• 제목/요약/키워드: Hard Rock Blasting

검색결과 23건 처리시간 0.02초

발파에 의한 터널확대 굴착 시 교통처리를 위한 교통량 분석 (Analysis of traffic volume for control during an existing tunnel enlargement)

  • 김웅구;백기현;서경원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1328-1332
    • /
    • 2010
  • The enlargement of existing tunnels is required to cope with problems related to traffic congestion. Sometimes, the tunnel traffic must be maintained through existing tunnels during their reconstruction due to non-availability of detours. And excavation by drill and blasting is desired for widening a hard rock tunnel. In this case, the road must be closed for some period for blasting through analyzing of traffic volume. In this paper, a case study on some traffic countermeasures for tunnel enlargement by blasting was performed. And the traffic flow characteristics of some tunnels in domestic main city were analyzed.

  • PDF

삼천포화력발전소 3, 4호기 증설에 따르는 정밀발파작업으로 인한 인접가동발전기 및 구조물에 미치는 진동영향조사 (On the vibration influence to the running power plant facilities when the foundation excavated of the cautious blasting works)

  • 허진
    • 기술사
    • /
    • 제24권6호
    • /
    • pp.97-105
    • /
    • 1991
  • The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill ø70mm on the calcalious sand stone (soft-moderate-semi hard Rock). The total numbers of fire blast were 88 round. Scale distance were induces 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagation Law in Blasting Vibration (Equation omitted) where V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites(m) W : Maximum Charge per delay-period of eighit milliseconds o. more(kg) K : Ground transmission constant, empirically determind on the Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents Where the quantity D / W$^n$ is known as the Scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagrorized in three graups. Cubic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge per delay Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom and over 100m distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30 ‥‥‥under 100m ‥‥‥V=41(D/$^3$√W)$\^$-1.41/ ‥‥‥A Over 100 ‥‥‥‥under 100m ‥‥‥V=121(D/$^3$√W)$\^$-1.56/ ‥‥‥B K value on the above equation has to be more specified for furthur understang about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

전자뇌관과 다단장약을 이용한 발파 사례 연구 (A Case Study on Multiple-deck-charge Blasting with Electronic Detonators)

  • 고태영;신창오;이효;이승철
    • 화약ㆍ발파
    • /
    • 제30권2호
    • /
    • pp.52-58
    • /
    • 2012
  • 싱가포르 DTL2 C915 건설공사 중 TBM 발진을 위한 개착구간의 암발파 공사를 위해 당초 전기뇌관과 ANFO로 발파시공이 계획되었으나 1회 발파공수 제한 및 가시설에 대한 엄격한 진동관리 규정 등으로 인해 작업공정이 많이 지연되어 TBM 발진을 위한 예정된 공기를 준수하지 못하는 것으로 검토되었다. 따라서 암발파 공법의 효율을 개선하고 1회 발파공수 및 파쇄면적의 최대화를 위해 다단장약이 검토되었으며, 다단장약의 효율성을 높이기 위해 정밀성이 장점인 전자뇌관이 선정되었다. 다단장약 적용으로 천공장이 길어짐에 따라 커지는 암반 구속력에 대응하기 위해 폭약의 위력을 증대시키는 방안으로 Emulsion Cartridge 폭약을 적용하였다. 그 결과 발파효율과 시공성을 개선함과 동시에 가시설의 안정성을 확보할 수 있었다.

노천광산의 발파분진 비산영역 예측에 관한 연구 (Study on Simulation of Dust Diffusion at Open Pit Mines)

  • 김복윤;이상권;조영도;김임호
    • 터널과지하공간
    • /
    • 제8권3호
    • /
    • pp.194-199
    • /
    • 1998
  • 본 연구는 석회석 노천채광장의 발파 분진이 주변을 통과하는 특고압 선로에 어느정도 비산 퇴적할 것인지, 어떤 문제를 일으킬 것인지를 평가하기 위한 연구였다. 발파 현장이 분진 발생량 및 입도분포는 그간의 연구 실적도 있고 계측도 가능하지만 얼마만큼의 분진이 어느 정도 거리까지 비산 퇴적할 것인지를 예측하기란 매우 어려운 일이다. 따라서 본 연구에서는 최근 개발한 바 있는 수치유체역학(CFD)을 이용한 3차원 유체거동 해석 프로그램(3D-Flow)을 이용하여 송전선로에 미치는 영향을 예측하는 시도를 하였다. 지형조건, 기상조건에 따른 시뮬레이션을 통하여 석회석 분진은 송전선로에 큰 영향을 미치지 않을 것으로 판단 되었다.

  • PDF

터널용 벌크 폭약(New Emulite 1000)의 국내 경암 터널 시공사례 및 향후 발전 방향에 관한 연구 (A Case Study of Application of the Bulk Emulite In Hard Rock Tunnel)

  • 조영곤;이상돈;김희도
    • 화약ㆍ발파
    • /
    • 제19권3호
    • /
    • pp.39-47
    • /
    • 2001
  • Bulk-Emulsion system은 미주나 서구 유럽 등지의 발파분야에 있어 선구적인 역할을 수행하여 왔던 나라에서는 이미 보편화된 시스템으로 ANFO 다음으로 노천이나 터널 굴진에 널리 적용되고 있다. Bulk-Emulsion system은 제조, 저장, 운반 및 사용에 있어서 극히 안전하고 장전밀도를 증가시켜 효과적인 파쇄와 굴진률 향상을 기대할 수 있으며 발파 후가스가 매우 양호한것을 비롯하여 기계화 장전에 따른 시공 능률 향상과 작업 안전성 강화 등 많은 장점을 가지고 있다. 본 연구에서는 고속도로 터널 현장에 국내 최초로 터널용 Bulk-Emulsion system을 이용하여 총 15회에 걸쳐 시험발파를 실시하였으며 이 결과를 토대로 하여 Bulk-Emulsion system 적용에 따른 효과와 문제점을 알아보고자 하였다.

  • PDF

지반진동이 건물의 균열에 미치는 영향에 관한 연구 -부산 안산암지역을 대상으로- (A Study of Effects on Building for Cracks by Ground Vibration -Pusan Andesite-)

  • 안명석;박종남;이영대
    • 소음진동
    • /
    • 제9권6호
    • /
    • pp.1173-1179
    • /
    • 1999
  • A study was made on crack developments of the nearly building due to rock blasting for road construction at the 623 Common Block near the rear side of the Gamchun Habor. The gelogy of the study area is composed of andesite, which belongs to the Kyungsang System of the Cretaceous Period. For 3 months of blasting events, the vibration velocity data were measured at the site just in front of the K freezing factory. The data were divided into 4 groups according to the period of blasting(i.e, DATA 1, DATA 2, DATA 3 and DATA 4), for deriving K and n values. As a result, DATA 1 shows that K and n were 83.3756 and -0.848, respectively, and then K and n were progressively increased in absolute values for the follow-up groups and the last DATA 4 shows K and n were 2980.4898 and -1.502, respectively. Such differences in K and n values may be due to partly : 1) variations geological characteristics, from the upper rather weathered, fisssuring soft rocks at the earlier stage less weathered and fissuring hard rocks at the later stage of blasting events, and 2) the geometry between the blasting and detecting points.Among the total count of 225 blasting events, the number exceeding the safety limits of 0.5cm/sec was 20(8.9% of the total), the maximum displacement detected at the crack gage was 0.25mm, the level of which is far less to cause the occurrence and development of any cracks to the K factory. Therefore, it was confirmed that there were no damages such as structural failure or safety problem to the building.

  • PDF

지하탄약고의 설계요소 및 폭발안전 연구 (Design consideration and explosion safety of underground ammunition storage facilities)

  • 김운영;이명재;김민석;김준엽;주효준
    • 한국터널지하공간학회 논문집
    • /
    • 제5권1호
    • /
    • pp.55-70
    • /
    • 2003
  • 지상형 탄약저장시설은 폭발시 인명과 재산의 피해가 크고 외부공격에 대하여 취약하므로 안전성, 부지확보 및 유지관리에서 유리한 지하탄약고의 개발이 절실하다. 본 연구에서는 폭발시 안전성 및 수불장비의 동선을 고려한 지하탄약고 시설배치와 방폭시설의 국내 설계사례를 소개하였다. ${\bigcirc}{\bigcirc}$지하탄약고는 경암지역에 불연속면의 영향이 적도록 주응력방향과 거의 평행하게 3개소의 저장격실이 배치되도록 설계되었다. 또한 국방부 폭발안전기준을 만족하는 안전거리를 확보하였고, 탄약 수불장비의 동선 시뮬레이션을 통해 시설배치의 적절성을 검증하였다. 방폭시설은 임의 저장격실의 우발적 폭발시 발생하는 최대 폭풍압을 산정하여 연쇄폭발이 발생하지 않도록 인접격실의 보호를 위한 방폭문 및 방폭밸브 등을 설계하였고. 폭풍압의 저감을 위한 병목장치, 파편함정 등의 시설은 구조해석을 통해 국방부 폭발물안전기준을 만족하도록 규격을 결정하였다.

  • PDF

지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구 (A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction)

  • 박형근;고원근
    • 대한토목학회논문집
    • /
    • 제30권6D호
    • /
    • pp.623-629
    • /
    • 2010
  • 최근 도심지 굴착 시 고효율 급속시공이 가능한 쉴드 TBM(Tunnel Boring Machine) 공법의 도입이 점진적으로 증가하고 있다. 그러나 해당 장비에 대한 이해부족과 현지 지반조건을 충분히 고려하지 않은 상태로 쉴드 TBM의 설계 및 선정시 시공능력의 저하, 시공기간의 연장 및 공사비의 증가를 초래하는 경우가 빈번히 발생되고 있다. 이에 따라 본 사례연구에서는 풍화토, 풍화암 굴착에 적합하도록 설계된 쉴드 TBM 터널 굴착현장을 대상으로 쉴드 TBM 굴진 시 사전 지반조사의 결과와 달리 예기치 못한 경암구간 돌출로 굴진 중단 및 공기지연을 최소화하고자 적용된 대체공법의 적용성을 비교 분석하였다. 또, 터널 상 하행선 경암굴착에 적용된 대체공법의 선정부터 적용 후 결과에서 얻어진 굴진자료와 쉴드장비의 굴진속도, 공사기간, 공사비 등을 검토하여 연구대상 현장에 가장 적합한 대체공법을 판단 및 평가하였다. 본 연구의 결과를 요약하면 다음과 같다. 첫째, 굴진중단 및 대체공법 적용으로 인한 공사비, 공사기간의 증가를 방지하려면 대상현장의 정확한 지반조사가 선행되어야 하며, 이를 바탕으로 현장 지반조건에 가장 적합한 쉴드장비를 선정하는 것이 중요하다. 둘째, 대상현장에서 시행한 대체공법의 적용성을 분석한 결과, 경암구간 굴착을 위한 대체공법의 최선안은 개착 공법 후 경암 발파제거 공법임을 알 수 있었다.

고강도 암반에서 수직구 기계굴착을 위한 연마재 워터젯 활용에 관한 연구 (A study on the utilization of abrasive waterjet for mechanical excavation of hard rock in vertical shaft construction)

  • 조선아;정주환;류희환;박준식;오태민
    • 한국터널지하공간학회 논문집
    • /
    • 제25권5호
    • /
    • pp.357-371
    • /
    • 2023
  • TBM을 이용한 전력구 공사에서 수직구는 TBM 장비 및 전력선의 진출입을 위해 필수적인 구조물이다. 수직구는 지반을 수직으로 관통하여 굴착하기 때문에 암반을 굴착하는 경우가 많다. 암반 지반은 대부분 발파나 할암 공법을 적용하여 굴착하므로 이때 발생하는 소음 및 진동, 도로 점유로 인해 민원이 발생하고 있다. 따라서 기존 공법의 대안으로 기계식 굴착장비를 이용한 수직구 굴착을 고려하였다. 다만, 현 기술 수준에서 수직구 굴착장비는 암반의 압축강도 약 120 MPa 이상에서는 굴착성능이 현저히 저하되어 고강도 암반 지반 적용에 한계가 있다. 본 연구에서는 암반에서 기계식 굴착 성능 개선을 위해 연마재 워터젯 기술을 굴착 보조공법으로 활용하는 방안에 대해 검토하였다. 연마재 워터젯 절삭성능에 대한 검증을 위해 암석 절삭실험을 수행하고, 실험결과로부터 이격거리, 이송속도, 수압 조절을 통해 지반조건 변화에 대응하여 굴착성능을 확보하는 것이 적절할 것으로 판단하였다. 또한, 일축압축강도와 RQD, 굴진율의 관계를 이용하여 연마재 워터젯을 이용한 인위적인 절리생성을 통해 굴착성능을 향상시키는 방안을 제시하였다. 본 연구결과는 향후 수직구 기계식 굴착장비 도입을 위한 기초자료로 활용될 수 있을 것으로 기대된다.

터널굴진에서 장약 및 기폭방법 개선에 관한 연구 (A Study on the Improvement of a Charging and Initiating Method in a Tunnel Excavation)

  • 오이환;원연호;임한욱
    • 화약ㆍ발파
    • /
    • 제24권2호
    • /
    • pp.1-8
    • /
    • 2006
  • 본 연구는 규석광의 터널 굴착시 굴진장 향상과 사압현상 및 소결현상을 예방하기 위해 모든 장약공의 장약밀도를 다르게 적용하였다. 이 때 심발공은 동일 장약공내에 2개의 뇌관을 이용한 정기폭과 역기폭의 복합기폭방식을 도입하였다. 자유면 형성이 어려운 공저부분은 높은 장약밀도로 장전하고, 주상부분은 공저보다 낮은 장약밀도로 장전함으로써 폭약의 위력이 효과적으로 암반에 대응할 수 있는 공법인 복합장약기폭시스템을 개발하였다. 그 결과 경암이나 장공발파에서 흔히 발생되는 사압현상 및 소결현상 등을 방지할 수 있었다. 또한 1회 천공장 대비 굴진장을 95% 이상 증대시킴으로써 약 15% 정도의 시공능율이 향상되고 비장약량이 20% 정도 감소되었다.