적용을 위한 기초 연구)

  • Kim, Taehoon;Lim, Hyunsu;Kim, Chang-Won;Kim, Seung Woo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.260-261
    • /
    • 2017
  • The objective of this study is to propose the basic design plan of system by comparing and analyzing application environment of lift and elevator group control system, as preliminary study for the application of group control system to lifts for high-rise construction. The basic design plan is suggested in terms of group control algorithm, hall call system type, operation information recording device, information communication method, and operation method. The results of this study can be used as basic data for software and hardware design for application of group control technology of lifts for super tall building construction and ultimately contribute to improve the operation efficiency of lift for high-rise construction.

  • PDF

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

Development and Application of Unit Table Form using Euro Form for High-rise Building Construction (초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구)

  • Yang, Sung-Woo;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.