• Title/Summary/Keyword: Gyeongbu high-speed Line

Search Result 28, Processing Time 0.019 seconds

A Study on the Direct connection Service Effectiveness in Gyeongbu(KTX) (경부선(KTX) 직결운행 도입 효과에 관한 연구)

  • Kim, Ik-Hui;Kim, Yeong-Jin
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.91-100
    • /
    • 2007
  • This study suggests direct connection service which has advantage of high-speed operation of KTX and access convenience of general train, and Pre-feasibility studies on the direct connection service. And analyze transportation demand change by the method as follows; It is to analyze the demand change of before and after KTX operation by previous transport data of Gyeongbu line, and calculate the coefficient of utilization using triggering demand by opening the 2nd phase of Gyeongbu line (Dongdaegu${\sim}$Busan). Through Pre-feasibility analysis, reduction $70{\sim}100$ minutes of train travel time and total revenue will increase about $100 thousand per day. Also, there will be environment-friendly effects of decreasing $CO_2$ emissions. But, Direct connection service need to highly cost ; Buying and Operation cost of KTX train. Therefore, we will be get more correct result of Pre-feasibility study on direct connection service, if there are concrete on buying the KTX action plans.

A Study on Technology Trend according to Schedule Speed Improvement (표정속도 향상에 따른 기술동향 연구)

  • Lee, Hoon-Koo;Lee, Nam-Hyeong;Choi, Kyoung-Sun;Pyeon, Seon-Ho;Eum, Ki-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.140-144
    • /
    • 2011
  • As a result of that the domestic railway technology has been progressed as times go by, the 1st and the 2nd steps for Gyeongbu HSR at the speed of more than 300km/h, were completed and Honam HSR - its operational speed is 350km/h - is under construction. Additionally, As a part of the expressization project for general lines, the Seoul-Chuncheon route at the speed of more than 180[km/h] is under construction and the Jeolla route is under design. At present, 11 countries (e.g. France, Germany, Belgium, Italy, the Netherlands, Spain, England, Japan, China and Taiwan) including Korea have high speed railways operated at the speed of more than 300[km/h]. As shown in the above, the domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. For overseas railway, the ratio of schedule speed to the highest speed is above 65%, while that of domestic railways is over 50%. It shows a significant difference between them. It is expected that the schedule speed improvement will increase the number of train operation and line capacities than now, so it shall achieve smooth transportation flow and improve the passengers' satisfaction. In this paper we describe the necessity for the improvement of schedule speed, by analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand.

  • PDF

Analysis of Harmonic Frequency for Return Current on the Track Circuit in Electrical Railway System (전기철도시스템에서 궤도회로 측면의 귀선전류 고조파 분석)

  • Beak, Jong-Hyen
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.5
    • /
    • pp.698-704
    • /
    • 2012
  • Electric power used in electrical vehicles flows into the substation through the feedback circuit, track circuit. Due to these power conversion equipments in electrical railroads, return current contains harmonics, and it should not affect other communication lines. In this paper, based on the return currents, we measured harmonics and analyzed an influence in railway equipments due to the harmonics. For analysis, we utilize the measured values of return currents measured in track circuits, and predictive values of those compared to the earth methods between the existing electrified sections. Applying the regulations used for Gyeongbu HSL(High Speed Line), the results of measured harmonics have found to be acceptable.

Study on the mutual interference of mixed mode operation between KTX and AREX train at the airport linked line (공항철도연계 구간의 고속열차(KTX)와 전동열차(AREX) 혼용운용에 따른 ATP지상설비간 상호간섭 영향에 관한 연구)

  • Kim, Su-Bong;Song, In-Kuen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.23-30
    • /
    • 2016
  • ccording to the airport railroad linkage facility expansion project constructing a connecting line to the airport railway and improving the signal system and Gyeongui Susaek Station, a high-speed train is able to run directly from Gyeongbu and Honam to the airport railway. According to mixed operation of high-speed Korea Train Express (KTX) and Airport Railroad Express (AREX) trains, to establish ERTMS/ETCS L1 ATP to operate the KTX train, the signaling system of the AREX train is the same as the existing ATC/ATO, but its operation became impossible because the high-speed train causes mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment." Thus, it was necessary to have a supplemental technical interference analysis comparing the characteristics of the AREX beacon and the KTX balise. So, we resolve the problems of mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment" with a test using an actual train, and we confirm the technical validity with three types of test module.

Study on the Behavior of Curved Track in Honam High-Speed Line considering the Running Performanace for HEMU 430-X (HEMU 430-X 주행특성을 고려한 호남고속철도 곡선궤도구조의 거동연구)

  • Kang, Yun-Suk;Um, Ki-Young;Kim, Seog-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.8
    • /
    • pp.4068-4076
    • /
    • 2013
  • The wheel-rail interaction forces are influenced by the velocity of vehicle, wheel load, alignment (curve radius, cant etc). For the safety of track structure, it is required to evaluate the influences for track and influential factors. Recently, the HEMU 430-X, which was developed by Next Generation High-Speed Rail Development R&D Project, achieved 421.4km/h in a test run of Daegu.Busan section of the Gyeongbu high speed rail on March in 2013. In the case of additional speed-up test on Test-Bed Section(Gongju.Jeongeup: KP 100~128km Osong starting point), the analysis of track forces is required for outer rail by the increase of dynamic force and centrifugal force of vehicle. In this paper, the vehicle speed variation on HSL line is evaluated by TPS analysis considering the tractive effort of HEMU 430-X, tested running resistance and alignment of Honam HSR. And the track forces are evaluated by centrifugal force and impact factor on curved track.

Evaluation of Curving Performance and Running Safety of New High-Power Electric Locomotive (신형 고출력 전기기관차의 곡선추종성 및 주행안전성 평가)

  • Ham, Young Sam
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.6
    • /
    • pp.827-832
    • /
    • 2013
  • In this study, curve responsiveness was assessed based on the lateral force and running safety was evaluated based on the wheel unloading ratio and derailment coefficient, which is the ratio of the wheel load and the lateral force. The evaluation of the curving performance and running safety of the new high-power electric locomotive showed that the derailment coefficient appeared higher when the wheel-set was set to the front of the train instead of being placed backward, and the maximum value of the derailment coefficient was recorded as 0.572 on the Gyeongbu line. Furthermore, the lateral force increased in curved sections, and it appeared to be proportional to the curve radius. Meanwhile, a maximum axis lateral force of 77.6 kN was recorded on the Taebaek line, and the wheel unloading ratio was 47.6% on the Yeongdong line. Finally, the running safety at the maximum speed as well as the through-curve performance of the curve radius satisfied the required standards.

Expanding Plan Study of KRTCS-2(Korean Radio Train Control System for Conventional & High Speed Railway) (일반 및 고속철도용 한국형열차제어시스템 확대적용 방안 연구)

  • Lee, Kang-Gyoo;Choi, Jong-gwoan;Sung, Dong-Il;Yun, Hak-Sun;Park, Jong-Won;Kim, You-Ho;Lee, Nam-Hyoung;Yoo, Jong-Cheon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.533-539
    • /
    • 2017
  • ERTMS/ETCS Level 2 is currently planning, making contract, constructing and operating at several lines in European well-developed railway countries different from past ten years ago, and applying extensively for purpose of its intercompatibility and operational efficiency, and economic feasibility. On the other hand, ATP system correspond to ETCS Level 1, which was domestically introduced in early 2000, has introduced, operated, and planned or constructed in national railwaynetwork, but the lines, which its improvement period is come, are being occurred starting Gyeongbu Line. Therefore, we study the consideration and construction plan by stages if LTE-R Korean Radio-based Train Control System for conventional & high-speed railway under domestic development is extensively applied as the third National Railway Network Construction Plan was announced.

The study on the operation of fire fighting vehicle for a long railway tunnel (장대터널용 소방차량의 운용에 관한 연구)

  • Kwon, Tae-Soon;Park, Won-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.516-521
    • /
    • 2016
  • In this study, we investigated the operation of railroad fire fighting vehicles against fires on trains in a long railway tunnel. In recent years, long railway tunnels (more than 10 km in length) have been built and the number of such tunnels, such as the Geumjeong tunnel (20.3 km in length) on the Gyeongbu high speed line, Solan tunnel (16.7 km in length) on the Yeongdong line and Yulhyeon tunnel (50.3 km in length) on the Suseo high speed line which is scheduled to be opened in the second half of 2016, is increasing. Significant damage is to be expected, due to the increased evacuation time and limited accessibility of fire services when the train is stopped by an urgent fire in the tunnel. Special fire fighting vehicles capable of running on rails have been developed and operated in overseas advanced countries. Therefore, a fire-response system using Unimog vehicles, which can run on road and rail, instead of road vehicles, is necessary. The characteristics of the railway tunnel and thermal environmental change caused by a train fire in a tunnel were analyzed in this study. Also, the operational requirements of the railroad fire fighting vehicles were evaluated by taking into account the specifications of the railroad fire fighting vehicles under development.