Main challenges for deep subsea tunnels based on norwegian experience

  • Nilsen, Bjorn
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.5
    • /
    • pp.563-573
    • /
    • 2015
  • For hard rock subsea tunnels the most challenging rock mass conditions are in most cases represented by major faults/weakness zones. Poor stability weakness zones with large water inflow can be particularly problematic. At the pre-construction investigation stage, geological and engineering geological mapping, refraction seismic investigation and core drilling are the most important methods for identifying potentially adverse rock mass conditions. During excavation, continuous engineering geological mapping and probe drilling ahead of the face are carried out, and for the most recent Norwegian subsea tunnel projects, MWD (Measurement While Drilling) has also been used. During excavation, grouting ahead of the tunnel face is carried out whenever required according to the results from probe drilling. Sealing of water inflow by pre-grouting is particularly important before tunnelling into a section of poor rock mass quality. When excavating through weakness zones, a special methodology is normally applied, including spiling bolts, short blast round lengths and installation of reinforced sprayed concrete arches close to the face. The basic aspects of investigation, support and tunnelling for major weakness zones are discussed in this paper and illustrated by cases representing two very challenging projects which were recently completed (Atlantic Ocean tunnel and T-connection), one which is under construction (Ryfast) and one which is planned to be built in the near future (Rogfast).

A Development and Utilization of Geotechnical Information System(GTIS) of the Rock Mass in A Seoul Metropolitan Area(1) (서울일대 암반을 대상으로 한 Geotechnical Information System(GTIS)의 개발 및 활용(1))

  • 김정엽;전효택;박형동
    • Tunnel and Underground Space
    • /
    • v.5 no.4
    • /
    • pp.336-346
    • /
    • 1995
  • Geotechnical Information System (GTIS) for efficient management of three dimensional borehole data has been developed. Some problems were raised during the input process of borehole data, and alternative solutions were sought. According to the previous geotechnical reports, there is no unified weathering classification scheme. A criterion, 100 times/30cm from SPT, was turned out inappropriate to the discrimination of weathered rock from weathered soil. It has also been suggested that weathered soil, weathered rock, soft rock, and hard rock should be defined as CW, HW, MW, and SW~fresh condition. For better comparison of RQD, the use of NX size coring is recommended for the whole area although BX size coring has been used in excavated area. The limit of drilling depth up to 1 m from the top of surface of hard rock should be extended to avoid possible wrong interpretation of rock head due to the existence of corestone. The input data were analysed by geostatistical methods. It is found that the range in semivariogram is about 300m, and the variance of gneiss is greater than that of granite. It is because the granite data analysed came from almost single uniform rock mass(i.e.Seoul granite), but gneiss data came from the rock mass(i.e. Gyeonggi gneiss complex experienced several metamorphic metamorphic processes.

  • PDF

A Case of Application in Hard Rock Tunnel and Development of High Performance Emulsion Explosives (MegaMEX) (고성능 Emulsion 폭약(MegaMEX)의 개발 및 경암 터널에서의 적용 사례)

  • Min Hyung-Dong;Lee Yun-Jae;Park Yun-Seok;Choi Kyung-Yeol
    • Explosives and Blasting
    • /
    • v.23 no.1
    • /
    • pp.55-64
    • /
    • 2005
  • Safe and cheap emulsion explosives have recently replaced the existing CD explosives in order for people to reduce the prime cost and to prevent the safety accidents from happening in construction and civil engineering sites. However, the emulsion explosives have been in reality fared with difficulties in terms of the blasting force when using them in the tunnel constructed in the rock mass composed of hard rock. In this regards, this study is to verify their blasting efficiency and possibility of construction by applying MegaMEX, one of the high performance Emulsion explosives, to the rock mass of hard rock. In terms of their blasting efficiency such as advance ratio and fragmentation, it has turned out that they have overcome the limit of the existing Emulsion explosives and they have had the equivalent level of MegaMITE, one of the GD(Gelatin dynamite) types of explosives while they have been also advantageous to the environmental aspects.

Blast Excavation of Small Diameter Tunnel near Underground pipe lines (지하 관 시설물과 인접한 소규모 단면 터널의 발파굴착 사례)

  • Won, Yeon-Ho;Kim, Kang-Gyu
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.40-54
    • /
    • 2010
  • The messer shield method applys mainly to a tunnel with small cross-section of a weathered soil or weathered rock district and is fulfilled mostly by man-power excavation. but in case that hard rock exposes on tunnel face, incredible is an application of the rock-splitting method using a hydraulic power or a blasting method. This study represents the case of a blasting method which can control to be practiced by the minimum charges of 125 g an initial vibration occurring at the cut instead of the rock-splitting method, even though water pipe and gas pipe are closely adjacent.

Analysis and Assessment of Tunnel Boring Machine Performance in Hard Rock (경암반에서 TBM 굴진 해석 및 평가)

  • 배규진;이용수;홍성완;박홍조
    • Tunnel and Underground Space
    • /
    • v.4 no.2
    • /
    • pp.144-155
    • /
    • 1994
  • This research is designed to assess current achievement levels for mechanized excavation systems in Korea adn suggest the model predictive of TBM performance using statistical approaches. A test section in the TBM construction sites is selected to measure and analyze TBM performance. The field records including operating data, time allocation into downtime catagories, and machine design are analyzed on a shift basis. There are a total of 240 shifts, with most days operating two shifts per day. Examples of the probability density functions produced from the test section are presented and discussed. Relationships between TBM penetration rate and rock physical properties are investigated and the empirical equations for TBM performance prediction are also assessed with the field data.

  • PDF

Numerical Simulation of Radial Strain Controlled Uniaxial and Triaxial Compression Test of Rock Using Bonded Particle Model (입자결합모델을 이용한 횡방향 변형률 제어 하에서의 암석의 일축 및 삼축압축시험의 수치적 모사)

  • Lee, Chang-Soo;Kwon, Sang-Ki;Jeon, Seok-Won
    • Tunnel and Underground Space
    • /
    • v.21 no.3
    • /
    • pp.216-224
    • /
    • 2011
  • In this study, Class II behavior of rock failure process under uniaxial and biaxial compression has been numerically simulated using bonded particle model. Class II behavior of rock was simulated by radial strain controlled uniaxial and biaxial compression tests using a suggested method of ISRM. Micro-parameters used in the simulation were determined based on the laboratory uniaxial compression tests carried out at ${\"{A}}sp{\"{o}}$ Hard Rock Laboratory, Sweden. Class II behavior of ${\"{A}}sp{\"{o}}$ rock was effectively simulated using newly proposed numerical technique in this study, and the results of numerical simulations show good similarity with the complete stress-strain curves for Class II behavior obtained from the laboratory tests.

Technical lessons learnt from the case history of tunnel collapses (터널 붕괴사례로 부터의 기술적 교훈)

  • Shin, Hyu-Soung;Kwon, Young-Cheul;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.835-844
    • /
    • 2009
  • In this study, a database composed by 46 cases of tunnel collapses has been built up. Based on the database, comprehensive data analysis is carried out, providing us a number of the technical lessons, which can be considered in future design and construction to minimize possibility of tunnel collapse disaster. For making a better understanding, the technical lessons are given in two divisions: mountain tunnel and urban tunnel. Tunnel collapses taking place in the former tunnel are generally due to bad discontinuity condition of jointed rock mass. Otherwise, urban tunnel has weak condition generally on ground water and weathering of ground. Most of technical comments given in this paper are made based on the cases of tunnel collapses only used in this study, so that the comments seems to be hard to be available to all the tunnelling cases. However, the comment should be valuable technical lessons for tunnel engineers to consider in tunnel design or construction.

  • PDF

Tunnel-Lining Back Analysis for Characterizing Seepage and Rock Motion (투수 및 암반거동 파악을 위한 터널 라이닝의 역해석)

  • Choi Joon-Woo;Lee In-Mo;Kong Jung-Sik
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.248-255
    • /
    • 2006
  • Among a variety of influencing components, time-variant seepage and long-term underground motion are important to understand the abnormal behavior of tunnels. Excessiveness of these two components could be the direct cause of severe damage on tunnels. however, it is not easy to quantify the effect of these on the behavior of tunnels. These parameters can be estimated by using inverse methods once the appropriate relationship between inputs and results are clarified. Various inverse methods or parameter estimation techniques such as artificial neural network and least square method can be used depending on the characteristics of given problems. Numerical analyses, experiments, or monitoring results are frequently used to prepare a set of inputs and results to establish the back analysis models. In this study, a back analysis method has been developed to estimate geotechnically hard-to-known parameters such as permeability of tunnel filter, underground water table, long-term rock mass load, size of damaged zone associated with seepage and long-term underground motion. The artificial neural network technique is adopted and the numerical models developed in the firstpart are used to prepare a set of data for learning process. Tunnel behavior especially the displacements of the lining has been exclusively investigated for the back analysis.

  • PDF

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

A Study of Rockbursts Within a Deep Mountain TBM Tunnel (산악 TBM 터널에서 발생한 암반파열 현상에 대한 연구)

  • Lee, Seong-Min;Park, Boo-Seong
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.39-47
    • /
    • 2003
  • Rockbursts are mainly caused by a sudden release or the stored strain energy in the rock mass. They have been the major hazard in deep hard rock mines but rarely occur in tunnels. Due to the short history and limited information on rockbursts, the topic has rarely been studied in Korea. Some cases of rockbursts, however, have been reported during construction of a mountain tunnel for waterway. This study focuses on analyzing data on rockbursts obtained from a TBM (Tunnel Boring Machine) tunnel and suggests methods for a comprehensive understanding on rockbursts. From the analysis of the field data of rockbursts, it was found that most rockbursts mainly occurred at the section between the tunnel face and the TBM operating room, and the rock bursting phenomena lasted up to 20 days after excavation in certain areas. The data also show that the bursting spots are located all around the tunnel surface including the face, the wall, and the roof, The maximum size of bursting spots is usually less than 100cm. This study also suggests new scale systems of brittleness and uniaxial compressive strength to evaluate the possible tendency for a rockburst. These systems are scaled based on the scale system of strain energy density. In addition, with these scale systems, this research shows that there are potentially higher tendencies for rockbursts in this specific tunnel. Moreover this research suggests that properties of rock and rock mass, RMR (Rock Mass Rating) value, tunneling method, excavating speed, and depth of tunnel have a strong correlation with rockbursts.