• 제목/요약/키워드: Guaranteed Maximum Price

검색결과 8건 처리시간 0.024초

A Framework for Guaranteed Maximum Price and Contingency Development for Integrated Delivery of Transportation Projects

  • Gransberg, Douglas D.;Shane, Jennifer S.;Ahn, Jun-Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.1-10
    • /
    • 2011
  • This paper discusses the components of a guaranteed maximum price (GMP) and proposes a framework for the development of GMPs as contract payment provisions for construction manager-at-risk (CMR) and design-build (DB) contracts for transportation projects. The framework is the synthesis of a comprehensive literature review, a content analysis of CMR and DB solicitation documents and contracts, and case study project output from twelve projects in nine states worth $3.1 billion. The research also discusses the development of three common types of contingencies that are often utilized in projects with GMPs. The study concludes that owners should specify the structure of the GMP and its components to enhance clarity and understanding of the GMP's composition. It recommends that this structure be included in the CMR and DB solicitation documents so that pricing proposals can be formulated in a manner that is consistent with the contract payment provisions that will be useful to practitioners that need to implement GMP-based contracts.

농업공간조직에서 시장의 영향 (The Influence of Market in Agricultural Spatial Organization)

  • 이상율
    • 한국지역지리학회지
    • /
    • 제3권2호
    • /
    • pp.151-162
    • /
    • 1997
  • 본 연구는 전통적인 농업입지론에 기초한 생산지향 모델에서 시장원리를 고려하여 토지이용에서 변화와 농작물 가격의 변화를 고찰하기 위한 이론 연구이다. 본 연구에서 제시된 균형모델은 생산비용, 운송률, 수요의 측면에서 생산지향모델과 비교된다. 시장(도시)의 규모가 농업토지이용에 미치는 영향을 시나리오를 통해 분석하였다. 또한 제시된 균형모델이 농업에서 불확실성이란 요소를 그 모델에서 어떻게 수용하는가를 제시하였다.

  • PDF

A STUDY ON CONSTRUCTION CONTRACTS AND PAYMENT METHODS IN CM AT RISK SYSTEM -APPROACH WITH ESTABLISHING CONTEXT OF GMP-CM SYSTEM -

  • JeaSauk Lee;JaeYoul Chun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1002-1006
    • /
    • 2005
  • When we compare CM system with Design Bid Build system, we can see two striking features in CM system. First, CMr participates in construction team along with Owner, Designer and Constructor. The newcomer can change boundaries of function and responsibility. Second, Compatibility through each phase and Objectivity of decision-making become more important, because relation among stakeholders changes from a rectilinear to a network. However, it is not clear how the risk of completion is reasonably treated. So we have to think about the relations between Owner and CMr, CMr and Specialist Contractor from a point of trade risk. This paper covers them.

  • PDF

책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 - (CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA -)

  • 정진학;한종훈;이주성;안용한
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.22-30
    • /
    • 2019
  • 최근 건설 사업이 복잡해지고 대형화 되며 발주자의 요구사항 또한 다양해지고 있다. 그에 따라 책임형 CM 발주방식이 대두되었지만 국내 책임형 CM 프로젝트 수행사례는 민간 부분에서만 몇 차례 진행되었고 국내의 건설사의 프로젝트 경험 및 자료도 부족한 실정이다. 또한 건설 프로젝트는 다수의 프로젝트 주체들이 가시화 되지 않은 결과물에 대한 목적, 기간, 비용, 각 당사자의 권리와 책임, 이익 등을 합의하여 계약으로 명문화 하는 특성을 갖기 때문에 계약서의 작성 및 관리는 계약의 목적물인 프로젝트의 성공적 수행과 매우 밀접한 관계가 있다. 따라서 본 연구에서는 책임형 CM 발주방식이 보편화 되어있는 미국의 사례 중 GMP 계약 방식으로 수행된 프로젝트의 계약서에 대해 고찰하여 GMP 구성요소 및 프로세스에 대한 공통 요소를 도출하고 국내 책임형 CM 프로젝트 수행 시 이용 될 수 있는 기초자료를 제안 하였다. 본 연구에서 도출해 낸 GMP구성 요소 및 프로세스는 국내 시범사업이 완료된 이후에 국내와 해외 사례를 비교 분석하여 국내에 효과적인 적용 법에 대한 추후 연구가 진행 될 수 있을 거라 판단된다. 또한 건축물 종류별 GMP 요소를 비교하여 건물 종류별 적합한 적용 법에 대한 연구도 진행 될 수 있을 것이라 사료된다.

BIM기반 확률론적 GMP 산정방안에 관한 연구 (Probabilistic GMP Calculation Method based on BIM)

  • 고건호;김정훈;김현주;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스 (GMP Calculation Process in CM at Risk for Public Construction Project)

  • 김건성;김정훈;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안 (Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk)

  • 현창택;고건호;김정훈
    • 한국건축시공학회지
    • /
    • 제18권3호
    • /
    • pp.295-303
    • /
    • 2018
  • 현재 DBB 발주방식에서는 설계단계와 시공단계가 분리되어 있어, 잦은 설계변경이 발생하고 있다. 아울러 공사비초과, 공기지연 및 품질저하를 야기하는 문제점들을 초래하고 있다. 최근에 발주자의 다양한 요구, 제한적인 예산 및 공기 등의 제약조건에 대응할 수 있는 발주방식인 CM@R 발주방식이 대두되고 있다. CM@R 발주방식에서는 설계단계에서 발주자와 협의하여 GMP를 정하고, GMP 내에서 CM수행자가 책임을 지고 공사를 수행하는 방식이다. 그러나 CM@R 특성상 완성되지 않은 도서를 기준으로 GMP를 산정하기 때문에 불확실성이 내재되어 있다. 본 연구에서는 GMP 산정시 불확실성을 고려하기 위하여, CBR를 이용한 공사비 예측 및 MCS를 적용한 확률론적 초기 GMP 산정방안을 제시하였으며, 초기 GMP 산정 이후 사업진행에 따라 GMP 협의를 수행할 수 있는 프로세스를 제시하였다. 사례연구 및 검증을 통하여 확률론적 초기 GMP 산정방안을 검증하였다. 본 연구에서는 제시된 확률론적 GMP 산정방안을 통하여 GMP의 범위를 설정하고 발주자와 CM수행자가 협의을 통해 리스크를 줄임으로써, CM@R의 성공적인 국내 도입에 일조하고자 하였다.

책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구 (Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness)

  • 이창재;이상효;안용한
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제21권3호
    • /
    • pp.9-18
    • /
    • 2017
  • 책임형 CM(CM at Risk)은 CM회사가 최대공사비보증을 통해 프로젝트를 제공하는 프로젝트 발주 방식 중 하나이다. 종합건설업체는 리스크를 줄이고 프로젝트의 성과를 향상시키기 위해 초기 설계 단계부터 시공단계까지 책임형 CM을 적용할 수 있다. 책임형 CM의 주요 장점 중 하나는 종합건설업체가 견적, 도면 및 시방서 검토, 시공성 검토, 가치공학, 친환경, BIM 등을 포함하는 포괄적인 시공이전단계의 서비스를 제공한다는 것이다. 그러나 국내에서는 책임형 CM 프로젝트가 거의 수행되지 않아 경험이 부족한 국내 종합건설업체는 현재 한정적인 시공이전단계 서비스만을 제공하고 있다. 본 연구에서는 해외 선진 종합건설업체는 프로젝트에서 책임형 CM을 어떻게 활용하고 있는지, 특히 시공이전단계 프로세스와 그에 대한 목적, 성공적인 수행을 위한 각 참여자들의 역할과 책임에 대해 벤치마킹 연구를 통해 중요한 정보를 제공한다. 이를 통해, 건설 사업 경쟁력을 높이기 위해 책임형 CM을 프로젝트에 도입하려는 국내 건설업체들에게 가이드 자료로 활용될 수 있을 것이다.