A Study on the Performance Elevation Methods of Next Generation Railway Freight Vehicles

한국형 고속열차를 이용한 고속선-기존선 연결구간의 속도향상 가능성에 관한 연구

  • Published : 2005.10.01

Abstract

In April 1, 2004, age of high-speed railway was opened to korea railroad. The railroad is a means of large transportation which has many talents such as a safety and a regularity. That is a results from various confidential performance tests and evaluations of the system. The railroad system consist of various subsystems - vehicle, power supply, signal, communications, track structures, operations, etc. Among them, as an item of safety evaluation there is a measurement of wheel/rail farce, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more important in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, examined speed elevation possibility use the korean style high speed railway vehicle for reduce the running time of high-speed railway between high speed line and conventional line.

Keywords