Heavy structures such as large roof structures and superbeams were lifted using hydraulic jacks. Moreover, member verticality and horizontality checks were performed at every construction stage to monitor the measuring tapes for their structural safety, using CCTV. When the relative displacement exceeded the predetermined limit, the hydraulic systems were terminated. After adjusting the relative displacement manually, lifting was resumed. The accuracy of the relative displacement was found not to be reliable, however, due to eye check using CCTV, and it took a long time due to manual adjustment. Moreover, real-time monitoring was impossible. To address these problems, the monitoring-evaluation system for the stable lifting of heavy structures was proposed, using the total station of the automatic-target-recognition type, laser-distance-measuring devices, a data logger, a strain gauge, and others. After developing a program for the operation of the system and for the acquisition of data, a mock-up test was conducted in a large-scale structural laboratory to evaluate the accuracy and applicability of the system. The stable acquisition and applicability of data was confirmed in the test.
Special Issue of the Society of Naval Architects of Korea
/
2009.09a
/
pp.97-106
/
2009
Many production methods are tried to enhance the productivity efficiency. Parallel connected floating cranes are one of the examples to lift mega-blocks quickly and efficiently. However, a general operation manual to operate parallel connected floating cranes and a method to consider risks during lifting operation are not confirmed. And if each floating crane is operated by itself, it is very hard to cooperate. Therefore, Synchronized operation system is installed to control parallel connected floating cranes simultaneously and to be informed of each floating cranes data. And weighting factor is calculated by considering all hazards during the operation and the general operation manual is confirmed based on the factor. This paper introduces the procedure for lifting operations by parallel Connected Floating Cranes using synchronized operation system, and its applications to lifting operation of a heavy cargo such as barge lifting test, floating dock installation and 900 ton goliath crane replacement operation, etc.
Heavy rain over the Gangwon region has distinct characteristics in the temporal and spatial distribution of rainfall, most of which are concentrated on a very short period of time and either part of Yeongdong and Yeongseo regions. According to its regional distribution, heavy rain events over the Gangwon region may be classified into Yeongdong and Yeongseo heavy rain in which rainfalls of more than 110 mm $(6 hrs)^{-1}$ (heavy rain warning) have been observed in at least one of the weather stations over only Yeongdong or Yeongseo region, but over the other region the rainfalls are less than 70 mm $(6 hrs)^{-1}$ (heavy rain advisory). To differentiate between Yeongdong and Yeongseo heavy rain, 9 cases for Yeongdong heavy rain and 8 cases for Yeongseo heavy rain are examined on their synoptic and mesoscale environments using some meteorological parameters and ingredients. In addition, 8 cases are examined in which heavy rain warning or advisory are issued in both Yeongdong and Yeongseo regions. The cases for each heavy rain type have shown largely similar features in some meteorological parameters and ingredients. Based on an ingredient analysis, there are three common and basic ingredients for the three heavy rain types: instability, moisture, and lift. However, it is found that the distinct and important process producing strong upward vertical motions may discriminate among three heavy rain types very well. Yeongdong heavy rain is characterized by strong orographic lifting, Yeongseo heavy rain by high instability (high CAPE), and heavy rain over both regions by strong synoptic-scale ascent (strong 850 hPa Q-Vector convergence, diagnostics for ascent). These ingredients and diagnostics for the ingredients can be used to forecasting the potential for regional heavy rain. And also by knowing which of ingredients is important for each heavy rain type, forecasters can concentrate on only a few ingredients from numerous diagnostic and prognostic products for forecasting heavy rain events.
Spinal cord infarction is uncommon and usually presents with sudden onset of motor and sensory disturbances. We report a case of a 64-year-old women without previous medical history, who presented with acute onset of paraplegia after lifting. However, radiologic examinations did not show any abnormal lesion in the spinal cord. And, cerebrospinal fluid studies also showed no remarkable findings. This case illustrates the cause of spontaneous paraplegia after lifting injury and we consider the presumptive cause of paraplegia as spinal cord infarction.
Kim, Young-Zoo;Kim, Kang-Uk;Kim, Suk-Hyoung;Kang, Sung-Won;Kim, Soo-Ho
Journal of Welding and Joining
/
v.25
no.6
/
pp.44-52
/
2007
A welding process of a lifting lug for lifting heavy objects is one of the important welding processes directly related to the safety in shipbuilding. Welding a lifting lug is done in the manually and takes about forty minutes. Working environment for the lifting lug welding is very poor due to an radiant heat and a harmful fume. The purpose of this study is to develop methods of multi-pass welding using the lifting lug welding robot system. This study shows robot welding methods to achieve proper corner, straight and connection welding and an effectiveness of application.
Journal of the Korea Academia-Industrial cooperation Society
/
v.13
no.10
/
pp.4629-4635
/
2012
This study was aimed at the relationship between peak EMG amplitude on low back muscles acting on L5/S1 and load center of gravity, trunk lateral bending while lifting an object. Musculoskeletal disorders including low back pain can occur even when handling heavy objects only once as well as when doing non-heavy materials repeatedly. 11 male subjects with average 23 age were required to lift a 15.8kg object symmetrically three times. Peak EMG amplitudes on 6 muscles related with L5/S1 were recorded and analyzed. The lifting conditions consisted of lifting symmetric load with no trunk lateral bending, asymmetric load with no trunk lateral bending, and asymmetric load with trunk lateral bending to the load center of gravity within an object. The results showed that peak EMG amplitude on back muscles contralateral to load center of gravity was observed greater in comparison with the symmetric load. Also, in case of lifting asymmetric load the posture with trunk lateral bending increased peak EMG amplitude on muscles contralateral to load center of gravity more than with no trunk lateral bending. This research can be used as one administrative intervention in order to reduce the low back pain incidence with suggesting workers that they keep the trunk not bending to load center of gravity if possible when lifting a heavy asymmetric object.
International Journal of Naval Architecture and Ocean Engineering
/
v.8
no.1
/
pp.83-101
/
2016
This paper suggests an event-based scenario manager capable of creating and editing a scenario for shipbuilding process simulation based on multibody dynamics. To configure various situation in shipyards and easily connect with multibody dynamics, the proposed method has two main concepts: an Actor and an Action List. The Actor represents the anatomic unit of action in the multibody dynamics and can be connected to a specific component of the dynamics kernel such as the body and joint. The user can make a scenario up by combining the actors. The Action List contains information for arranging and executing the actors. Since the shipbuilding process is a kind of event-based sequence, all simulation models were configured using Discrete EVent System Specification (DEVS) formalism. The proposed method was applied to simulations of various operations in shipyards such as lifting and erection of a block and heavy load lifting operation using multiple cranes.
Kim, Oe-Jo;Yu, Wan-Seok;Yun, Kyeong-Hwa;Gang, Ha-Geun
Transactions of the Korean Society of Mechanical Engineers A
/
v.20
no.4
/
pp.1154-1163
/
1996
This paper presents a three dimensional modeling and dynamic anlaysis of a hydraulic excavator. An excavator is composed of a ground, an under-frame, two idlers, two spockets, an upper-frame, a boom, an arm, a bucket two yokes, two connecting rods, two boom cylinders, an arm cylinder, and a bucket cylinder. Each cylinder is modeled with two separate bodies which are linked to each other by a translational joint. The three dimensioanl model of the excavator consists of 22 bodies and each body is assumed as rigid. This paper suggested the maximum lifting capability, a critical load and reaction forces at joints form the DADS simulation. It was presumed that the reaction forces due to a critical load are three times bigger than those due to the maximum lifting capacity.
Nursing often requires heavy physical work activities such as lifting heavy loads, working in awkward postures, transferring patients, operating hazardous equipment, etc. Among various nursing tasks, patients transferring is one of the most physically demanding tasks. This study aims to investigate workload of the patients transferring, and to propose its improving methods for reducing high workload. The results showed that irrespective of methods for patients transferring and the number of workers involved, workload for most patients transferring tasks exceeded the action limit represented in terms of L5/SI compressive force of 3,400N or LI of 1.0 by NIOSH. The loads for some tasks were far larger than the maximum permissible limit of 6,400N. It is recommended that the mechanical devices for transferring patients such as ceiling crane, sling lift etc. should be introduced rather than simply increasing the number of workers in the tasks.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.