• Title/Summary/Keyword: Green Time

Search Result 2,584, Processing Time 0.026 seconds

Development of a Signal Optimization Algorithm at Isolated Intersections Using Vehicle Arrival Models (차량의 도착모형을 이용한 독립교차로 신호최적화알고리즘 개발)

  • Woo, Yong-Han
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.4 no.1
    • /
    • pp.41-49
    • /
    • 2001
  • This study developed signal optimization algorithm by analyzing vehicle arrival patterns. The major principle of signal optimization is dissipate all queueing vehicle in 1cycle and assign delay time uniformly for all approaches. For this, this study used optimal green time and surplus green time. Optimal green time calculated by estimated traffic volume from vehicle arrival model. Surplus green time defined as the gap of optimal green time and queue dissipated time. And alternative cycle has minimum surplus green time was selected as the optimal cycle. Finally, total delay and average delay per vehicle can be calculated by using queueing theory.

  • PDF

The effect of mowing height, time lapse, rolling, and dew removal on green speed of putting green in Golf Course (예지고, 시간경과, 롤링과 이슬제거가 골프 코스 퍼팅 그린의 그린 스피드에 미치는 영향)

  • 심경구;이상재;허근영
    • Asian Journal of Turfgrass Science
    • /
    • v.13 no.3
    • /
    • pp.139-146
    • /
    • 1999
  • This studies was carried out to estimate the influence of mowing height, time lapse, rolling, and dew removal on green speed of putting green in Lake Side C. C. on 29, 30 Jun. 1998. The results were as follows. As mowing height increased, green speed tended to be decreased. After mowing, green speed tended to be decreased over the time, and appeared to be decrease significantly on the next day[Y=3.206-0.127.X1-1.41$\times$10-2.X4(Y=green speed, X1=mowing height, X4=time lapse)]. This suggests that the frequency of mowing must be increased to maintain the green speed. But, frequent mowing cause the turfgrass of putting green to be stressed. Rolling tended to increase green speed[Y=3.555-0.202.X1+0.111.X2(Y=green speed, X1=mowing height, X2=rolling)]. Thus, rollers is thought to be an tool used to increase green speed and rolling is expected to be able to decrease turfgrass stress while maintaining the performance level of the putting green. Dew removal appeared to increase green speed significantly[Y=2.499-0.125.X1+0.366.X3(Y=green speed, X1=mowing height, X3=dew removal)]. Thus, dew removal is expected to maintain the green speed in the morning.

  • PDF

EVALUATION OF PEDESTRIAN SIGNAL TIMING AT SIGNALIZED INTERSECTION (신호횡단보도 보행등 녹색신호시간에 관한 연구)

  • 장덕명;박종주
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.1
    • /
    • pp.55-73
    • /
    • 1994
  • The objective of this research is to evaluate the pedestrian signal time involving green and flashing green times. The minimum pedestrian green indication should give time for pedestrian to start crossing safely, and the flashing green indication should give time to complete the crossing. An average pedestrian crossing speed of 1.1(m/s) was estimated by analyzing the field data which was slower than the 1.2(m/s) currently used. Furthermore, the study proposed that design speed for the flashing green time should be slow speed for considerations pedestrian safety, not the average speed. The 0.78-1.01(m/s) of pedestrian speed was estimated at the elementary school areas that indicated 0.2(m/s) slower than the other areas. The pedestrian starting time (perception/reaction time) and time headway from front to back of herd was estimated to determine minimum pedestrian green time. the pedestrian starting time was estimated to determine minimum pedestrian green time. The pedestrian starting time was ranged 2.52-4.29 seconds. The time interval between the pedestrian rows was found to be 1.25-1.86 seconds, which declines as the pedestrian rows increases, The equation to calculate the pedestrian signal, which declines as the pedestrian rows increases. The equation to calculate the pedestrian signal time is proposed using the pedestrian starting time, the time interval between the pedestrian rows, and pedestrian crossing speed given area types (commercial, business, mixed, and elementary school areas), number of both-directional pedestrians for a cycle, crosswalk length and width.

  • PDF

Forecasting of Real Time Traffic Situation (실시간 교통상황 예보)

  • 홍유식;박종국
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.10 no.4
    • /
    • pp.330-337
    • /
    • 2000
  • This paper proposes a new concept of coordinating green this which controls 10 traffic intersection systems. For instance, if we have a baseballs game at 8 pm today, traffic volume toward the baseball game at 8 pm today, traffic volume toward the baseball game will be incr eased 1 hour or 1 hour 30 minutes before the baseball game. at that time we can not pred ict optimal green time Even though there have smart elctrosensitive traffic light system. Therefore, in this paper to improve average vehicle speed and reduce average vehicle waiting time, we created optimal green time using fuzzy rules and neural network. Computer simulation results proved reducing average vehicle waiting time proposed coordinating green time better than electro-sensitive traffic light system. Therefore, in this paper to improvevehicle speed and reduce average vehicle waiting time, we created optiual green time fuzzy rules and neural network. Computer simulation results proved reducing average vehicle waiting time which proposed coordinating green time better than electro-sensitive traffic light system dosen't consider coordinating green time.

  • PDF

Effects of Cooking Time and HTST Air Dehydration Time on Physical Propertiesof Driet Green Peas

  • 김명환
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.19 no.3
    • /
    • pp.195-200
    • /
    • 1990
  • Effects of cooking time(5-30 min in a pressure cooker) and HTST air dehydratiion time(0-9min at 15$0^{\circ}C$) on physical properties of dried green peas(3% oisture content wet basis) were investigated by determining rehydration ratio rehydration curve browning reaction and puncture force, The rehydration ratio and curve of dried green peas were increased with increa-sing cooking time and HTST air dehydration time. Preheating of the green peas for 30 min in a pressure cooker or for 9 min of HTST air dehydration time prior to 6$0^{\circ}C$ air dehydration recovered a 87.3% of original moisture content of raw green peas in a boiling water for 5 min. The brownin greaction was gradually decreased up to 15 min of cooking time. Puncture pressure of rehydrated green peas treated in a boiling water for 5 min was decreased as the cooking time and HTST air dehydration time were increased and was highly correlated with rehydration (r=-0.956) The effects of cooking time and HTST air dehydration time on rehydration ratio browning reaction and puncture pressure were significantly different at the a=0.01 level except effect of HTST air dehydration time on browning reaction.

  • PDF

Optimal Signal Times for Active Bus Signal Priority on Median Bus Lane Using Deterministic Delay Model (중앙버스전용차로상에서 결정적 지체모형을 이용한 능동형 버스우선신호의 최적 신호시간 산출방안)

  • Kim, Tae-Woon;Jeong, Young-Je;Kim, Young-Chan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.13 no.1
    • /
    • pp.15-25
    • /
    • 2014
  • Bus signal priority is a name for various techniques to speed up bus public transport services at intersections with traffic signals. In this study propose methodology to optimize signal times for Early green, Green extension out of the active bus signal priority using deterministic delay model in isolated intersection on median bus lane. Fluctuation is found in the vehicle delay and person delay in the event that using this methodology redistributed to green time and checking slack green time is correct value by sensitivity analysis. As a result of the study, car delay is increased a little and person delay is decreased. As a result of slack green time sensitivity, delay is not much in it if variation of slack green time under 30%. But this methodology effectiveness is under claimed capacity if variation of slack green time over 30%.

Numerical Study of the Radiation Potential of a Ship Using the 3D Time-Domain Forward-Speed Free-Surface Green Function and a Second-Order BEM (3 차원 시간영역 전진속도 자유표면 Green 함수와 2 차 경계요소법을 사용한 선체의 방사포텐셜 수치계산)

  • Hong, Do-Chun;Hong, Sa-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.45 no.3
    • /
    • pp.258-268
    • /
    • 2008
  • The radiation potential of a ship advancing in waves is studied using the 3D time-domain forward-speed free-surface Green function and the Green integral equation. Numerical solutions are obtained by making use of the 2nd order BEM(Boundary Element Method) which make it possible to take account of the line integral along the waterline in a rigorous manner. The 6 degree of freedom motion memory functions of a hemisphere and the Wigley seakeeping model obtained by direct integration of the time-domain 3D potentials over the wetted surface are presented for various Froude numbers.

The Exact Formulation of the Green Integral Equation Applied to the Radiation-Diffraction Problem for a Surface Ship Advancing in Waves (파중 전진하는 선체에 의한 방사파-산란파 문제의 해법에 적용되는 Green 적분방정식의 정확한 도출)

  • 홍도천
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.04a
    • /
    • pp.23-28
    • /
    • 2000
  • The Green integral equation for the calculation of the forward-speed time-harmonic radiation-diffraction potentials IS derived. The forward-speed Green function presented by Brard is used and the correct free surface boundary condition for the Green function is imposed. The cause of the mistakes in the existing Green integral equation is also pointed out.

  • PDF

Forcasting of Real Time Traffic Situation (실시간 교통상황 예보)

  • 홍유식;진현수;최명복;박종국
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2000.05a
    • /
    • pp.292-297
    • /
    • 2000
  • This paper proposes a new concept of coordinating green time which controls 10 traffic intersection systems. For instance, if we have a baseball game at 8 pm today, traffic volume toward the baseball game at 8 pm today, traffic volume toward the baseball game will be increased 1 hour or 1 hour and 30 minutes before the baseball game. At that time we can not predict optimal green time Even though there have smart elctro-sensitive traffic light system. Therefore, in this paper to improve average vehicle speed and reduce average vehicle waiting time, we created optimal green time using fuzzy rules and neural network. Computer simulation results proved reducing average vehicle waiting time which proposed coordinating green time better than electro-sensitive traffic light system dosen't consider coordinating green time.

  • PDF

Evaluation of Noise Decreasing Effects by Structures in Roadside Buffer Green (도로변 완충녹지 구조에 따른 소음저감효과 평가)

  • Kim, Jeong-Ho;Oh, Deuk-Kyun;Yoon, Yong-Han
    • Journal of Environmental Science International
    • /
    • v.24 no.5
    • /
    • pp.647-655
    • /
    • 2015
  • In this study, to targeting Songpa of Seoul, were analyzed the effect on the noise mitigation in roadside buffer green spaces. Noise of Songpa Street buffer green space was determined to be higher during the day than at night. In addition, it was most of 60 db or more. However, the noise reduction function of the buffer green was not greatly affected by time. In the case of noise reduction rate, during the day time it was the order of the mounding type (18.14%)> plain type (5.73%)> slope type (4.08%), And, in the case of night time, it was the order of the mounding type (11.29%)> slope type (10.22%)> plain type (4.42%). Noise reduction rate, all of the daytime, was the highest in the mounding type. As a result of the factors on the amount of reduction of noise, More physical structure is mounding type, green structure is the stratification of green space, and the number of individuals is large, the higher the tree planting density, it is determined that the noise reduction effect is high. Also, factors affecting the noise reduction effect of the day and night were different.