• 제목/요약/키워드: Hierarchical Construction

검색결과 211건 처리시간 0.027초

MODELLING OF THE RISKS FACED BY INDIAN CONSTRUCTION COMPANIES ASSESSING INTERNATIONAL OPPORTUNITIES

  • M.N. Devaya;N.K. Jha
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.140-149
    • /
    • 2007
  • Indian construction companies have only 0.05% market share in the 3-4 trillion dollar global construction business and only two Indian construction companies figure in the ENR "Top 225 Global Contractors 2006" list. Hence, while enormous scope for growth exists, international construction experience is limited. This study explores the risks as perceived by Indian companies venturing abroad since risks in international construction differ from home market risks. Literature survey identified a number of risk factors that were evaluated by the experts, highlighting fourteen important risk factors. Interpretive Structural Modelling (ISM) was used to develop a hierarchical model showing the relationships between the different risk factors, thus helping to focus on the key risks for effective risk management. The study shows that poor project management is a key risk forming the hub of the system, while political instability has maximum influence. The results of the study can be used by managers to visualise the risks in perspective and prioritise the mitigation effort.

  • PDF

글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구 (A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment)

  • 양명덕;김창권;양재웅
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

공정리스크의 정량적 도출을 위한 기초적 방법 (Quantitively deducing basic method of construction schedule risk)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

신문기사정보 패싯 택소노미 구축 방안 - 예술 분야를중심으로 - (Plan of Constructing Facet Taxanomies of Information on News Articles - Focused on the area of Arts -)

  • 장인호
    • 한국도서관정보학회지
    • /
    • 제50권4호
    • /
    • pp.381-403
    • /
    • 2019
  • 신문기사를 주제 분야별로 나누고, 분야 내에서 각각의 범주들은 기본 패싯과 결합하는 패싯 택소노미 모형을 개발하였으며 구축 방안을 제시하고 패싯 택소노미를 구축하는 연구를 수행하였다. 패싯 택소노미는 신문기사를 주제 분야(정치, 경제 분야 등)로 나누고 범주(정치 분야의 경우, 정치일반, 행정, 사법 등) 및 하위 범주를 기본 패싯과 각각 결합한다. 하위 범주는 더욱 하위 구분할 수 있다. 택소노미는 범주 간의 계층 관계를 가질 수 있으며, 범주-패싯은 예를 들어, "예술"에 대해 '사람', '행위', '행사', '시간', '장소' 등과 결합한다. 그리고 예술의 하위 범주인 '미술', '음악', '무용' 등은 '예술'과 계층 관계를 이루어 추론과 브라우징에 활용할 수 있도록 구성하였다. 또한, 범주-패싯 결합은 기본 패싯순으로 계층 구조를 갖는다. 한편, 시험용 어휘 구축은 '예술 분야'를 대상으로 용어 145어를 본 연구에서 다루는 모든 구성요소를 포함하는 패싯 택소노미를 구축하고, 디스플레이를 예시하였다.

New Techniques for Anonymous HIBE with Short Ciphertexts in Prime Order Groups

  • Lee, Kwang-Su;Lee, Dong-Hoon
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제4권5호
    • /
    • pp.968-988
    • /
    • 2010
  • Anonymous hierarchical identity based encryption (HIBE) is an extension of identity based encryption (IBE) that can use an arbitrary string like an e-mail address for a public key, and it additionally provide the anonymity of identity in ciphertexts. Using the anonymous HIBE schemes, it is possible to construct anonymous communication systems and public key encryption with keyword search. This paper presents an anonymous HIBE scheme with constant size ciphertexts under prime order symmetric bilinear groups, and shows that it is secure under the selective security model. Previous anonymous HIBE schemes were constructed to have linear size ciphertexts, to use composite order bilinear groups, or to use asymmetric bilinear groups that is a special type of bilinear groups. Our construction is the first efficient anonymous HIBE scheme that has constant size ciphertexts and that uses prime order symmetric bilinear groups. Compared to the previous scheme of composite order bilinear groups, ours is ten times faster. To achieve our construction, we first devise a novel cancelable random blinding technique. The random blinding property of our technique provides the anonymity of our construction, and the cancellation property of our technique enables decryption.

The Construction of Regulatory Network for Insulin-Mediated Genes by Integrating Methods Based on Transcription Factor Binding Motifs and Gene Expression Variations

  • Jung, Hyeim;Han, Seonggyun;Kim, Sangsoo
    • Genomics & Informatics
    • /
    • 제13권3호
    • /
    • pp.76-80
    • /
    • 2015
  • Type 2 diabetes mellitus is a complex metabolic disorder associated with multiple genetic, developmental and environmental factors. The recent advances in gene expression microarray technologies as well as network-based analysis methodologies provide groundbreaking opportunities to study type 2 diabetes mellitus. In the present study, we used previously published gene expression microarray datasets of human skeletal muscle samples collected from 20 insulin sensitive individuals before and after insulin treatment in order to construct insulin-mediated regulatory network. Based on a motif discovery method implemented by iRegulon, a Cytoscape app, we identified 25 candidate regulons, motifs of which were enriched among the promoters of 478 up-regulated genes and 82 down-regulated genes. We then looked for a hierarchical network of the candidate regulators, in such a way that the conditional combination of their expression changes may explain those of their target genes. Using Genomica, a software tool for regulatory network construction, we obtained a hierarchical network of eight regulons that were used to map insulin downstream signaling network. Taken together, the results illustrate the benefits of combining completely different methods such as motif-based regulatory factor discovery and expression level-based construction of regulatory network of their target genes in understanding insulin induced biological processes and signaling pathways.

계층적 유전자 조절 네트워크와 대사 네트워크를 통합한 가상 미생물 시스템의 모델링 (Modeling of in Silico Microbe System based on the Combination of a Hierarchical Regulatory Network with Metabolic Network)

  • 이성근;한상일;김경훈;김영한;황규석
    • 제어로봇시스템학회논문지
    • /
    • 제11권10호
    • /
    • pp.843-850
    • /
    • 2005
  • FBA(flux balance analysis) with Boolean rules for representing regulatory events has correctly predicted cellular behaviors, such as optimal flux distribution, maximal growth rate, metabolic by-product, and substrate concentration changes, with various environmental conditions. However, until now, since FBA has not taken into account a hierarchical regulatory network, it has limited the representation of the whole transcriptional regulation mechanism and interactions between specific regulatory proteins and genes. In this paper, in order to solve these problems, we describe the construction of hierarchical regulatory network with defined symbols and the introduction of a weight for representing interactions between symbols. Finally, the whole cellular behaviors with time were simulated through the linkage of a hierarchical regulatory network module and dynamic simulation module including FBA. The central metabolic network of E. coli was chosen as the basic model to identify our suggested modeling method.

Construction of a Remote Monitoring System in Smart Dust Environment

  • Park, Joonsuu;Park, KeeHyun
    • Journal of Information Processing Systems
    • /
    • 제16권3호
    • /
    • pp.733-741
    • /
    • 2020
  • A smart dust monitoring system is useful for obtaining information on rough terrain that is difficult for humans to access. One of ways to deploy sensors to gather information in smart dust environment is to use an aircraft in the Amazon rainforest to scatter an enormous amount of small and cheap sensors (or smart dust devices), or to use an unmanned spacecraft to throw the sensors on the moon's surface. However, scattering an enormous amount of smart dust devices creates the difficulty of managing such devices as they can be scattered into inaccessible areas, and also causes problems such as bottlenecks, device failure, and high/low density of devices. Of the various problems that may occur in the smart dust environment, this paper is focused on solving the bottleneck problem. To address this, we propose and construct a three-layered hierarchical smart dust monitoring system that includes relay dust devices (RDDs). An RDD is a smart dust device with relatively higher computing/communicating power than a normal smart dust device. RDDs play a crucial role in reducing traffic load for the system. To validate the proposed system, we use climate data obtained from authorized portals to compare the system with other systems (i.e., non-hierarchical system and simple hierarchical system). Through this comparison, we determined that the transmission processing time is reduced by 49%-50% compared to other systems, and the maximum number of connectable devices can be increased by 16-32 times without compromising the system's operations.

계층적 오버레이를 이용한 DDoS 공격 감내 네트워크 (DDoS Attack Tolerant Network using Hierarchical Overlay)

  • 김미희;채기준
    • 정보처리학회논문지C
    • /
    • 제14C권1호
    • /
    • pp.45-54
    • /
    • 2007
  • 가장 위협적인 공격의 한 형태인 DDoS(Distributed Denial of Service) 공격은 다수의 공격 에이전트가 한꺼번에 많은 공격 트래픽을 특정 네트워크 또는 중요한 노드를 공격하는 특성을 갖고 있어 이로 인한 피해 지역 및 정도가 크다는 문제점이 있다. 이에 대한 기존의 많은 연구들은 탐지, 필터링, 추적 등에 집중되어 있고, 특히 피해 네트워크가 계층적인 구조를 갖고 있는 경우 특정 노드의 마비로 인해 하위 노드들의 정상 트래픽 전송이 어려워질 뿐 아니라, 탐지에 대한 다른 노드에 공지 및 추적을 위한 제어 트래픽 전송 또한 어려워 질 수 있다. 이에 본 논문에서는 계층적인 네트워크에서 이에 맞는 계층적인 오버레이를 구성하여, 공격 탐지 시 공지 및 추적을 위한 제어 트래픽을 오버레이를 이용해 전달하며, 공격 에이전트를 완전히 제거하기 전까지 정상적인 트래픽을 우회할 수 있는 DDoS 공격 감내 네트워크 구조를 제안한다. 또한 제안된 방법에서 오버레이 구성에 따른 오버헤드 분석과 공격 탐지 시 빠른 공격 차단 전달의 가능성과 신속성 및 정상 트래픽의 전송의 정도를 시뮬레이션을 통해 분석한다.

성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구 (A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System)

  • 이상현;김우중
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF