Abstract
This study intended to examine the drainage facility of Gyeongbokgung Palace based on the traces of the relic found during the excavation survey. Historical records indicate that various efforts have been made for smooth drainage facility for the palace since the foundation of the Joseon Dynasty. Although there are no drawings showing the image of early appearance of Gyeongbokgung Palace during the foundation, it is possible to estimate it through the drawings prepared after the King Yeongjo's reign. The image of the palace after reconstruction can be seen through the "Bukgwoldohyeong" and other relevant documents. At this present, since the survey intends to determine the image of Gyeongbokgung Palace during the reign of King Gojong based on the standard restoration plan of the Cultural Heritage Administration, this study also focused on the drainage facility of Gyeongbokgung Palace during King Gojong's reign, particularly on the collecting wells and culverts of six areas including "Chimjeon Hall", "Taewonjeon Hall", "Geoncheongung Hall", "Sojubang Hall", "Hamhwadang - Jipgyeongdang - Yeonghundang Hall", and "Heungbokjeon Hall". Gyeongbokgung Palace is divided into various zones composed of the central halls and surrounding corridors, and the drains also primarily start from each hall and later join the central drain of the zone. The central drain then leads to the "Eo-gu(御溝)" and the water led to the "Eo-gu" is finally discharged through the water gate. It appears that this series of processes were basically devised to coordinate artificial drain with the natural drain using the natural geographical features of the palace. Research showed that the collecting well where the draining begin was installed in the area where a large amount of household sewage was generated but mostly in the corners where corridors met or corridors and wall met. This appears to be an arrangement to handle the water falling from the roof and household sewage. Also, "Ju(廚)" was installed mainly at the end of the corridor to handle household sewage. The installation of these drainage facilities shows the possibility that the drainage of Gyeongbokgung was very compact under a series of plans.
본고의 목적은 유구의 발굴조사로 확인된 자료를 활용하여 경복궁의 배수시설을 파악해보는 데 있다. 궁궐의 원활한 배수를 위한 여러 노력은 창건기 경복궁에서부터 지속되었음을 사료를 통해 파악할 수 있다. 창건기 당시 경복궁의 모습을 확인할 수 있는 도형은 남아있지 않지만, 영조대 이후 제작된 도형을 통해 추정해 볼 수 있으며, 중건 이후의 모습은 "경복궁전도", "경복궁도", "북궐도형" 등을 통해 확인할 수 있다. 문화재청이 고종대 중건 경복궁을 복원 기준으로 삼고 있기에, 본고 역시 고종대의 경복궁 배수 시설에 초점을 맞추어 연구를 진행하였다. 이 중 본고에서는 침전, 태원전, 건청궁, 소주방, 함화당 집경당 영훈당, 흥복전 등 여섯 권역의 집수정과 암거를 분석해 보았다. 경복궁은 중심전각과 주변행각으로 구성된 여러 개의 권역으로 구성되는데, 배수 역시 각각의 행각과 전각에서 시작하여 권역별 중심배수로로 합수되는 방식임이 확인되었다. 기본적으로 중심배수로는 개방형 어구로 연결되고 어구로 나온 물은 최종적으로는 수문으로 출수되는 형태가 확인되는데, 이러한 일련의 과정은 경복궁의 구지형을 이용한 자연배수와 인공배수를 조화하기 위한 배치로 보인다. 배수가 시작되는 집수정은 생활하수가 다수 발생하는 지역에 설치되기도 하지만, 대부분은 행각과 행각, 행각과 담장이 접하는 모퉁이에 주로 설치되는 것이 확인 되었다. 이는 지붕의 낙수 처리와 생활하수 처리를 고려한 배치로 판단되며, 특히 생활하수의 처리를 위해 행각이 끝나는 부분에 주로 주(廚)칸을 설치하는 모습도 관찰되었다. 이러한 배수시설의 설치는 경복궁의 배수가 일련의 계획 하에 매우 치밀하게 구성되었을 가능성을 보여준다.