• 제목/요약/키워드: Geotechnical information

검색결과 500건 처리시간 0.023초

기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례 (A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box)

  • 이정희;노원석;정순익;김완종
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

터널시공 중 붕락발생 원인과 최신 보강기술 (Major causes of failure and recent measurements of tunnel construction)

  • 박봉기;황제돈;박치면;김상수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.140-153
    • /
    • 2005
  • During the tunnel construction the major failure mode can be categorized as: tunnel failure just after the tunnel excavation without support, failure after application of shotcrete and finally failure after setting the concrete lining. The failure mode just after the tunnel excavation without support, can be further classified as : bench failure, crown failure, face failure, full face failure, failure due to weak strata and failure due to overburden. Moreover the failure after application of shotcrete is classified as heading face failure, settlement of shotcrete support, local failure of shotcrete lining and invert shotcrete. To find out the major causes of tunnel collapse, the investigation was done in case of the second phase of Seoul subway construction. The investigation results depicted that the major causes of tunnel collapse were due to the weak layer of rock/fault and sudden influx of ground water from the tunnel crown. While the investigation results of the mountain road tunnels construction have shown that the major causes of tunnel failure were inadequate analysis of tunnel face mapping results, intersection of faults and limestone cavities. In this paper some recent measurement in order to mitigate such tunnel collapse are presented

  • PDF

결정론적 모형을 이용한 산사태 위험지 예측 (Prediction of Potential Landslide Sites Using Deterministic model)

  • 차경섭;장병욱;이행우;노수각
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.655-662
    • /
    • 2005
  • The objective of this thesis is to develop a prediction system of potential landslide sites to apply to the prevention of landslide disaster which occurred during the heavy rainfall in the rainy season. The system was developed by combining a modified slope stability analysis model and a hydrological model. The modified slope stability analysis model, which was improved from 1-D infinite slope stability analysis model, has been taken into consideration of the flexion of the hill slopes. To evaluate its applicability to the prediction of landslides, the data of actual landslides were plotted on the predicted areas on the GIS map. The matching rate of this model to the actual data was 92.4%. And the relations between wetness index and landform factors and potential landslide were analyzed.

  • PDF

터널발파시 천공상태 평가를 통한 여굴 저감방안 연구 (A Study on Overbreak Control Methods by Evaluating Drilling Conditions in Tunnel Blasting)

  • 김양균;김인호;유정훈;김성민
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.198-209
    • /
    • 2005
  • Overbreak or underbreak is one of the most important factors in evaluation the results of a tunnel blasting. Overbreak, which depends on the quality of rock, the type and quantity of explosives, and the method and condition of drilling, has been a target of challenge to many blasting engineers as it is connected with economic directly. Drilling is generally known as a primary one of overbreak producing factors. So, This study presented the practical solution to reduce overbreak, which was caused by drilling, through the analyses of how to make a drilling process accurate and how to evaluate the effect of each drilling method. Thus, this solution would give a quantitative analysis of overbreak and provide the information of how to reduce the quantity of overbreak. Moreover, for verifying this solution, we applied it to a tunnel project and then have found out that the quantity of overbreak decreased to approximately 10-40% compared with the previous way of overbreak control.

  • PDF

준설매립된 연약지반의 압밀도 산정에 관한 연구 (The Study of Evaluating The Degree of Consolidation of The Dredged and Reclaimed Soft Ground)

  • 김승렬;정헌철;박치면;신경하;정기문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.469-478
    • /
    • 2005
  • Understanding of an accurate state of consolidation of underconsolidated clay body, like a recently dredged or reclaimed clay deposits, is one of the most difficult tasks. The estimation of the consolidation status of these clay bodies is often made by laboratory tests of numerical analyses. However these methods demonstrated crucial limitations in the accurate prediction. Therefore, the predicted degree of consolidation from various techniques is verified by actual measured field data. The degree of consolidation of clay body in the East Side Hinterland of Gwangyang Port(2nd Phase) is evaluated in this study by using various techniques such as oedometer test, CPTu, numerical analysis and piezometer tests etc. And the results are compared each other to find the most reliable prediction technique. The merit and reliability of each method is discussed in detail. It is revealed from in this study that the estimation of degree of consolidation by an actual pore water pressure measurements is the most reliable technique.

  • PDF

24 January 2020 Sivrice (Elazığ) earthquake damages and determination of earthquake parameters in the region

  • Isik, Ercan;Aydin, Mehmet Cihan;Buyuksarac, Aydin
    • Earthquakes and Structures
    • /
    • 제19권2호
    • /
    • pp.145-156
    • /
    • 2020
  • The 24 January 2020 (Mw=6.8) earthquake with epicentre in Elazığ (Sivrice) on the East Anatolian Fault Zone caused loss of life and property. The information was given about the seismotectonic setting and regional seismicity along this fault zone and aftershock activity and ground motion data of this earthquake. Earthquake parameters were obtained for five different earthquake stations which were closer to the epicentre. Horizontal and vertical design spectra were obtained for the geographic locations for each earthquake station. The obtained spectra for the earthquake epicentre were compared with selected appropriate attenuation relationships. The damages after earthquake were evaluated via geotechnical and structural aspects. This study also aims to investigate the cause-effect relationships between structural damage in reinforced-concrete and masonry structures, respectively. The lack of engineering services was effective on the amount of damage in masonry structures. Insufficient reinforcement and concrete strength, dimensions and inadequate detailing increased the amount of damage in reinforced-concrete structures. Importance should be given to negative parameters that may weaken the defence mechanisms of structures for earthquake-resistant structural design.

포천지역 지하수기초조사 산학연공동 탐사 사례연구(II): 탄성파탐사기술 (Industry-University-Research Collaborative Geoscientific Study in Pocheon area for Groundwater Survey, Part II: Seismic Technology)

  • 이두성;유영준;유영철
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2005년도 공동학술대회 논문집
    • /
    • pp.123-127
    • /
    • 2005
  • 지하수조사를 목적으로 수행한 일련의 지구과학적인 연구의 일부로 수행한 탄성파 굴절법 탐사와 공대공 탐사 결과는 다음과 같은 사실을 제시하였다. 1) 매질의 탄성파 속도는 표토층 (<4m)에서는 250 m/s, 충적층 (>4 <17m)은 2,500 m/s, 암반은 3,500 m/s 이상이다. 2) 암반까지 심도는 탄성파 탐사와 검층 결과는 대략 17 m 정도 인데 시추 코아에 의하면 25m 이하에서 암반이 나타난다.

  • PDF

교대하부 도로확장에 적용된 쏘일네일 벽체의 해석 (Analysis of Soil Bailed Wall under Piled Bridge Abutment)

  • 임유진
    • 공학논문집
    • /
    • 제6권1호
    • /
    • pp.83-96
    • /
    • 2004
  • 강판파일로 지지되고 있는 미니 교대하부에, 압성토의 제거에 따른 교대의 안정성을 확보하기 위한 방법으로서 쏘일네일링 공법을 채택하였다. 네일벽체에 각종 계측기를 매설하여 벽체의 거동을 추적하였다. 또한 3차원 유한요소해석기법을 이용하여 쏘일네일 벽체와 기존 구조물사이의 상호영향과 관련된 벽체의 거동을 분석하였다. 압성토의 순차적 제거와 네일타설 등의 전 축조 시퀀스를 모델링 할 수 있는 기법을 개발하였으며 개발된 시뮬레이션 기법의 타당성을 검증하기 위해 현장에 축조된 실물 계측데이터를 이용하여 보정하였고, 압성토의 제거와 네일타설이 기존 파일의 축하중 및 휨모멘트에 미치는 영향과 네일 인장력의 변화와의 상관관계 등, 설계시 고려되어야 할 몇 가지 주요한 사항에 대한 해석결과를 구할 수 있었다.

  • PDF

수압파쇄 현장시험을 통한 국내 지반의 초기응력 분포양상 해석 (Analysis of In-Situ Stress Regime from Hydraulic Fracturing Field Measurements in Korea)

  • 최성웅
    • 산업기술연구
    • /
    • 제28권B호
    • /
    • pp.111-116
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, and it has been developed to a wire-line system at their second generation. The current up-to-date system is more compact and is able to be operated by all-in-one system. With a progress in a hardware system, the software for analyzing in-situ stress regime has also been progressed. The shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

Structural identification and seismic performance of brick chimneys, Tokoname, Japan

  • Aoki, T.;Sabia, D.
    • Structural Engineering and Mechanics
    • /
    • 제21권5호
    • /
    • pp.553-570
    • /
    • 2005
  • Dynamic and static analyses of existing structures are very important to obtain reliable information relating to actual structural properties. For this purpose a series of material test, dynamic test and static collapse test of the existing two brick chimneys, in Tokoname, are carried out. From the material tests, Young's modulus and compressive strength of the brick used for these chimneys are estimated to be 3200 MPa and 7.5 MPa, respectively. The results of static collapse test of the existing two brick chimneys are discussed in this paper and composed with the results from FEA (Finite Element analysis). From the results of dynamic tests, the fundamental frequencies of Howa and Iwata brick chimneys are estimated to be about 2.69 Hz and 2.93 Hz, respectively. Their natural modes are identified by ARMAV (Autoregressive Moving Average Vectors) model. On the basis of the static and dynamic experimental tests, a numerical model has been prepared. According to the European code (Eurocode n. 8: "Design of structures for earthquake resistance") non-linear static (Pushover) analysis of the two chimneys is carried out and they seem to be vulnerable to earthquakes with 0.25 to 0.35 g.