• Title/Summary/Keyword: High Speed Rail

Search Result 817, Processing Time 0.043 seconds

Rail Inspection Using Noncontact Laser Ultrasonics

  • Kim, Nak-Hyeon;Sohn, Hoon;Han, Soon-Woo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.32 no.6
    • /
    • pp.696-702
    • /
    • 2012
  • In this study, a noncontact laser ultrasonic system is proposed for rail defect detection. An Nd-Yag pulse laser is used for generation of ultrasonic waves, and the corresponding ultrasonic responses are measured by a laser Doppler vibrometer. For the detection of rail surface damages, the shape of the excitation laser beam is transformed into a line. On the other hand, a point source laser beam is used for the inspection of defects inside a rail head. Then, the interactions of propagating ultrasonic waves with defects are examined using actual rail specimens. Amplitude attenuation was mainly observed for a surface crack, and reflections were most noticeable from an internal damage. Finally, opportunities and challenges associated with real-time rail inspection from a high-speed train are discussed.

Evaluation of Rail Fatigue Life by Grinding of Kyeong-Bu High-Speed Line (경부고속선의 레일 연마에 따른 레일 피로수명 평가)

  • Kim, Man-Cheol;Choi, Eun-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.6
    • /
    • pp.577-582
    • /
    • 2010
  • The importance of maintenance of rail surface defects is increasing according to the KTX operation. That is because during high speed operation of rolling stocks, rail surface defects shorten fatigue life of rail, accelerate track degradation and deteriorate ride comfort. Rail grinding has been applied for effective rail maintenance in Kyeong-Bu HS line. This paper evaluates the effectiveness of rail grinding in term of rail fatigue life. To this end, the stresses of the rail are measured under KTX running and the equivalent stress range is calculated by RMC after the frequency analysis done with rainflow counting method. Also, The Modified Miner's rule is applied to predict the fatigue life of ground rail. The result of the analysis shows that the fatigue life of ground rail is increased by 15%.

A Study on the Optimized Cross-section of Embedded Rail System (레일 매립형 궤도시스템(ERS, Embedded Rail System)의 최적단면에 관한 연구)

  • Hwang, Man-Ho;Yun, Kyung-Min;Kim, Soon-Cheol;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.2511-2518
    • /
    • 2014
  • An ERS(Embedded Rail System) has large effect on the load distribution because of its continuous rail support. Therefore, stress level of the track components is lower than that of other system. Though the ERS has various advantages, the application example in a domestic railway is rarely applied and the studies for the application of high-speed service lines are insufficient. In this paper, the vertical stiffness is derived from laboratory test and the optimized cross-section is also derived from the analytical analysis as a basic study for application of ERS on the high-speed service lines.

Active Control of a High-Speed Pantograph using LQ-Servo Controller

  • Shin, Seung-Kwon;Song, Young-Soo;Eum, Ki-Young;Koo, Dong-Hoe
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.1173-1177
    • /
    • 2004
  • The high investment is necessary for the new high speed lines. So the KRRI was interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The tilting train system has been developed because the reconstruction of railway for the cant compensation costs very high. The purpose of the tilting system is to compensate the centrifugal acceleration in order to reduce the lateral acceleration of the passenger at high speed on the curves.The pantograph of the tilting train is indispensable in order to supply the electrification equipments with power in safe. The dynamic interaction between the pantograph and the overhead catenary system causes the variation of the contact force and the contact force variation can cause contact losses, arcing and sparking. If the spark happens between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper deals with the active control of pantograph and presents the LQ-servo controller to reduce the contact force variation.

  • PDF

A Study on Maximum Speed Test for On-board Signalling Equipment in HEMU-400x (차세대고속열차 차상신호장치 최고속도 시험방안에 관한 연구)

  • Shin, Duc-Ko;Lee, Jae-Ho;Lee, Kang-Mi;Kim, Yong-Kyu;Park, Choon-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.670-677
    • /
    • 2009
  • This paper is a study of testing on-board signalling equipment in advanced high speed rail at the maximum speed of 400km/h. The on-board signalling equipment in advanced high speed rail provides operating information to the driver when operating at ATC, ATS, and ATP sections, and maintains safety from driver oversight, signalling equipment malfunction, natural disasters and so on. Since the testing train performance of advanced high speed rail at 400km/h must include the function test of on-board signalling equipment, this thesis focuses on the function test of on-board signalling equipment and analyze the necessity of the test at the maximum speed. Finally, it is suggested to change some infrastructure and to use specific test methods to test the train performance at the maximum speed in high speed line ATC section.

A Study on the Performance Elevation Methods of Next Generation Railway Freight Vehicles (한국형 고속열차를 이용한 고속선-기존선 연결구간의 속도향상 가능성에 관한 연구)

  • Ham Y.S.;Hong J.S.;Oh T.Y.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.10a
    • /
    • pp.12-15
    • /
    • 2005
  • In April 1, 2004, age of high-speed railway was opened to korea railroad. The railroad is a means of large transportation which has many talents such as a safety and a regularity. That is a results from various confidential performance tests and evaluations of the system. The railroad system consist of various subsystems - vehicle, power supply, signal, communications, track structures, operations, etc. Among them, as an item of safety evaluation there is a measurement of wheel/rail farce, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more important in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, examined speed elevation possibility use the korean style high speed railway vehicle for reduce the running time of high-speed railway between high speed line and conventional line.

  • PDF

Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail (철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로)

  • Suh, Sunduck;Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1261-1267
    • /
    • 2014
  • It is generally recognize that the weight of energy cost for railroad alignment in the life cycle cost is higher than that for roadway. This study analyzed the relative weights of railroad road-bed construction cost and energy cost in the case of Seoul-Pusan High Speed Rail. Recently, the optimization of railroad alignment with computerized methodology has been studies. The optimization is supposed to aim the minimization of life cycle cost including the energy cost as well as the minimization of the construction cost. The operation period of the Seoul-Pusan High Speed Rail is limited to ten years, then various future operation scenario were developed for the next 20 years. The weight of energy cost is estimated 10~30% of the construction cost by scenario, and it is lower than the figure generally expected. It may be meaningful to provide the method to include the energy cost in the railroad alignment optimization.

A Study on Durability Standard Specification of the Dropper Clamp of Catenary for High Speed Railway (고속철도 전차선로 드로퍼 클램프 내구성 기준 정립에 관한 연구)

  • Oh, Wan-Shik;Yang, In-Dong;Park, Byung-Gon;Hong, Seok-Jin;Kim, Seong-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.9
    • /
    • pp.1431-1436
    • /
    • 2017
  • The high-speed railway of catenary system, supplies a stable electric power supply to the train by satisfying the special conditions between pantograph and trolley wire, which operates more than 250km/h mutually sliding and feeding electric lines. According to Korean Railway Standard KRS PW 0026-13 (R), the standard for the grip strength of the dropper clamp in conventional line is established, but the high-speed railway line is not yet. When the grip strength of the dropper clamp is detached from the catenary line of the high-speed railway line, various problems may occur, such as damage to the pantograph due to the collision and arcing. In this paper, it is expected to be used as a basic data for establishing the durability criteria of the high-speed railway dropper clamp by verifying the dropper clamp on the Gyeong-bu and Honam high-speed line.

A Study on Fluctuating Pressure Load on High Speed Train Passing through Tunnels

  • Seo Sung-Il;Park Choon-Soo;Min Oak-Key
    • Journal of Mechanical Science and Technology
    • /
    • v.20 no.4
    • /
    • pp.482-493
    • /
    • 2006
  • The carbody structure of a high speed train passing through a tunnel is subjected to pressure fluctuation. Fatigue strength of the carbody structure against the fluctuating pressure loading should be proved in the design stage for safety. In this study, to get the useful information on the pressure fluctuation in the tunnel, measurement has been conducted during test running of KHST on the high speed line for two years. The measured results were analyzed and arranged to be used for carbody design. A prediction method for the magnitude and frequency of pressure change was proposed and the propagating characteristics of pressure wave was investigated. By statistical analysis for the measured results, a pressure loading spectrum for the high speed train was given. The proposed method can also be used to estimate the pressure loading spectrum for new high speed line at design stage combined with the results of train performance simulation.

A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project (철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구)

  • Lee Young-Joo;Jang Seong- Yong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF