• Title/Summary/Keyword: Guideline of Construction Cost

Search Result 66, Processing Time 0.022 seconds

A Study on the Guideline of construction cost according to Size of position and Regional characteristics of New Public Libraries (신축 공공도서관의 지위적 역할에 따른 규모와 지역 특성에 따른 건립공사비 기준에 관한 연구)

  • Lee, Chul-Jae;Yun, Ji-Won;Lee, Min
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.3
    • /
    • pp.113-120
    • /
    • 2017
  • As the functions and roles of public libraries expand, it is time for qualitative growth. In order to improve the quality of public libraries, it is important to plan actual construction costs through systematic feasibility study. Therefore, the purpose of this study is to present the guideline of construction costs considering the size and regional characteristics according to the status role of the new public libraries. The construction costs are based on actual data. The results of the study are as follows. First, we derived the analysis framework according to the size and regional characteristics. The status role of the public libraries was considered theoretically. The size was classified according to status role of the public libraries. Regional characteristics were classified through literature review. Through this, an analysis framework was derived according to size and region. Second, the actual data on construction costs of the new public libraries were examined and analyzed. Basic factors, size, area, and construction costs were analyzed for 285 libraries nationwide that opened from 2010 to 2016. The data of 129 newly opened public libraries were classified. To present construction costs depending on price fluctuation, construction cost index was analyzed as of September 2016. Third, a guideline of construction costs for new public libraries was suggested. The construction cost per $1m^2$ of building area was analyzed. By multiplying 116.70(p), the construction cost index, the construction cost per $1m^2$ of total building area was calculated to be 2,472,350 won. When applying the research result, construction costs can be gained by adding construction cost index of the month.

Improved Estimating Guideline for Quality Management Cost (건설공사 품질관리비 신출기준 개선방안)

  • Kim Kyoon-Tai;Ahn Bang-Ryul;Park Hyeong-Geun;Kim Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.75-83
    • /
    • 2002
  • Korea government established a domestic quality management system under the Law for Construction Technology Management, which was revised in 1997. This Law prescribes that the owner has to assign quality management cost into the construction project budget However, there are some conflicts among internal regulations and prescriptions on the scope of quality management engineer's roles was not specific. In order to overcome these limitations, this research identifies proper scope of quality management engineer's roles and suggests an approach for an improved estimating guideline for construction quality management cost.

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

A Study on the Classification of Standard of Cost Estimation in Construction New Excellent Technology (건설신기술품셈 유형분류에 관한 연구)

  • Ahn, Bnag Ryul;Tae, Yong Ho;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.249-251
    • /
    • 2013
  • The government has applied the Construction New Excellent Technology Endorsement System to enhance national competitiveness and advance domestic construction technology since 1989. Nevertheless, It's application hasn't been expanded to overall construction industry, due to insufficient verification of the cost effectiveness. So, the government has established the standardized cost estimation guideline to verify the cost effectiveness in 2011. This research classified the technology group based on 27 cases of the cost estimation reports to increase understanding of the cost effectiveness of the new excellent technology. It is expected to contribute establishing reasonable and feasible cost estimation standards.

  • PDF

A Study on the Estimation of the Proper Rates of Safety Management Cost in the Construction Technology Promotion Law for Reasonable Construction Safety Management (합리적인 건설안전 관리를 위한 건설기술진흥법상 안전관리비의 적정요율 산정에 관한 연구)

  • Yoon, Young Geun;Oh, Tae Keun;Lee, Myeong-Gu;Seong, Joo Hyun;Jung, Min Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.84-91
    • /
    • 2018
  • Despite the government 's efforts to reduce constructional disasters, it has been pointed out that the safety management cost of the Construction Technology Promotion Act does not reflect the actual site. Therefore, it is necessary to study the proper guideline of the safety management cost which can be used as the most fundamental measure to prevent construction accidents. Moreover for the securement of the reasonable safety management costs, it is important to calculate its appropriate rate. Thus, in this study, the appropriate rate of safety management cost was proposed by the construction cost & type based on the 111 execution plans of safety management cost, and the rate is analyzed to be 1/10 of the occupational safety and health management cost. The results of this study will be a guideline in improvement to the proper schedule rating system improvement and in implement of pilot projects.

A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses (공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구)

  • Lee, Hae-Chan;Kim, Jin-Man;Lee, Dong-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

A Study of cost data modeling for Megaproject (메가프로젝트 원가 자료 분석에 관한 연구)

  • Ji, Seong-Min;Cho, Jae-Kyung;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.253-256
    • /
    • 2009
  • To the success of the megaproject including various and complex facilities, it is needed to establish a database system. Developments in data collection, storage and extracting technology have enabled iPMIS to manage various and complex information about cost and time. Especially, when we consider that both the go and no go decision in feasibility, Cost is an important and clear criteria in megaproject. Thus, Cost data modeling is the basis of the system and is necessary process. This research is focus on the structure and definition about CBS data which is collected from sites. We used four tools which are Function Analysis in VE, Casual loop Diagram in System Dynamics, Decision Tree in Data-mining, and Normalization in SQL to identify its cause and effect relationship on CBS data. Cost data modeling provide iPMIS with helpful guideline.

  • PDF

Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication (복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출)

  • Lee, Dongmin;Jang, Sejun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

A Study on the Developing of the Life Cycle Cost Analysis System for Buildings (건축물의 Life Cycle Cost 분석 시스템 개발에 관한 연구)

  • Ji Sang-Jun;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2001
  • Recently, the government recommend the use of LCC analysis at a feasibility phase by comprehensive countermeasures for efficient public construction projects and comprehensive countermeasures against preventing unconscientious construction. From the end of 1980's, studies of LCC is in progress actively However, it is difficult to put to practical use for lack of a process, a detailed guideline and existing data about LCC analysis. This study proposes a analysis methodology and a cost model can estimate life cycle cost for Buildings. Furthermore, it develops algorithms for computerizing which is able to estimate efficient LCC assessment.

  • PDF

The Guideline structure for improving sustainability in building construction projects (건축 프로젝트의 친환경성 제고를 위한 사업관리 가이드라인 구성 체계 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.26-27
    • /
    • 2014
  • Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.

  • PDF