• Title/Summary/Keyword: High-rise Building

Search Result 1,780, Processing Time 0.028 seconds

A Study on Unbalanced Moment of Flat Plate Exterior Connections (플랫 플레이트 외부접합부의 불균형모멘트에 관한연구)

  • Choi, Hyun-Ki;Beck, Seong-Woo;Back, Young-Soo;Jin, Eon-Sik;Choi, Chang-Sik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.1-4
    • /
    • 2008
  • Flat plate slab has been widely used in high rise building for its remarkable advantages. However, Flat plate structures under lateral load are susceptible to punching shear of the slab-column connection. Exterior slab-column connections has an unsymmetrical critical section for eccentric shear of which perimeter is less than that of interior connection, and hence, around the connection, unbalanced moment and eccentric shear are developed by both gravity load and lateral loads. Therefore, exterior connections is susceptible to punching shear failure. For that reason, this study compare ACI 318-05 to CEB-FIP MC 90 that is based on experiment results and existing data of flat plate exterior connections. This study shows that compared to CEB-FIP MC 90 is more exact about eccentric shear stress, unbalanced moment and Both of all are not suitable in large column aspect ratio. Considering gravity shear ratio, These are suitable but design condition only consider gravity shear ratio. So these should be considered differences from change of design condition

  • PDF

Field Instrumentation of Load of R/C Apartment under Construction according to Construction Stage (시공단계에 따른 RC공동주택의 동바리 하중 계측)

  • Oh, Jae-Keun;Kang, Su-Min;Kim, Ook-Jong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.117-120
    • /
    • 2008
  • Recently, according to the increasement of high-rise building construction and domestic situation, requirements of rapid cycle construction are increasing. For more economical and rapid cycle construction, it is required to reduce formwork cost. So formwork have to be stripped as soon as possible. But as fresh concrete is loaded with construction load, it is likely that the structure will have problems with safety and serviceability. To reduce construction cycle economically, safety and serviceability of structure against construction load have to be considered. But as behavior of structure under construction is so complicated, behavior of structure has to be investigated according to construction stage. Therefore, through field instrumentation of apartment, behavior of structure under construction was analyzed.

  • PDF

Four-legged robot for glass building cleaning (유리빌딩 청소를 위한 4족 보행로봇)

  • Kim, Cheong-Sol;Kim, Dong-sung;Choi, Cheong-hwan;Park, Ji-min;Jin, Tae-seok
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.452-455
    • /
    • 2017
  • As the number of high - rise buildings has increased recently, this research society has become interested in the method of cleaning the external wall required. When cleaning these areas, an accident occurs every year when a person uses dangerous manual labor using a gondola. The main goal of this work is to enable people to manipulate the robot with simple operation without dangerous manual operation when working in a vertical structure. As the altitude increases, the concept of the mechanism attaching to the vertical structure while enduring the external resistance in the increase of the wind strength is applied, and the additional attachment device is attached to the end of the leg based on the existing four- According to the control, the development result of the robot having the function of detachable to the glass is presented.

  • PDF

A computation model for Resource-based Lifting loads of the lift-cars for super high-rise buildings (초고층 건축물 리프트카 양중계획수립을 위한 자원기반의 양중부하 산정 모형)

  • Han, Choong-Hee;Lee, Jun-Bok;Won, Seo-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.135-143
    • /
    • 2012
  • Constructing super-tall buildings is significantly different from constructing general ones in every technological and managerial aspects. Especially lift-car operations planning and management is one of core parts among various management techniques required during the course of the whole construction process of the super-tall buildings because vertical movements of physical resources enormously affect the efficiency of the construction processes. However, discrepancy between lifting plans and actual lifting operations causes serious efficiency problems. As an effort to solve the problem, this research suggests an improved method of estimating resource-based lifting load. The computing model developed as a result of this research facilitates more accurate computation of the total operation time and the maximum lifting capacity of the lift-cars. Further, this research can be developed as a decision support system for the total lift-car operations management.

Fundamental Period Formulas for Concrete Shear Wall Buildings (철근 콘크리트 전단벽 구조물의 고유주기)

  • Kang, Sung-Hun;Hong, Sung-Gul;Park, Hong-Gun;Chung, Lan
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.1
    • /
    • pp.29-38
    • /
    • 2011
  • A new formula is proposed for the fundamental period of high-rise residential concrete shear-wall (SW) buildings. This formula, developed on the basis of dynamics with the recorded fundamental period during the recent earthquakes, can consider the wall stiffness with respect to any direction. To verify the proposed formula, the fundamental period of 10 sample buildings, measured during construction, is compared with the predicted fundamental period. Furthermore, the empirical formulas presented in the building codes KBC 2009 and ASCE 7-10, are also compared with the proposed formula to show a rationality of the proposed formula. The comparison results show that the proposed formula not only can rationally consider the characteristics of each shear-wall, but that it also accurately predicts the fundamental period of the buildings.

A Study on the Mechanical Properties of Concrete Filled Steel Tube Column under Centric Axial Load (중심축력을 받는 콘크리트 충전강관 기둥의 역학적 거동 특성에 관한 연구)

  • 박정민;김화중
    • Magazine of the Korea Concrete Institute
    • /
    • v.7 no.5
    • /
    • pp.133-144
    • /
    • 1995
  • This study investigated to the properties of structural behaviors through a series of experiment with the key parameter, such as diameter-to-thickness(D/t) ratio, selenderness ratio of steel t~ube and strength of concrete under loading condition simple confined concrete by steel tube as a fundmental study on adaptability with structural members in high-rise building. The obtained results are sumnarised as follow. (1) The fracture mode of confined concrete was presented digonal tension fracture in the direction of $45^{\circ}$ with compression failure at the end of specimen in stub column, but the fracture mode of long column was assumed an aspect of bending fracture transversely. (2) The deformation capacity and ductility effect was increased by confine steel tube for concrete. (3) 'The emprical formula to predict the ultimate capacity of confined concrete by steel tube and concrete filled steel tube column using restraint of concrete considered D / t ratio, selenderness ratio of steel tube anti strength of' concrete were proposed.

Optimization of Multiple Tower Cranes and Material Stockyards Layout (다중 양중장비와 자재 야적 위치의 최적 결정을 위한 모델 개발)

  • Kim, Kyong-Ju;Kim, Kyoung-Min;Lee, Sang-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.127-134
    • /
    • 2009
  • This study aims to provide an optimal model for the layout of multiple tower cranes and material stockyards which have multiple candidate positions. In a high-rise building construction, the positional allocation of tower cranes and material stockyard has an effect on the travel time of material hauling. In addition, in case of using multiple tower cranes, specific location of a tower crane allocated to each material determines the efficiency of the works. Current optimal model limited to the optimization of position of single tower crane and material stockyards. This study suggests optimal model both for the positions of multiple tower cranes and material stockyards. Layout of multiple tower cranes requires additional allocation of each crane to each material hauling and control on the minimum distance between tower cranes. This optimization model utilizes genetic algorithm to deal with complex interaction on the candidate positions of multiple tower cranes, material stockyards, and types of materials. In order to identify its utility, case study was performed.

A Study on the improvement of current construction safety management system (건설공사 안전관리 개선방안에 관한 연구)

  • Jung, Jae-Woo;Kim, Tae-Yang;Kim, Hang-Su;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.691-694
    • /
    • 2007
  • Today, current society is unceasingly changing. This phenomenon accelerate building to high-rise and complex. According to that, to build a construction structure, the safety management facilities, safety education & training for employee and consciousness for safety should be set aside. But, the occurrence of safety injury is not decreasing now. Therefore, to reduce safety injury and to enhance the consciousness of employee for safety, redesign of safety management system, reallocation of safety liability for privity, revise of safety educational system were suggested in this paper.

  • PDF

Seismic performance of R/C structures under vertical ground motion

  • Bas, Selcuk;Lee, Jong-Han;Sevinc, Mukadder;Kalkan, Ilker
    • Computers and Concrete
    • /
    • v.20 no.4
    • /
    • pp.369-380
    • /
    • 2017
  • The effects of the vertical component of a ground motion on the earthquake performances of semi-ductile high-rise R/C structures were investigated in the present study. Linear and non-linear time-history analyses were conducted on an existing in-service R/C building for the loading scenarios including and excluding the vertical component of the ground motion. The ratio of the vertical peak acceleration to the horizontal peak acceleration (V/H) of the ground motion was adopted as the main parameter of the study. Three different near-source earthquake records with varying V/H ratio were used in the analyses. The linear time-history analyses indicated that the incorporation of the vertical component of a ground motion into analyses greatly influences the vertical deflections of a structure and the overturning moments at its base. The lateral deflections, the angles of rotation and the base shear forces were influenced to a lesser extent. Considering the key indicators of vertical deflection and overturning moments determined from the linear time-history analysis, the non-linear analyses revealed that the changes in the forces and deformations of the structure with the inclusion of the vertical ground motion are resisted by the shear-walls. The performances and damage states of the beams were not affected by the vertical ground motion. The vertical ground motion component of earthquakes is markedly concluded to be considered for design and damage estimation of the vertical load-bearing elements of the shear-walls and columns.

Design Strength of Coupled Shear Wall System according to Variation of Strength and Stiffness of Coupled Shear Wall (병렬전단벽의 강도와 강성이 커플링보의 설계내력에 미치는 영향)

  • Yoon, Tae-Ho;Kim, Jin-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.743-750
    • /
    • 2016
  • In this research, the effects of the strength and stiffness of shear walls on the design strength of coupling beams are studied in the shear wall-coupling beam structural system widely used as the lateral-drift resistant system of high-rise buildings. The results show that the design strength of the coupling beams decreases with decreasing concrete strength and core wall thickness, but the shape remains unchanged. In all six models, the design strength of the coupling beams has the largest value at the 10~15th floors in a 40-story building. In other words, the design strength of the coupling beams has the largest value at 0.25H~0.375H where the inflection point exists. The thicker the walls, the smaller the change in the member forces. The thickness of the coupled shear walls has more influence on the design strength of the coupling beams than the concrete strength.