• Title/Summary/Keyword: Ground plan

Search Result 569, Processing Time 0.033 seconds

Boulder Detection Methods and its Compensation for Obstruction in sonft Ground Tunnels by Shielded TBM (연약지반 쉴드 터널 굴착시 전석장애물 탐지방법 및 보상문제)

  • Jee Warren-Wangryul;Ha Sang-Gui
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.110-117
    • /
    • 2006
  • Boulder detection methods and its compensation is discussed with consideration of boulder conditions in soft ground tunneling by shielded TBM. For analysis of proper compensation methods for boulder obstruction, its removal costs and cases on eight projects are presented. Compensation for boulder obstruction removal by volume or weight is not practical for most tunneling situation, but compensation by crew time is probably the most equitable method. If boulders are anticipated on project, boulder removal plan must be considered with proper equipment selection.

Evaluation of Efficiency for Grounding System on the Electrified Railways (전기철도 급전시스템의 매설접지 방식 유용성 평가)

  • 창상훈;한문섭;이장무;이형수;김정훈
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.86-92
    • /
    • 2000
  • Recently, the Korea National Railways (KNR) is undertaking a program of electrification of the existing railway routes. In order to implement the ongoing plan, KNR authorized a preliminary engineering study of its electrical systems. This effort included a comprehensive analysis of new grounding networks. The new grounding system runs in parallel with the rails and is connected to all metal structures such as rails, overhead protection wires and substation grounding grids etc., creating an equipotential ground network. This paper presents a study on coupling levels that can disturb signaling and telecommunications in adoption of the new grounding network The simulation for the study is carried out using Matlab software, Several different scenarios are analyzed, including the load condition and a few fault conditions with different fault locations. The induced potentials on the communication cables are computed. The effect of the buried ground wires is also analyzed by comparing the results with and without the presence of the ground wires, The results presented in the paper can be used as a reference for estimating coupling levels in similar rail systems.

  • PDF

Development of Spatial Information System for Regional Ground Stability Assessment near Dam area (댐 주변지역 광역적 지반 안정성 평가를 위한 공간 정보시스템 개발)

  • 장범수;이사호;최위찬;최재원;오영철
    • Spatial Information Research
    • /
    • v.9 no.1
    • /
    • pp.125-135
    • /
    • 2001
  • Ground failure such as landslide, rock fall land subsidence by heavy rainfall have damaged to people and property. Especially, the damage to important facility such as dam, bridge, tunnel and industrial complex may be possible. Therefore the ground failure must be assessed and counter plan must be prepared. So, the object of this study is to develop the spatial information system for regional ground stability assessment. For this, the topographic, geologic, soil, forest, land use, rainfall frequency map, and satellite image near 40 dams were collected and constructed to the spatial information system. The spatial information system was developed using Avenue in ArcView 3.2 environment and consists of pull down menus and icons. For application of the spatial information system, regional ground stability was assessed in Andong dam. The assessment was ground failure susceptibility and possibility. The spatial information can be used for regional ground stability assessment, prevention and mitigation of hazard, and management of ground as basic data.

  • PDF

Ground Tracking Support Condition Effect on Orbit Determination for Korea Pathfinder Lunar Orbiter (KPLO) in Lunar Orbit

  • Kim, Young-Rok;Song, Young-Joo;Park, Jae-ik;Lee, Donghun;Bae, Jonghee;Hong, SeungBum;Kim, Dae-Kwan;Lee, Sang-Ryool
    • Journal of Astronomy and Space Sciences
    • /
    • v.37 no.4
    • /
    • pp.237-247
    • /
    • 2020
  • The ground tracking support is a critical factor for the navigation performance of spacecraft orbiting around the Moon. Because of the tracking limit of antennas, only a small number of facilities can support lunar missions. Therefore, case studies for various ground tracking support conditions are needed for lunar missions on the stage of preliminary mission analysis. This study analyzes the ground supporting condition effect on orbit determination (OD) of Korea Pathfinder Lunar Orbiter (KPLO) in the lunar orbit. For the assumption of ground support conditions, daily tracking frequency, cut-off angle for low elevation, tracking measurement accuracy, and tracking failure situations were considered. Two antennas of deep space network (DSN) and Korea Deep Space Antenna (KDSA) are utilized for various tracking conditions configuration. For the investigation of the daily tracking frequency effect, three cases (full support, DSN 4 pass/day and KDSA 4 pass/day, and DSN 2 pass/day and KDSA 2 pass/day) are prepared. For the elevation cut-off angle effect, two situations, which are 5 deg and 10 deg, are assumed. Three cases (0%, 30%, and 50% of degradation) were considered for the tracking measurement accuracy effect. Three cases such as no missing, 1-day KDSA missing, and 2-day KDSA missing are assumed for tracking failure effect. For OD, a sequential estimation algorithm was used, and for the OD performance evaluation, position uncertainty, position differences between true and estimated orbits, and orbit overlap precision according to various ground supporting conditions were investigated. Orbit prediction accuracy variations due to ground tracking conditions were also demonstrated. This study provides a guideline for selecting ground tracking support levels and preparing a backup plan for the KPLO lunar mission phase.

Safety Evaluation of the Settlement Amount of the Bridge Earthwork Transition Area Using the Ground Penetrating Radar in the Soft Ground Section (연약지반 구간에서 지표투과레이더 활용한 교량 접속부 침하량 안전 평가)

  • Jung, Gukyoung;Jo, Youngkyun;Kim, Sungrae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.17-22
    • /
    • 2022
  • To reduce the bump of bridge/earthwork transition area caused by the settlement of the soft ground during public use, the road agencies have been continuously overlay or repavement at those areas. In this study, the vehicle-mounted ground penetrating radar with 1GHz air-coupled antenna was used to estimate the settlement amount of those areas for nine bridges built in the soft ground. Results shows that it is possible to effectively measure the thickness of pavement up to a depth of 1 m on an asphalt road with ground penetrating radar technology that can inspect under the road surface. Distinctively deformation of the road surface, the variation in the thickness of the pavement measured at bridge/earth transition areas is equivalent to a minimum of 50 mm and a maximum of 600 mm, and there is a risk of cavity in the ground. The difference in the increased pavement thickness is 50~250 mm for each bridge connection, which may cause the differential settlement. In this study, by using the result of the ground penetration radar, a plan for improving drivability and maintenance of the settlement is suggested and applied to the field.

A Case Study on the Change of Space Organization of School Facilities on the Design Planning Step - By Analyzing on the Plan of Schools by PFI - (설계단계별 학교시설의 공간구성 변화에 관한 사례 연구 - 민간투자사업 대상 학교의 도면 분석을 통하여 -)

  • Sim, Yeong-Ju;Rieu, Ho-Seop
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.53-65
    • /
    • 2007
  • The present research has been conducted on the arranged form, the number and kinds, the area, the location of the rooms and the variation on exterior designs, based on a layout and a ground plan of each step, which are general plan, VE proposal and the final negotiation, for 11 elementary and middle and high schools that are designed in the way of BTL project. In consequence, it has been found out that there are some changes in the number and position of the rooms. However, the changes are not exceeding the overall arrangement form. This could not have led to the original aim, which is to induce creativity by PFI. It can be supposed that it is because the BTL system is stick to the old process, the method of financial investment and it is true to say that there needs to be solution for that.

The plan of rational span decision to track beam of monorail (모노레일 시스템 궤도빔의 합리적인 경간장 결정방안)

  • Ahn, Yong-Mo;Baek, Cha-Seung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.199-205
    • /
    • 2008
  • The monorail system as new transportation system mostly has being constructed as an elevated construction and the track beam as mostly main work type occupy the important parts. The structure of monorail system, the track beam support directly vehicle's load and comprised of the track beam structure to be traveling side and understructure to be transmitted from their load to the ground. In particular, in case of construction to elevated structure in the center of a city, it is important to decision plan for span to be considered the economic, execution and maintenance according to transport, installation, and the structure problem, scene and civil appeals to be decided the beam elevation and span. Therefore the standard span of monorail track beam shall be considered the efficient execution, economic and transportation. And propose to reasonable decision plan incorporated the minimizing the road occupied width due to openness to center of a city and bridge pole, minimize to basis size.

  • PDF

The Study for change plane to apply CBTC(Communication Based Train Control) on the subway (통신을 이용한 열차제어시스템의 기존 도시철도 적용을 위한 절체방안연구)

  • Kim, You-Ho;Lee, Soo-Hwan;Yoo, Jong-Cheon;Lee, Young-Hoon;Baek, Jong-Hyen
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.365-367
    • /
    • 2003
  • In this study, we studied the change plan essentially used for improving the existing railroad signal system. For mixed installation with the existing equipment by introducing new equipment in the city railroad currently operated, it is required to establish a plan depending on the change and to present a plan for change. For the change, since it is necessary to classify ground equipment and onboard equipment and change must be carried out considering performance and functions of each equipment, we classified and studied each equipment for plans of change.

  • PDF

TORANOMON HILLS - Super High-Rise Building on Urban Highway -

  • Hitomi, Yasuyoshi;Takahashi, Hiroshi;Karasaki, Hidenori
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.167-171
    • /
    • 2014
  • TORANOMON HILLS is the main building of a large-scale re-development project located in the center of Tokyo. This high-rise building has a height of 247 m and 52 floors above ground, 5 floors below ground, and $62m{\times}80m$ in plan. It is used as hotel, residential facilities, offices, shops and conference facilities. The super structure is mainly a rigid steel frame with response-control devices, using concrete-filled steel tube columns. The underground section is a mixed structure composed of steel, steel-reinforced concrete and reinforced concrete framings. The piled-raft foundation type is used. The remarkable feature of this high-rise building is that the motorway runs through the basements of the building, which makes it stand just above the motorway. This condition is an important factor of the building design. The plan shape is designed to fit along the curve of the motorway. Special columns at the corners are required to avoid placing columns in the motorway. This special column is a single inclined column in the lower floors that branches into two columns in the mid-floors to suit the column location in the upper floors. The cast steel joint is used for the branching point of each special column to securely transfer the stress.

Establishment of Roadside Tree Planting System in Kangnung (가로수 식재체계 수립)

  • 박용진;김태경
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.5
    • /
    • pp.93-103
    • /
    • 2000
  • This research is to propose a rational criterion of the selection and the management f the roadside trees, and to establish the planting design and system with the objective of improving the roadside environment. All of the roadside trees in each objective courses in Kangnung, and the soil disposition, hardness of the soil in the planting areas have been investigated. Also, we have surveyed the kinds of the trees which kandgnung inhabitants want. The conclusion is as follows Most of roadsides have trees, but they need the introduction of shrubs or ground covering plants according to the locations and the environmental conditions. We have selected nineteen species in regard to the roadside tree criterion and the growing conditions living in Kangnung. It is desirable that we make banding style planting space between each roadside tree to improve the low ratio of green coverage. We have found out that Ligustrum obtusifolium, Buxus micropnylla, Euonymus japonica, Rhododendron schlippenbachii, Phyllostachys nigro and Rosa rugosa, ect. are suitable. In order to soften and weaken the rigidity of the hard substances on a paved roadside, the climbers such as the perennial herbaceous flowering and hedera rhombea should be preferred rather than annual herbaceous flowering because of curtailment of expenditure. To posses a systematical greenery frame in kangnung, we have planned a planting design system that would expand the greenery space every year. Moreover, we have to make a plan to overcome space restrictions. We have established a flexible plan considering the roadside conditions and the improved standard planting methods with an ultimate aim to create a special roadside view.

  • PDF