The Journal of Korean Institute of Communications and Information Sciences
/
v.39B
no.2
/
pp.133-141
/
2014
Recently, various services are provided by using WAVE protocol for communication among neighboring vehicles. And in order to operate stable system, the gateway for interconnecting in and out vehicle networks is required. In this paper, we propose gateway interconnecting WAVE and CAN protocol. The proposed gateway based on OSEK OS consists of a communication layer, a message translator layer and a message management layer. In the communication layer, WAVE communication part and CAN communication part are designed to communicate with WAVE and CAN. And in the message management layer, message management layer functions to store the received messages and check errors with the message. Based on these functions, experiment was conducted to analyze performance of the gateway with two scenarios such as transmitting periodically BSM as a message structure for safety services in vehicle-to-vehicle communications and responding to road side equipments requiring in-vehicle information. As a result of test, we verify our gateway performance by analyzing measured time in test scenarios.
In this paper, we analyze the problem with existing telematics contents service systems that have been provided telematics information on a special contents provider. Then, we suggest methods to solve the problems and propose the architecture of TELIC(Telematics Information Center) to implement our methods. We also verify the stability and the accuracy of the suggested architecture through a comparison with an existing service system. With our system, it is possible to develop telematics content application without additional developing the integration method of various contents.
In this paper, we designed and implemented home gateway system for remote control of home appliances and devices using cellular phone. The system communicate home devices through Zigbee protocol and home server based on Linux operating system communicate cellular phone through external networks. We expect that the system apply various fields as home automations, home network, smart offices, and ubiquious environments.
As the power system develops rapidly into a smarter and more flexible state, so must the communication technologies that support it. Machine to machine (M2M) communication in Smart Grid environment has been discussed in European Telecommunications Standards Institute (ETSI). The power system is not easily replaceable, due to system replacement cost. The M2M gateway is required in other to improve interoperability in M2M environment. The Distributed Network Protocol 3.0 (DNP3.0) is the most important standard in the SCADA systems for the power. It has been used for device data collection/control in Substation Systems, Distribution Automation System. If the DNP3.0 data model is combined with a set of contemporary web protocols, it can result in a major shift. We selected Constrained Application Protocol (CoAP) based on RESTful as M2M protocol. It is a specialized web transfer protocol for use with constrained nodes and constrained networks. We have used the OPNET Modeler 17.1 in order to verity the SOAP versus CoAP. In this paper, we propose the CoAP-based M2M Gateway to Distribution Automation system using DNP3.0 in Smart Grid Environment.
As the power grids are integrated into one big umbrella called a "smart grid," communication protocol plays a key role in successful operations. The successful deployment of smart grid interoperability is a major hurdle that must be overcome. The micro grid, a small power system that distributes energy resource, is operated in diverse regions. Different vendors use different communication protocols in the operation of the micro grid. Recently, the IEC 61850 has been legislated to solve the interoperability problems in power utility automation. The present paper presents a micro grid system based on the IEC 61850 protocol. It consists of a micro grid monitoring system, a protocol converter that transforms serial data to IEC 61850 data, and distributed energy resource controllers for diverse DER nodes. A developed communication gateway can be deployed for DER controllers with serial links to exchange data with IEC 61850-based devices. The gateway can be extended to IEC 61850-based distribution automation systems, substation automation systems, or SCADA.
Journal of the Korea Society of Computer and Information
/
v.17
no.3
/
pp.33-40
/
2012
Recently, to enhance the quality and efficiency of health care services, smart health care services utilizing a smart phone and tablet pc are mainly being introduced into the large hospital and the interest for personal health record service which manages personal medical information utilizing PC and smart phone and technology development is actively underway. In order to build a next generation hospital information systems, the interoperability of data between the different hospital information systems and UX consistency between the various user devices must be assured. Therefore, in this paper, medical information standard and the study for improving the performance is conducted to design the gateway system which converting and integrating the medical information under multi-platform environment. In this paper, CCR standard is adapted to the mapping method between the data which is the key feature of the gateway system and design the system utilizing multi-table-based mapping method. To evaluate the performance of the system, experiment was done and the result has been improved approximately 20 percent for response rate.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.43-54
/
2010
As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.
In recent years, the PV plant is gradually increasing in korea and has begun to focus on PV system O&M(Operation and Management). The legacy PV system can hardly be gathering realtime information. That is why it is difficult for the facility to respond immediately to situations in which problems arise. This leads to economic losses due to reduced power generation. In this study, we implemented an RMC(Remote Maintenance Control) gateway that supports multi-area equipment(inverters, junction boxes, switchboards, environmental sensors) that are not limited to specific manufacturers. It provides a function to visualize the collected data. Users can easily check the power generation and operation status of PV system equipment. In the future, we will develop an algorithm capable of analyzing beta factors that cause equipment performance degradation, parts aging, and deterioration using data collected from facilities. We intend to use this algorithm as a fundamental technology for O&M by transplanting it to the RMC gateway.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.59
no.1
/
pp.35-39
/
2010
The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the IEC61850 standards. The IEC61850 communication standards that all power equipment and facility and controllers installed in automation system for power substations must follow has had its Parts 3 and Part 4 established as international standard in January 2002 and Part 10 in May 2005, the last to become international standard. Hence all separate parts of the original IEC61850 standard came to be established as international standards. As a consequence, after 2005, in most power substations around the world the IEC61850 standard is being applied and the prominent makers are geared towards manufacturing products to the IEC61850 standard. The IEC61850 is being recognized as an essential standard that must be applied to not only power substations but for automation of power systems and communication systems. In this research, the Gateway device that connects current SCADA system and IEC61580 based system has been domesticated with Korea‘s own technology and extensive testing was carried out in order to obtain confidence in its performance.
Journal of the Korea Society of Computer and Information
/
v.12
no.2
s.46
/
pp.243-249
/
2007
As today's home-network market grows related researches had been increased and with different interfaces of these products of course there is lack of compatibility between these systems. So we need some extensionable managing system which integrates and manages these systems. In this paper, we designed framework that integrates and manages network system and also implemented Home Gateway using JMX on Sensor-network environment. It may manage each target with modulization and through the connection interface we make allowance compatibility and extensionability between existing systems. Through this researches, we implemented the Home-network integrated managing system which can manage and monitor with PDA or RDP(remote desktop PC).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.