• Title/Summary/Keyword: Generating Cost

검색결과 470건 처리시간 0.032초

Region-based Pattern Generating System for Maskless Photolithography

  • Jin, Young-Hun;Park, Ki-Won;Choi, Jae-Man;Kim, Sang-Jin;An, Chang-Geun;Seo, Man-Seung
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.389-392
    • /
    • 2005
  • In the maskless photolithography based on the Digital Micromirror Device (DMD) by Texas Instruments Inc. (TI), the micromirror array works as a virtual photomask to write patterns directly onto Flat Panel Display (FPD) at high speed with low cost. However, it is neither simple to generate region-based patterns for the micromirror array nor easy to deliver sequences of patterns for the micromirror controller. Moreover, the quality of lithography yields the precise synchronization between generating sequence of patterns and irradiation rate off micromirrors. In this study, the region-based pattern generating system for maskless photolithography is devised. To verify salient features of devised functionalities, the prototype system is implemented and the system is evaluated with actual DMD based photolithography. The results show that proposed pattern generating method is proper and reliable. Moreover, the devised region-based pattern generating system is robust and precise enough to handle any possible user specified mandate and to achieve the quality of photolithography required by FPD manufacturer.

  • PDF

Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구 (A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization)

  • 박우열;안성훈
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

동적계획법을 이용한 발전기의 운전모드 및 최적부하 배분에 관한 연구 (A Study on Optimal Electric Load Distribution and Generator Operating Mode Using Dynamic Programming)

  • H-H Yoo
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제26권3호
    • /
    • pp.313-319
    • /
    • 2002
  • Since the oil crisis in 1970, a great deal of effort has been made to develop automatic electric load sharing systems as a part of the efforts to save energy. A large scale electric generating system composes more than two generators whose characteristics may be different. When such a system is operated individually or in parallel, the lagrange multiplier's method has difficulty in achieving optimal load distribution because generators usually have the limitations of the operating range with inequality constraints. Therefore, a suitable operating mode of generators has to be decided according to the selection of the generators to meet electric power requirements at the minimum cost. In this study, a method which solves the optimal electric load distribution problem using the dynamic programming technique is proposed. This study also shows that the dynamic programming method has an advantage in dealing with the optimal load distribution problem under the limitations of the operating range with inequality constraints including generator operation mode. In this study, generator operating cost curve of second order equation by shop trial test results of diesel generators are used. The results indicate that the proposed method can be applied to the ship's electric generating system.

Simulated Annealing 알고리즘을 이용한 에지추출 (Edge Detection Using Simulated Annealing Algorithm)

  • 박중순;김수겸
    • 동력기계공학회지
    • /
    • 제2권3호
    • /
    • pp.60-67
    • /
    • 1998
  • Edge detection is the first step and very important step in image analysis. We cast edge detection as a problem in cost minimization. This is achieved by the formulation of a cost function that evaluates the quality of edge configurations. The cost function can be used as a basis for comparing the performances of different detectors. This cost function is made of desirable characteristics of edges such as thickness, continuity, length, region dissimilarity. And we use a simulated annealing algorithm for minimum of cost function. Simulated annealing are a class of adaptive search techniques that have been intensively studied in recent years. We present five strategies for generating candidate states. Experimental results(building image and test image) which verify the usefulness of our simulated annealing approach to edge detection are better than other operator.

  • PDF

비보험비용 산정을 위한 Simple System 개발에 관한 연구 (A Study on Development of Simple System for Assessment of Uninsured Cost)

  • 이종빈;이태영;장성록
    • 한국안전학회지
    • /
    • 제26권4호
    • /
    • pp.96-101
    • /
    • 2011
  • In previous studies, a system was developed for classifying items of uninsured cost and for generating factors and formulas by item for calculating accident loss costs. However, the loss cost of stopped production was not considered when the system was being developed. In addition, the system which was developed in previous studies had problems such as input error and data collection, owing to numerous input items. Therefore, this study developed a Revised system which considers the loss cost of stopped production, and a Simple system for improving the problems in input errors and data collection. In this study, unquantifiable factors were not considered. Further study that takes these factors into consideration is necessary.

선로용량한계를 고려한 단기 발전계획 (Short-Term Generation Scheduling Considering Transmission Line Capacity Limits)

  • 김준현;송현선;유인근
    • 대한전기학회논문지
    • /
    • 제35권12호
    • /
    • pp.594-602
    • /
    • 1986
  • This paper proposes an effective algorithm for short-term generation scheduling for the purpose of economic and secure operation of thermal power systems. Especially, in the procedure of solution by Dynamic Programming, Linear Programming is introduced to promote the possibility of optimal solution and the security of power systems, and evaluation of security function is improved by the application of seven step approximation of normal distribution. Several necessary considerations, that is, time dependent start-up and constant down cost of generating units, demand and spinning reserve constraints, minimum up and sown time constraints, the number of possible start-up of a generating unit in a d and the number of generating units which can be started up at the same time at the same bus, are also incoporated to elevate the usability and flexibility of the algorithm. Finally, the effectiveness of the proposed algorithm has been demonstrated by applying to the 6-gen. 21-bus model power system.

  • PDF

함수발전기의 주간운용계열에 관한 연구 (A Study on the Optimal Weakly Operation Planning of Pumped Hydrostorage Plant)

  • 송길영;김영태
    • 대한전기학회논문지
    • /
    • 제34권5호
    • /
    • pp.193-200
    • /
    • 1985
  • Increased attention has been given in recent years to the use of pumped hydrostorage plant to meet the requirements for peak generation and bottom pumping. Once a pumped hydrostorage plant is installed, its economic operation as an integral component of a steam generating system requires the selection of a pumping and generating schedule which will result in the most effective use of the hydro generating capacity. The general object of coordination of pumped hydrostorage plants with electric power system is the minimization of the overall procduction cost and the maximization of generation reserves. This paper presents a method for the optimal scheduling of pumped hydrostorage plant and a computer program which determines weekly operating schedules for a pumped hydrostorage plant by dynamic programming method.

  • PDF

PSO알고리즘에 기초한 발전기 보수정지 (Generating unit Maintenance Scheduling based on PSO Algorithm)

  • 박영수;김진호;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.222-224
    • /
    • 2006
  • This paper addresses a particle swarm optimization-based approach for solving a generating unit maintenance scheduling problem(GMS) with some constraints. We focus on the power system reliability such as reserve ratio better than cost function as the objective function of GMS problem. It is shown that particle swarm optimization-based method is effective in obtaining feasible schedules such as GMS problem related to power system planning and operation. In this paper, we find the optimal solution of the GMS problem within a specific time horizon using particle swarm optimization algorithm. Simple case study with 16-generators system is applicable to the GMS problem. From the result, we can conclude that PSO is enough to look for the optimal solution properly in the generating unit maintenance scheduling problem.

  • PDF