Development of the Construction Procedures Prototype and Analysis of Construction Period for the HPC Method (HPC공법의 공사절차 프로토타입 개발 및 공사기간 분석)

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.577-585
    • /
    • 2017
  • HPC method is developing to improve the constructability and structural performance of the existing PC method. The objective of this study is to develop construction procedures and to analysis of construction period for HPC method. In order to develop construction procedures, the building construction data of the existing half-slab method was analyzed. Analyzing design drawings and specifications of nine construction cases, a prototype of half-slab method, was drawn. Applying the core technology of HPC method to the drawn prototype of half-slab method, a prototype of HPC method, was developed. The differences of both methods were 'installing PC column' and 'placing topping concrete'. To analysis the differences of both methods, seven construction cases were analyzed. According to the analysis for HPC method, cases1 and 2 had columns divided for construction shortened about 16% of a construction period. The schedule of column assembly work was analyzed to be shortened much. That is judged to be because the use of a hollow PC column leads to a decrease in the number of columns. In particular, if HPC method is applied to a building construction site using large columns, it is analyzed to shorten a construction period more than the existing Half-slab method.

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.

Construction Cost Analysis of HPC Method by PC Construction Project Cases (사례분석에 의한 HPC공법의 공사비 분석)

  • Noh, ju-seong;Kim, Jae-yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

Development of Selection Criteria for Composite Method Using Half-PC Slab (하프슬래브를 이용한 PC 복합공법의 선정기준 개발)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.103-104
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. This study is a basic research in the construction management aspect regarding 'composite method using hollow-PC column' (HPC method), and is intended to develop assessment standards for the benefit·cost analysis of HPC method. Assessment standards for the benefit·cost analysis were composed of main-factors and sub-factors through interview with 4 experts. It was possible to classify main-factors into 4 major categories, i.e,. structural performance, construction performance, construction duration and construction cost. Sub-factors were composed of factors which were of high importance in assessing the two methods. And factors judged to be repeated or of little importance were excluded.

  • PDF

Development and Evaluation of Hollow-head Precast Reinforced Concrete Pile (말뚝머리 중공 프리캐스트 철근콘크리트 말뚝의 성능 평가)

  • Bang, Jin-Wook;Hyun, Jung-Hwan;Ahn, Kyung-Chul;Kim, Yun-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.130-137
    • /
    • 2017
  • Due to the economic growth and development of construction technology, a role of foundation to resist heavy loads has been increased. In this present study to improve the structural performance of reinforced concrete pile, the precast HPC pile reinforced with rebar and filling concrete was developed and the strength of pile was predicted based on the limit state design method. The safety of HPC pile strength was evaluated by comparing with the design values. The geometry of HPC pile is a decagon cross section with a maximum width of 500 mm and a minimum width of 475 mm, and the hollow head of pile thickness is 70 mm. The inner area of the hollow head part was made as the square ribbed shape presented in the limit state design code in order to achieve horizontal shear strength between pile concrete and filling concrete. From the shear test results, it was found that the stable shear strength were secured without abrupt failure until maximum load stage despite the shear cracks was found. Shear strength is 135% and 119% higher than that of design value calculated from limit state design code. The driving test results of HPC pile according to the presence of additional reinforcement showed the outstanding crack resistance against impact loads condition. From the bending test results the flexural load between PHC pile and HPC pile was 1.51 times and 1.48 times higher than that of the design flexural load of conventional PHC pile.

Bridge Deck Overlay Technology Using High Performance Concrete (고성능 콘크리트를 활용한 교량 교면포장 기술)

  • Park, Hae-Geun;Won, Jong-Pil
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.1113-1116
    • /
    • 2008
  • The application of High Performance Concrete (HPC) for protecting bridge deck concrete with micro-silica, fly-ash and ground granulated blast-furnace slag was introduced to North America in the early 1980's. This report introduces the literature reviews of high performance concrete for protecting concrete bridge deck and explains 2-different types of construction methods using this materials. One is high performance concrete overlay method and the other is full depth bridge deck method. Both methods have been successfully applied and demonstrated in north america. Especially, modified high performance concrete overlay method including silica-fume and PVA fiber has been successfully applied in korea also. Therefore, both methods that high performance concrete overlay and full depth bridge deck are considered as reasonable bridge deck protecting methods compared with the conventional bridge deck system using asphalt modified materials.

  • PDF

기능성과 경제성을 겸비한 세종지하차도 설계

  • Jo, Seong-Tae;Song, Guk-Hwan;Lee, Hui-Geon
    • 한국도로학회지:도로
    • /
    • v.10 no.2
    • /
    • pp.58-67
    • /
    • 2008
  • 교통량이 많은 도심지내 장대 지하차도 건설은 교통정체 해소에 기여를 하지만 초기 공사비가 많이 소요되는 단점이 있다. 또한, 화재등 유고시 이용자의 안전을 최우선으로 고려되어야 한다. 즉, 장대 지하차도 건설에 있어서 경제성과 안전성이 함께 만족할 수 있는 건설 방안이 필요하다. 세종지하차도는 이러한 문제점을 극복하고자 다음과 같이 지하차도의 환기방식 및 단면, 포장형식, 사고 예방 및 발생시를 대비한 종합방재시스템을 구축하였다. $\cdot$환기방식은 종류식 환기방식의 경제성과 횡류식 환기방식의 제연성능을 겸비할 수 있는 조합형 환기방식과 Duct Arch 단면을 적용하여 공사비 절감 및 운영시 유지관리비를 획기적으로 절감하였다. $\cdot$지하차도 포장형식은 화재시 내화성이 우수하며 유독가스 발생이 없는 HPC(고성능 콘크리트 포장) 포장을 적용하여 이용자의 안전을 최우선으로 고려하였고 일반 아스팔트 포장 및 배수성 아스팔트 포장에 비해 우수한 성능과 공용수명을 가진 공법을 적용함으로서 유지보수비용의 절감을 가능하게 하였다. 또한, 콘크리트포장의 단점인 소음발생을 최소화하기 위해 타이닝과 그루빙을 적용하였다. $\cdot$지하차도내 화재 등 유고시 신속한 대피가 가능하도록 피난 연락문 간격을 167m 간격으로 설치하고 비상탈출계단 6개소를 확보하였다. 또한 노약자 및 환자의 지하차도 외부로 대피를 돕기 위해 비상엘리베이터 3개소를 설치하는 등 사고발생 시 종합적으로 대처할 수 있는 시스템을 마련하여 적용하였다.

  • PDF

Pile-cap Connection Behavior between Hollow-Head Precast Reinforced Concrete Pile and Foundation (프리캐스트 철근콘크리트 중공 말뚝과 기초 접합부 반복가력 거동)

  • Bang, Jin-Wook;Jo, Young-Jae;Ahn, Kyung-Chul;Kim, Yun-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.71-77
    • /
    • 2019
  • Recently, most of the pile foundations have been applied as a method to transfer the heavy load of the structure to the ground with high bearing capacity. In this study, the pile-cap behavior between foundation and hollow-head precast reinforced concrete(HPC) pile reinforced with longitudinal rebar and filling concrete was experimentally evaluated depending on the cyclic load and reinforcement ratio. As the drift ratio increases, it was found that the cracks pattern and fracture behavior of two types of pile-cap specimens according to the reinforcement ratio were evaluated to be similar. As the reinforcement ratio increases by 1.77 times, the BS-H25 specimen increases the maximum load by 1.47 times compared to the BS-H19 specimen. However, the ductility ratio of positive and negative was decreased by 76% and 70% respectively. After the yielding of the pile-cap reinforcing rebars, the positive and negative stiffness of the all specimens were decreased by a range from 66% to 71% and a range from 54% to 57% respectively, and the average stiffness of BS-H25 specimen is 13% higher than that of BS-H19 specimen. The cumulative dissipated energy capacity of BS-H19 and BS-H25 specimen under ultimate load state is 5.5 times and 6.6 times higher than that of service load state.