Browse > Article

A Study on Maximum Speed Test for On-board Signalling Equipment in HEMU-400x  

Shin, Duc-Ko (한국철도기술연구원, 열차제어통신연구실)
Lee, Jae-Ho (한국철도기술연구원, 열차제어통신연구실)
Lee, Kang-Mi (한국철도기술연구원, 열차제어통신연구실)
Kim, Yong-Kyu (한국철도기술연구원, 열차제어통신연구실)
Park, Choon-Soo (한국철도기술연구원, 열차제어통신연구실)
Publication Information
Journal of the Korean Society for Railway / v.12, no.5, 2009 , pp. 670-677 More about this Journal
Abstract
This paper is a study of testing on-board signalling equipment in advanced high speed rail at the maximum speed of 400km/h. The on-board signalling equipment in advanced high speed rail provides operating information to the driver when operating at ATC, ATS, and ATP sections, and maintains safety from driver oversight, signalling equipment malfunction, natural disasters and so on. Since the testing train performance of advanced high speed rail at 400km/h must include the function test of on-board signalling equipment, this thesis focuses on the function test of on-board signalling equipment and analyze the necessity of the test at the maximum speed. Finally, it is suggested to change some infrastructure and to use specific test methods to test the train performance at the maximum speed in high speed line ATC section.
Keywords
Advanced High Speed Rail; Train Control System; Maximum Speed Test;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Alcatel, Alstom, Ansaldo signal, Bombardier, Invernsys rail, siemens(2003), "ERTMS/ETCS-Class1 Specific Transmission Module FFFIS," pp. 22-177
2 TGV French Group(1992), "Seoul-Pusan High Speed Rail System 3.5.6-o System Design," Technical Provisons, pp.1-58
3 Lee Jae-Ho, Shin ducko, Le Kang-Mi(2008), "Review on signaling system for new high speed train test at existing high speed line," ICEE 2008 Okinawa International Conference, pp. 1-5
4 ERA(2007), "ERTMS/ETCS Functional Requirements Specification (FRS)," pp. 9
5 Cordel(2007), "A Review Report for Maintenance in the High-Speed Railway Signaling System : UM71/TVM430," pp.1-55
6 UIC(2002), "ERTMS/ETCS-Class 1 System Requirements Specification Chapter 1 to 8."
7 LG산전(1997), "자동열차제어장치 기술개발에 관한 연구(1차년도 연차보고서)," 제2절, 시스템의 주요기능
8 한국철도기술연구원(2006), "차세대 고속철도 기술개발사업 기회보고서," pp. 21-35
9 한국철도기술연구원(1998), "ATP시스템 도입을 위한 기술조사(최종보고서)," pp.15-32
10 TGV French Group(1992), "Seoul-Pusan High Speed Rail System 3.5.6-c ATC System," Technical Provisions, pp. 1-65