• Title/Summary/Keyword: Group Project Management

Search Result 385, Processing Time 0.028 seconds

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Changes in Public Hospital Employees' Perceptions Following the Introduction of the New Diagnosis-Related Groups (DRG)-Based Payment System in the Republic of Korea (공공병원 직원들의 신포괄수가제 참여 전후 인식변화)

  • Kim, Hyun Joo;Lee, Jin Yong
    • Quality Improvement in Health Care
    • /
    • v.27 no.2
    • /
    • pp.30-44
    • /
    • 2021
  • Purpose: The aim of this study was to investigate the changes in perception of the New Diagnosis-Related Group (DRG)-based payment system, make overall evaluation after participation, and examine opinions on further policy improvement among employees of a public hospital participating in the pilot project in Korea. Methods: We investigated changes in perception of the New DRG-based payment system before and after participation in the pilot project using a qualitative research method. We conducted individual in-depth interviews with the management and healthcare professionals and Focus Group Interviews (FGIs) with the staff in the nursing and administrative departments. Results: Before implementing the pilot project of the New DRG-based payment system, the management was in favor of participating in the pilot project, whereas the healthcare professionals were strongly opposed to participation in the pilot project, and the staff in the nursing and administrative departments were slightly opposed to participation. After implementing the pilot project, there were remarkable changes in the perception of the New DRG-based payment system among healthcare professionals and the administrative staff. Healthcare professionals' perception was altered in a positive way, while the administrative staff's perception of the system became negative. Conclusion: There were no restrictions on clinical practice or deterioration of quality of care observed in association with the participation in the New DRG-based payment system. However, certain unintended consequences of the New DRG-based payment system may arise as well. Therefore, the government needs to examine the problems identified in this study to reflect on and improve the New DRG-based payment system for stable expansion.

A PLANNING MODEL FOR APARTMENT DEVELOPMENT PROJECT REFLECTING CLIENT REQRUIREMENTS

  • Yoo-Shin Kim;Ye-Keun Oh;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.774-779
    • /
    • 2005
  • Client requirements is a concept with increasing interest in relation to several outcomes of companies, and in particular, in the event of apartment project that takes large share in the domestic construction industry, diverse angle of survey is performed to discover the client requirements and reflect them to the project to improve the quality. For this purpose, it is required to learn the client requirements and apply it in the apartment project, and the QFD (Quality Function Deployment) linked ROQ (Return On Quality) is a technique used in the manufacturing that surveys the client requirements to improve the customer satisfaction, and apply it to the quality improvement program to improve the profitability in this process. In this study, through the application of the ROQ process, the plan to improve the apartment quality management is presented. For this purpose, the consumer interview survey, FGI (focus group interview) survey and the client requirements are analyzed, and thereafter, through the interview with the specialist, the quality improvement program that enables the application to the product development of new apartment product is established. Through this process, the new apartment quality management improvement plan is presented.

  • PDF

The Development of a Project-Based Cyber Learning Community for Teacher Education (교사교육을 위한 프로젝트 기반 가상학습커뮤니티 구축)

  • Jo, Mi-Heon;Lee, Ok-Hwa
    • Journal of The Korean Association of Information Education
    • /
    • v.9 no.2
    • /
    • pp.243-254
    • /
    • 2005
  • Along the information technology progresses, the demand for the educational application increases which derives the need for cyber education. Cyber education should take the knowledge construction model rather than the knowledge delivery model. For the educational paradigm shift by cyber education, 'Project-Based Learning' and 'Cyber Learning Community' need to be adopted. In this study, project-based cyber learning community for teacher education is developed with 5 major categories: Home(community vision, general information, project list, Q&A), project learning center(preparation for the instructional activities, group-based learning activities, presentations), meeting plaza(request for group mentoring, sharing ideas, meeting specialist, survey participating, forum participating, result presentation), references(cases of project studies, materials for project studies, materials for teacher education, general materials), management(project management, project cases, idea bank, finding partners, dialog with instructors, sharing references, sharing experiences, survey, forum).

  • PDF

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

Construction Process & Technologies Applied to Parc.1 Project

  • Hoi-soo, Seo;Jae-min, Baek
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.181-187
    • /
    • 2022
  • POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc

Development of System Requirement Management Database System from User-centered Scenario (사용자 편의를 고려한 시스템 요구사항 관리 데이터베이스 구축)

  • Jin, Moon-Sub;Park, Chan-Young;Choi, Chunho;Chung, Kyung-Ryul
    • Transactions of the KSME C: Technology and Education
    • /
    • v.1 no.2
    • /
    • pp.199-204
    • /
    • 2013
  • In this paper, a new system requirement management tool and its application on the Urban Transit Maglev Project were introduced. In most R&D projects on complexity system such as transportation system, Systems Engineering(SE) activities are included on each project, and SE teams are using commercial computer-based tools to perform the SE activities. Even though SE tools help to manage huge data and documents on engineering efficiently, but well-designed functions of SE tools which support SE activities are not sufficiently used on the whole process of system engineering. In order to computer-based SE tools are to be effectively used on project management, most engineers who takes engineering and coordination roles, at least sub-project managers should be familiar to the tool and could be easily use it, but usability of commercial SE tools are very difficult for normal engineers with no experience on SE activities and SE tools. To overcome this difficulty, we developed a new system requirement management tool considering each user's scenario on using engineering tools. The developed tool could not cover whole SE processes, but designed to perform requirement engineering such as system requirements(SRs) management, specification management, traceability management, SRs' verification activity management and so on. All the entities on SR database are inter-connected by pre-recognized traceabilities, so even non-specialists on SE can easily browse the database and find entities concern, and linked information such as interacted entities, legal or engineering constraints, coordination documents, status of development and verification and so on. Also functions for SR verification tools, TPM(Technical Performance Measure) tools, DB searching tools with traceability, and report generation tools are included on the system.

Risk Critical Point (RCP): A Quantifying Safety-Based Method Developed to Screen Construction Safety Risks

  • Soltanmohammadi, Mehdi;Saberi, Morteza;Yoon, Jin Hee;Soltanmohammadi, Khatereh;Pazhoheshfar, Peiman
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.3
    • /
    • pp.221-235
    • /
    • 2015
  • Risk assessment is an important phase of risk management. It is the stage in which risk is measured thoroughly to achieve effective management. Some factors such as probability and impact of risk have been used in the literature related to construction projects. Because in high-rise projects safety issues are paramount, this study has tried to develop a quantifying technique that takes into account three factors: probability, impact and Safety Performance Index (SPI) where the SPI is defined as the capability of an appropriate response to reduce or limit the effect of an event after its occurrence with regard to safety pertaining to a project. Regarding risk-related literatures which cover an uncertain subject, the proposed method developed in this research is based on a fuzzy logic approach. This approach entails a questionnaire in which the subjectivity and vagueness of responses is dealt with by using triangular fuzzy numbers instead of linguistic terms. This method returns a Risk Critical Point (RCP) on a zoning chart that places risks under categories: critical, critical-probability, critical-impact, and non-critical. The high-rise project in the execution phase has been taken as a case study to confirm the applicability of the proposed method. The monitoring results showed that the RCP method has the inherent ability to be extended to subsequent applications in the phases of risk response and control.

Formulation and Evaluation of Transdermal Patch Containing Sibutramine

  • Subedi, Robhash Kusam;Jang, Jun-Ho;Kim, Jae-Il;Park, Young-Joon;Choi, Hoo-Kyun
    • Journal of Pharmaceutical Investigation
    • /
    • v.40 no.1
    • /
    • pp.33-38
    • /
    • 2010
  • Sibutramine is a serotonin-norepinephrine reuptake inhibitor indicated for the management of obesity in conjunction with a reduced calorie diet. The oral administration of sibutramine is followed by its dose-related side effects. In this study, sibutramine was formulated into drug in adhesive (DIA) patches in an attempt to overcome these problems. The effects of different formulation variables including pressure-sensitive adhesive (PSA), loading amount of drug, thickness of matrix and enhancer on the skin permeation of the drug were evaluated using excised hairless mouse skin. In the acrylic adhesive with carboxyl functional group, low release of sibutramine was observed due to the strong interaction between carboxyl group of adhesive and amine group of sibutramine. The acrylic adhesive without functional group provided good adhesion force and allowed high drug loading. Changing drug load as well as thickness of the matrix was found to alter permeation rate. $Crovol^{(R)}$ PK40 and $Crovol^{(R)}$ A40, were found to be effective enhancers for sibutramine. The optimized patch contained 20% sibutramine, and 5% $Crovol^{(R)}$ A40 as permeation enhancer, in $80\;{\mu}m$ thick Duro-$Tak^{(R)}$ 87-9301 matrix.

Project Selection of Six Sigma Using Group Fuzzy AHP and GRA (그룹 Fuzzy AHP와 GRA를 이용한 식스시그마 프로젝트 선정방안)

  • Yoo, Jung-Sang;Choi, Sung-Woon
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.11
    • /
    • pp.149-159
    • /
    • 2019
  • Six sigma is an innovative management movement which provides improved business process by adapting the paradigm and the trend of market and customers. Suitable selection of six sigma project could highly reduce the costs, improve the quality, and enhance the customer satisfaction. There are existing studies on the selection of Six Sigma projects, but few studies have been conducted to select the correct project under an incomplete information environment. The purpose of this study is to propose the application of integrated MCDM techniques for correct project selection under incomplete information. The project selection process of six sigma involves four steps as follows: 1) determination of project selection criteria 2) calculation of relative importance of team member's competencies 3) assessment with project preference scale 4) finalization of ranking the projects. This study proposes the combination methods by applying group fuzzy Analytical Hierarchy Process (AHP), an easy defuzzified number of Trapezoidal Fuzzy Number (TrFN) and Grey Relational Analysis (GRA). Both of the weight of project selection criteria and the relative importance of team member's competencies can be evaluated by group fuzzy AHP. Project preferences are assessed by easy defuzzified scale of TrFN in case of incomplete information.)