• Title/Summary/Keyword: Half-PC slab

Search Result 19, Processing Time 0.021 seconds

Development of the Construction Procedures Prototype and Analysis of Construction Period for the HPC Method (HPC공법의 공사절차 프로토타입 개발 및 공사기간 분석)

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.577-585
    • /
    • 2017
  • HPC method is developing to improve the constructability and structural performance of the existing PC method. The objective of this study is to develop construction procedures and to analysis of construction period for HPC method. In order to develop construction procedures, the building construction data of the existing half-slab method was analyzed. Analyzing design drawings and specifications of nine construction cases, a prototype of half-slab method, was drawn. Applying the core technology of HPC method to the drawn prototype of half-slab method, a prototype of HPC method, was developed. The differences of both methods were 'installing PC column' and 'placing topping concrete'. To analysis the differences of both methods, seven construction cases were analyzed. According to the analysis for HPC method, cases1 and 2 had columns divided for construction shortened about 16% of a construction period. The schedule of column assembly work was analyzed to be shortened much. That is judged to be because the use of a hollow PC column leads to a decrease in the number of columns. In particular, if HPC method is applied to a building construction site using large columns, it is analyzed to shorten a construction period more than the existing Half-slab method.

An Experimental Study on the Flexural Behavior of Slabs Using Kaiser Truss (Kaiser Truss를 사용한 일방향 슬래브의 휨 거동에 관한 연구)

  • 김형근;곽노현;류승곤;이희발;정헌수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.04a
    • /
    • pp.30-35
    • /
    • 1994
  • In order to investigate on the behavior of one-way slab with Kaiser. Truss, such as flexural strength, failure mode, and ductile capacity, a total of twenty specimens have been tested and compared with the R.C slab without Kaiser Truss. The major variables are Kaiser Truss intervals(30, 40, 60cm), half slab thickness. Test results showed that support interval of half pc slab can be determined by the flexural strength which causes the concrete crack and there are horizontal cracks between upper concrete and half slab in the connection of the specimen with kaiser truss interval 60cm.

  • PDF

An Experimental Study on In-Plane Shear Strength of the Interface between Half PC Plate and Cast-in-Place Concrete Plate (하프 PC판과 후타설콘크리트 접합면의 면내전단강도에 관한 실험적 연구)

  • 신동원;고만영;이동우;김용부
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10a
    • /
    • pp.513-518
    • /
    • 1998
  • In Half Precast Concrete Method, such as composite slab and composite wall, Interface between half PC plate and cast-in-place concrete is occurred. And this interface endure lastly in-plane shear which is occurred by external force. Therefore, test was executed to study in-plane shear strength of interface between half PC plate and cast-in-place concrete. In this test, Experimental parameters are finishing condition of the interface, cohesion of concrete, existence and nonexistence of re-bar truss, and angle and direction of lattice of re-bar truss. Comparing and analyzing experimental results, conclusions are obtained as follows. (1) In-plane shear strength of wide interface in composite plate is more affected by the roughness of interface than re-bar truss. And cohesion of concrete contribute to increasing in-plane shear strength. Therefore it seems that the interface should be roughen and kept clean to improve in-plane shear strength. (2) It seems that shear friction equation in ACI code can be sagely available for design of in-plane shear of composite plate.

  • PDF

Flexural Capacity of Precast Concrete Triple Ribs Slab (프리캐스트 콘크리트 트리플 리브 슬래브의 휨성능)

  • Hwang, Seung-bum;Seo, Soo-yeon;Lee, Kang-cheol;Lee, Seok-hyun
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.1
    • /
    • pp.3-11
    • /
    • 2016
  • The concern about hollow core PC slab has been increased to improve the workability during a construction of building by reducing self weight of structural members. In this manner, recently, TRS (Tripple Ribs Slab) was developed as a new type of half PC slab system. TRS member consists of the triple webs and the bottom flange prestressed by strands. The slab system is completed by casting of topping concrete on the TRS after filling styrofoam between the webs. This paper, presents a flexural experiment to investigate the flexural capacity of the TRS. Five full scale TRS members were made and tested under simple support condition to be failed by flexure and their strength was evaluated by code equations; the variables in the test are the depth and the presence of topping or raised spot formed when slip-forming. In addition, a nonlinear sectional analysis was performed for the specimens and the result was compared with the test results. From the study, it was found that the TRS has enough flexural strength and ductility to resist the design loads and its strength can be suitably predicted by using code equations. The raised spot did not affect the strength so that the spot need not to be removed by doing additional work. For the more accurate prediction of TRS's flexural behavior by using nonlinear sectional analysis, it is recommended to consider the concrete's brittle property due to slip-forming process in the modeling.

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

Performance of connection of Waffle Shape Precast Prestressed Concrete Slab Panels (와플(Waffle) 형상을 가지는 PC 패널의 접합 성능)

  • Heo, Seok-Jae;Kim, Hyeon-Jin;Ryu, Han-Gook;Choi, Kyoung-Kyu;Cho, Seung-Ho;Chung, Lan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.305-308
    • /
    • 2008
  • This paper presents the results of an experimental study carried out Prestressed Concrete Slab System of WAffle Shape(WAS), was perfomed in order to inverstigate it connection shear behavior according to primary paramaters: connection interval, filling matarial. Specimen is produced in Precast Concrete factories and it comprised one WAS panel and two half WAS panels and then it is filled with packing. Within the ranges of the parameters of the connection details used in this test, connections can develop greater shear strength than the nominal shear strength and the design service load for parking structures.

  • PDF

An experimental evaluation of hardened property of concrete using early-strength-binder with curing temperature (조강형 결합재를 사용한 콘크리트의 양생온도에 따른 경화특성 실험적 평가)

  • Kim, Kwang-Ki;Kim, Young-sun;Lee, Joo-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.88-89
    • /
    • 2015
  • In cold weather, the speed of concrete strength development is slow. As a result, construction speed becomes slow and it is problem for all construction site to solve this. So in this study, to shorten removing frame time after placing concrete, mix proportion using early-strength-binder(ESB) and curing method such as using heat line in concrete was considered. At first, concrete mix proportion was examined at -5℃ temperature between ordinary portland cement(OPC) and ESB. And second step, concrete, using mix proportion with OPC, was examined according to curing method(: 1) heat line used and 2) no heat line) and kinds of form (: 1) Deck slab, 2) Half PC slab and 3) SOG slab). All cases are same condition: slab thickness is 1,500mm, double-bubble sheet is used as a curing sheet after placing concrete. After the test, OPC is enough to get strength compared to ESB in special condition and 48~60 hours is needed according to form condition.

  • PDF

Prediction of Drying Shrinkage behavior of Half PC Slab (주차장 무근콘크리트 컬링에 관한 실험적 연구)

  • Seo, Tae-Seok;Choi, Hoon-Jae;Gong, Min-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.88-89
    • /
    • 2017
  • Curling is caused by the shrinkage difference between surface and bottom side of concrete, and the cracks can be occurred by vehicle load after curling. It is important to investigate and predict the curling behavior to minimize the quality defect of concrete due to the curling. Therefore, the experimental and analytical investigation was carried out.

  • PDF

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.