• Title/Summary/Keyword: Gate Review

Search Result 68, Processing Time 0.025 seconds

A Proposal on the Consulting Model for Efficient Construction of Material Handling Automation System : Focused on K Company's Case (물류자동화 시스템의 효율적 구축을 위한 컨설팅 방법론 제안 : K기업의 사례를 중심으로)

  • Ko, J.H.;Cho, J.H.;Oh, H.S.;Shim, S.C.;Ryu, J.H.;Lee, S.J.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.202-211
    • /
    • 2015
  • Companies build the factory automation system to improve management effectiveness and productivity as prime strategies for sustainable growth. But most companies undergo various trials and errors while carrying out the project without elaborate preparation stage for factory automation. In this study, we tried to verify what factors are critical to effectively building distribution automation system, which is a branch of factory automation system. A consulting model for setting up a Material Handling Automation System by utilizing the Stage-Gate Process, which is product development process was studied. 29 material handling automation projects carried out between the year 1990 to 2013 at K-Company were selected. Interviews with the project managers, operators and maintenance personnels, various records and current status of the projects were used as data for structural equations based on the Milan consulting model and existing researches of factory automation, CIM for material handling automation. Creating effective basis of production, material handling system and energy saving system with expert review, when preparing a material handling automation project, help promote the project planning thus contributing to the performance of the resulting system, which appears though rather weakly in our data. Also the effect of material handling automation can be enhanced through sufficient and effective links to the relevant environments such as production logistics management and automated warehouses. More detailed planning characteristics of project promotion or some time-series data of effective Material Handling Automation System could enhace furthur studies. We propose a consulting model for setting up an efficient material handling automation system.

A Study on How Height and Weight Affects Glomerular Filtration Rate (신장과 체중의 변화가 사구체 여과율에 미치는 영향)

  • Park, A Rang;Choi, Jong Sook;Lee, Young Hee;Jung, Woo Young
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.23 no.1
    • /
    • pp.40-44
    • /
    • 2019
  • Purpose Glomerular filtration rate (GFR) is an important index for evaluation of renal function, renal disease diagnosis and progress monitoring. Therefore, accurate measurement of GFR is clinically important. Among the factors that affect the GFR result, there have been many discussions on the methods such as the correction of the kidney depth, net syringe count, and the method of setting the ROI. However there has been no consideration of counting in the most basic factors like height and weight measurement. In this study, we investigate how height and weight changes affects the result of GFR and review the importance of standardized body measurements. Materials and Methods Fifty patients who underwent GFR test were randomly sampled and examined for changes in height and body weight within one month. From the normal patients without renal disease to the patients with severely decreased GFR, we applied the GFR formula of Gate with varying height and weight. Results: The result showed variation of the height at maximum three centimeters and six kilograms of weight. The first calculation of GFR was done with fixed height value and control variable as weight. Weight was incremented by one kilogram each time up to six kilograms. The GFR showed increased result with increasing weight. The result of GFR showed ten percent increase with six kilograms of weight increase. On the other hand, when height value was incremented by one centimeter up to three centimeters showed decreased GFR result with fixed weight value. Up to three centimeters of height increase showed two percent of decreased GFR with fixed weight. Conclusion This study showed varying GFR result when height and weight changes. Therefore it is clinically crucial not only to maintain and manage body measuring instrument but also to have a standardized measurement methods to derive accurate measured values and to achieve reproducibility.

A Study on the Plan for Wide Road's Streetscape by Simulation of Streetscape's Components - As a Sample Wide Area Road in Busan - (도로경관의 구성요소 제어를 통한 광역도로 경관형성에 관한 연구 - 부산시 광역도로사례를 중심으로 -)

  • Kim, Jong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.79-87
    • /
    • 2010
  • The urban street has been escaped from functional and uniformed arrangement for merely movement to the space which can take the role of cozy and familiar culture. Therefore I tried to prepare a plan for the wide roads having streetscape which reveal area's identity as well as coziness and convenience by grasping the problem and its solution through analysing and deducing various elements with the subject of streetscape among urban landscape components, especially composing wide road's streetscape. First of all, this study made a simulation by deducing components of wide road's streetscape and controlling them with theoretical review of streetscape and consideration of wide road's local characteristic. With the evaluation on the base of them, that following four components could be the representative things of entrance part was confirmed by this study. They were familiar streetscape,symbolic scene as as an entrance gate, continuous and dynamic streetscape, and interesting and pleasant streetscape. And for the middle part, those four components could represent the wide road's streetscapeI were confirmed. They were familiar streetscape, safe and tender streetscape, pleasant and dynamic streetscape, and symbolic streetscape. It seems that the components of the streetscape obtained from the analysis of this study are utilized as reference data in the case of a future streetscape design conclusively.

Conservation Status, Construction Type and Stability Considerations for Fortress Wall in Hongjuupseong (Town Wall) of Hongseong, Korea (홍성 홍주읍성 성벽의 보존상태 및 축성유형과 안정성 고찰)

  • Park, Junhyoung;Lee, Chanhee
    • Korean Journal of Heritage: History & Science
    • /
    • v.51 no.3
    • /
    • pp.4-31
    • /
    • 2018
  • It is difficult to ascertain exactly when the Hongjuupseong (Town Wall) was first constructed, due to it had undergone several times of repair and maintenance works since it was piled up newly in 1415, when the first year of the reign of King Munjong (the 5th King of the Joseon Dynasty). Parts of its walls were demolished during the Japanese occupation, leaving the wall as it is today. Hongseong region is also susceptible to historical earthquakes for geological reasons. There have been records of earthquakes, such as the ones in 1978 and 1979 having magnitudes of 5.0 and 4.0, respectively, which left part of the walls collapsed. Again, in 2010, heavy rainfall destroyed another part of the wall. The fortress walls of the Hongjuupseong comprise various rocks, types of facing, building methods, and filling materials, according to sections. Moreover, the remaining wall parts were reused in repair works, and characteristics of each period are reflected vertically in the wall. Therefore, based on the vertical distribution of the walls, the Hongjuupseong was divided into type I, type II, and type III, according to building types. The walls consist mainly of coarse-grained granites, but, clearly different types of rocks were used for varying types of walls. The bottom of the wall shows a mixed variety of rocks and natural and split stones, whereas the center is made up mostly of coarse-grained granites. For repairs, pink feldspar granites was used, but it was different from the rock variety utilized for Suguji and Joyangmun Gate. Deterioration types to the wall can be categorized into bulging, protrusion of stones, missing stones at the basement, separation of framework, fissure and fragmentation, basement instability, and structural deformation. Manually and light-wave measurements were used to check the amount and direction of behavior of the fortress walls. A manual measurement revealed the sections that were undergoing structural deformation. Compared with the result of the light-wave measurement, the two monitoring methods proved correlational. As a result, the two measuring methods can be used complementarily for the long-term conservation and management of the wall. Additionally, the measurement system must be maintained, managed, and improved for the stability of the Hongjuupseong. The measurement of Nammunji indicated continuing changes in behavior due to collapse and rainfall. It can be greatly presumed that accumulated changes over the long period reached the threshold due to concentrated rainfall and subsequent behavioral irregularities, leading to the walls' collapse. Based on the findings, suggestions of the six grades of management from 0 to 5 have been made, to manage the Hongjuupseong more effectively. The applied suggested grade system of 501.9 m (61.10%) was assessed to grade 1, 29.5 m (3.77%) to grade 2, 10.4 m (1.33%) to grade 3, 241.2 m (30.80%) and grade 4. The sections with grade 4 concentrated around the west of Honghwamun Gate and the east of the battlement, which must be monitored regularly in preparation for a potential emergency. The six-staged management grade system is cyclical, where after performing repair and maintenance works through a comprehensive stability review, the section returned to grade 0. It is necessary to monitor thoroughly and evaluate grades on a regular basis.

A Proposal for a Global Market Entry Strategy into the Korean Apparel Industry based on the Italian Fashion Industry - Use of Foreign Exhibitions and Showrooms - (이태리 패션산업을 근거로 본 한국 의류산업 해외진출을 위한 제언 - 박람회 및 쇼룸 활용 -)

  • Kim, Yong-Ju;Lee, Jin-Hee
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.32 no.12
    • /
    • pp.1903-1914
    • /
    • 2008
  • The purpose of this study was to propose an efficient and feasible global market entry strategy for the Korean apparel industry by analyzing the Italian fashion industry. In particular, the study investigated the role of foreign exhibitions and showrooms supported and organized by Italian fashion organizations. The methodology for this study was to analyze industrial reports, review previous studies and conduct in-depth interviews with 23 industry experts in Italy, Korea and LA. The results indicated that the most prominent factor in the Italian fashion industry was the fashion cluster, which is a strong and organic network of diverse fashion related areas No matter the size of the enterprise, firms can get practical, prompt and efficient support from diverse associations. The network operated by the associations provides strong support to each firm by organizing collections and exhibitions, and providing promotional activities. Showrooms and agents are another supportive "gate keeper", directly related to an enterprise's sales. However, Korean fashion firms did not have enough information or knowledge for foreign exhibitions, nor did they make aggressive promotional efforts in the global market. Despite the many fashion-related associations exist in Korea, their programs are too focused on visible accomplishments and are too oriented on "big company" and "big voice", rather than many "small firms". In conclusion, the Korean fashion industry-particularly the fashion industry in Seoul-has strong potential to become the center of the global fashion market in the future. However, the fashion support system that can act as the channel to promote firms and to meet global buyers needs to be supplemented. To feasibly create this system, government or industry associations should develop a strong and generous support system and network, and they must recognize the need for small firms to exist.

A Study on the Composition Principle of the Gyeongbokgung Drainage Facility - Focused on the review of Gyeongbokgung excavation survey - (경복궁(景福宮) 배수시설(排水施設)의 조성원리(造成原理)에 관한 연구 - 경복궁 발굴조사 자료에 대한 검토를 중심으로 -)

  • Kim, Tae Min;Nam, Ho Hyun
    • Korean Journal of Heritage: History & Science
    • /
    • v.51 no.4
    • /
    • pp.120-145
    • /
    • 2018
  • This study intended to examine the drainage facility of Gyeongbokgung Palace based on the traces of the relic found during the excavation survey. Historical records indicate that various efforts have been made for smooth drainage facility for the palace since the foundation of the Joseon Dynasty. Although there are no drawings showing the image of early appearance of Gyeongbokgung Palace during the foundation, it is possible to estimate it through the drawings prepared after the King Yeongjo's reign. The image of the palace after reconstruction can be seen through the "Bukgwoldohyeong" and other relevant documents. At this present, since the survey intends to determine the image of Gyeongbokgung Palace during the reign of King Gojong based on the standard restoration plan of the Cultural Heritage Administration, this study also focused on the drainage facility of Gyeongbokgung Palace during King Gojong's reign, particularly on the collecting wells and culverts of six areas including "Chimjeon Hall", "Taewonjeon Hall", "Geoncheongung Hall", "Sojubang Hall", "Hamhwadang - Jipgyeongdang - Yeonghundang Hall", and "Heungbokjeon Hall". Gyeongbokgung Palace is divided into various zones composed of the central halls and surrounding corridors, and the drains also primarily start from each hall and later join the central drain of the zone. The central drain then leads to the "Eo-gu(御溝)" and the water led to the "Eo-gu" is finally discharged through the water gate. It appears that this series of processes were basically devised to coordinate artificial drain with the natural drain using the natural geographical features of the palace. Research showed that the collecting well where the draining begin was installed in the area where a large amount of household sewage was generated but mostly in the corners where corridors met or corridors and wall met. This appears to be an arrangement to handle the water falling from the roof and household sewage. Also, "Ju(廚)" was installed mainly at the end of the corridor to handle household sewage. The installation of these drainage facilities shows the possibility that the drainage of Gyeongbokgung was very compact under a series of plans.

Reassessment on the Four Major Rivers Restoration Project and the Weirs Management (4대강 살리기사업의 재평가와 보의 운용방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.4
    • /
    • pp.225-236
    • /
    • 2021
  • The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.