1 |
D.Y. Sung, D.C. Go, Y.S. Kang, Y.G. Park (2009) The Parametric Study Effecting on the Fatigue Life of Rail on High Speed Railway, Journal of the Korean Society for Railway, 12(3), pp. 394-404
과학기술학회마을
|
2 |
Y.G. Park, D.Y. Sung, H.K. Park, S.Y. Kong (2008) Bending Fatigue Life Assessment of Aged CWR Using the Field Test, Journal of the Korean Society for Railway, 11(3), pp. 317-325.
과학기술학회마을
|
3 |
S.J. Maddox (1991) Fatigue Strength of Welded Structures, Abington Publishing.
|
4 |
Makoto Ishida, Noritsugi Abe (1990) Relationship between Rail Surface Irregularity and Bending Fatigue of Welded Part in Long Rails, RTRI Report, 4(7), pp. 8-15.
|
5 |
M.C. Kim (2006) Study on Establishing Rail Grinding Period, KRRI Report, pp. 59-79.
|
6 |
CEN (2003) EN13231-3 Part3 : Acceptance of rail grinding, milling and planning work in track.
|
7 |
Coenraad Esveld (2001) Modern Railway Track, MRT-Productions, pp. 84-90.
|
8 |
M.C. Kim, J.S. Kim, S.C. Han (2001) Prediction of Bending Fatigue Life to Welding Parts of Rail on Slab Track, Journal of the Korean Society for Railway, 4(4), pp. 138-146.
|
9 |
S.C. Yang, M.C. Kim, J.S. Kim (2000) Prediction of Bending Fatigue Lifes of Rail Welded Parts, Journal of the Korean Society of Civil Engineers, 20(1-D), pp. 97-105.
|