Analysis of traffic volume for control during an existing tunnel enlargement

발파에 의한 터널확대 굴착 시 교통처리를 위한 교통량 분석

  • Published : 2010.09.09

Abstract

The enlargement of existing tunnels is required to cope with problems related to traffic congestion. Sometimes, the tunnel traffic must be maintained through existing tunnels during their reconstruction due to non-availability of detours. And excavation by drill and blasting is desired for widening a hard rock tunnel. In this case, the road must be closed for some period for blasting through analyzing of traffic volume. In this paper, a case study on some traffic countermeasures for tunnel enlargement by blasting was performed. And the traffic flow characteristics of some tunnels in domestic main city were analyzed.

Keywords