A Study on Maximum Speed Test for On-board Signalling Equipment in HEMU-400x |
Shin, Duc-Ko
(한국철도기술연구원, 열차제어통신연구실)
Lee, Jae-Ho (한국철도기술연구원, 열차제어통신연구실) Lee, Kang-Mi (한국철도기술연구원, 열차제어통신연구실) Kim, Yong-Kyu (한국철도기술연구원, 열차제어통신연구실) Park, Choon-Soo (한국철도기술연구원, 열차제어통신연구실) |
1 | Alcatel, Alstom, Ansaldo signal, Bombardier, Invernsys rail, siemens(2003), "ERTMS/ETCS-Class1 Specific Transmission Module FFFIS," pp. 22-177 |
2 | TGV French Group(1992), "Seoul-Pusan High Speed Rail System 3.5.6-o System Design," Technical Provisons, pp.1-58 |
3 | Lee Jae-Ho, Shin ducko, Le Kang-Mi(2008), "Review on signaling system for new high speed train test at existing high speed line," ICEE 2008 Okinawa International Conference, pp. 1-5 |
4 | ERA(2007), "ERTMS/ETCS Functional Requirements Specification (FRS)," pp. 9 |
5 | Cordel(2007), "A Review Report for Maintenance in the High-Speed Railway Signaling System : UM71/TVM430," pp.1-55 |
6 | UIC(2002), "ERTMS/ETCS-Class 1 System Requirements Specification Chapter 1 to 8." |
7 | LG산전(1997), "자동열차제어장치 기술개발에 관한 연구(1차년도 연차보고서)," 제2절, 시스템의 주요기능 |
8 | 한국철도기술연구원(2006), "차세대 고속철도 기술개발사업 기회보고서," pp. 21-35 |
9 | 한국철도기술연구원(1998), "ATP시스템 도입을 위한 기술조사(최종보고서)," pp.15-32 |
10 | TGV French Group(1992), "Seoul-Pusan High Speed Rail System 3.5.6-c ATC System," Technical Provisions, pp. 1-65 |