• Title/Summary/Keyword: GPS-RTK survey

Search Result 50, Processing Time 0.026 seconds

Analysis of Network-RTK(VRS) Positioning Accuracy for Surveying Public Control Point (공공기준점 측량에 적용을 위한 VRS(가상기준점) 방식의 Network-RTK 정확도 분석)

  • Han, Joong-Hee;Kwon, Jay-Hyoun;Hong, Chang-Ki
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.2
    • /
    • pp.13-20
    • /
    • 2010
  • Currently, NGII(National Geographic Information Institute) provides VRS(Virtual Reference System) service using 44 CORS(Continuously Operating Reference Stations). Since the VRS provides high-precision coordinate in a short time, the users and applications are expected to be rapidly increasing. The accuracy analysis on the VRS service, however, was not sufficiently performed yet. Therefore, in this study, the VRS data is acquired from various circumstances and its accuracy is analyzed. According to analysis, it was concluded that the VRS could be applied to public control point survey. Furthermore, it was found that the PQ(Position Quality) which represents variance of estimated coordinates rather than GDOP(Geometric Dilution of Precision) is more relevant as a factor to determine the accuracy of coordinates. Based on the analysis of data from four manufacturers (TRIMBLE, MAGELLAN, LECIA, TOPCON), it was confirmed that the standard deviations better than 3cm. Therefore, VRS Survey apply to public control point survey.

Measurements Coastal landfill Using Automatic VRS-GPS Surveying (VRS-GPS 자동측위시스템을 이용한 해안매립지 측량)

  • Nam, Kwang-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5215-5220
    • /
    • 2013
  • Recent construction in the field of 3D aversion is increasing interest in automation. This study is results about survey of the coastal landfill using automatic VRS-GPS surveying system. GPS is made with GRXI and SHC250 controller. Automatic surveying system is composed of DPS module, geomagnetism sensor, bluetooth, gimbals, IMU, etc and enables an automatic driving via entered into a route of position. The developed auto surveying system has installed the front and camera for vertical axis and can grasp situation of surveying with smartphone in real time. The comparative result between surveyed result with repetition method auto VRS-GPS surveying system observed surveyed result with VRS-RTK has shown that average error of x-axis is 0.009m, average error of y-axis, 0.010m and average error of height, 0.002m. This possibility was confirmed that field application.

The Study on Accuracy Improvement of Estuary Riverbed Monitoring (하구하상 모니터링 정밀도 향상에 관한 연구)

  • Park, Un-Yong;Kim, Yong-Bo;Back, Ki-Suk
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.3 s.26
    • /
    • pp.23-34
    • /
    • 2003
  • Currently, the efficiency of GPS has been increased in the various precise survey like as the control survey and the navigation etc. Also, it is widely used in the deformation analysis of the structure, the measurement of the marine tides, the measurement of the river level and the topographic monitoring of seabed or riverbed by combined the measurement equipment for depth. In this study, we intend to increase in efficiency of the topographic monitoring of seabed or riverbed by combined with DGPS, RTK GPS and echo sounder. For this study, we defined the error correction of the echo sounder with the experiment of water tank which is considered the characteristic of estuary riverbed and then we developed the s/w for 3-dimensional monitoring of estuary riverbed and applied the s/w to field test and improved the various problems. On analyzing topography of estuary riverbed by combined GPS with echo sounder, the draught error which is yielded to change of length from the water surface by the movement of survey vessel to the end of the transducer was eliminated by geometrical rearrangement and we defined the correction formula $z=BM+SAH-DBR_{(i)}-DRT-ED$. The sounding error about the echo sounder and characteristic of estuary riverbed was found by understanding the relation of average diameter ind residual error and we defined correction formula, $Y=0.00474{\ast}ln(X)-0.0045$ by the regression analysis. and then we verified applicability of correction formula.

  • PDF

Estuary Riverbed Monitoring using GPS and Echo Sounder (GPS와 Echo Sounder를 이용한 하상 모니터링)

  • Hong Jung-Soo;Lee Yong-Hee;Lee Kee-Boo;Lee Dong-Rak
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.83-88
    • /
    • 2006
  • We intend to increase in efficiency of the topographic monitoring of seabed or riverbed by combined with DGPS, RTK GPS and echo sounder. For this study, we defined the error correction of the echo sounder with the experiment of water tank, which is considered the characteristic of estuary riverbed and then we developed the s/w for 3-dimensional monitoring of estuary riverbed and applied the s/w to field test and improved the various problems. On analyzing topography of estuary riverbed by combined GPS with echo sounder, the draught error which is yielded to change of length from the water surface by the movement of survey vessel to the end of the transducer was eliminated by geometrical rearrangement and we defined the correction formula, z = BM+ SAH- $DBR_{(i)}$ - DRT - ED. The sounding error about the echo sounder and characteristic of estuary riverbed was found by understanding the relation of average diameter and residual error and we defined correction formula, Y= -0.00474*In(X) -0.0045 by the regression analysis. and then we verified applicability of correction formula.

  • PDF

Highly efficient CMP surveying with ground-penetrating radar utilising real-time kinematic GPS (실시간 GPS를 이용한 고효율 GPR CMP 탐사)

  • Onishi Kyosuke;Yokota Toshiyuki;Maekawa Satoshi;Toshioka Tetsuma;Rokugawa Shuichi
    • Geophysics and Geophysical Exploration
    • /
    • v.8 no.1
    • /
    • pp.59-66
    • /
    • 2005
  • The main purpose of this paper is to describe a highly efficient common mid-point (CMP) data acquisition method for ground-penetrating radar (GPR) surveying, which is intended to widen the application of GPR. The most important innovation to increase the efficiency of CMP data acquisition is continuous monitoring of the GPR antenna positions, using a real-time kinematic Global Positioning System (RTK-GPS). Survey time efficiency is improved because the automatic antenna locating system that we propose frees us from the most time-consuming process-deployment of the antenna at specified positions. Numerical experiments predicted that the data density and the CMP fold would be increased by the increased efficiency of data acquisition, which results in improved signal-to-noise ratios in the resulting data. A field experiment confirmed this hypothesis. The proposed method makes GPR surveys using CMP method more practical and popular. Furthermore, the method has the potential to supply detailed groundwater information. This is because we can convert the spatially dense dielectric constant distribution, obtained by using the CMP method we describe, into a dense physical value distribution that is closely related to such groundwater properties as water saturation.

A Preliminary Study of Near Real-time Precision Satellite Orbit Determination (준 실시간 정밀 위성궤도결정을 위한 이론적 고찰)

  • Bae, Tae-Suk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.1
    • /
    • pp.693-700
    • /
    • 2009
  • For real-time precise GPS data processing such as a long baseline network RTK (Real-Time Kinematic) survey, PPP (Precise Point Positioning) and monitoring of ionospheric/tropospheric delays, it is necessary to guarantee accuracy comparable to IGS (International GNSS Service) precise orbit with no latency. As a preliminary study for determining near real-time satellite orbits, the general procedures of satellite orbit determination, especially the dynamic approach, were studied. In addition, the transformation between terrestrial and inertial reference frames was tested to integrate acceleration. The IAU 1976/1980 precession/nutation model showed a consistency of 0.05 mas with IAU 2000A model. Since the IAU 2000A model has a large number of nutation components, it took more time to compute the transformation matrix. The classical method with IAU 2000A model was two times faster than the NRO (non-rotating origin) approach, while there is no practical difference between two transformation matrices.

Evaluation for Applying Low-Cost Mobile Laser System to Earth Volume Calculation at Construction Site (건설현장에서의 토공량산출을 위한 저가형 모바일 레이저시스템의 적용성 평가)

  • Kim, In Seop
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.539-547
    • /
    • 2012
  • Volume survey for earthwork is conducted periodically at every month at large scaled construction sites for request payment for the construction. Currently, the earthwork volume is calculated on the overlapped drawing for two cross sections which were created by new and previous surveying data observed by GPS and TS. However the survey is required lots of time and expenses as it is a pin-point surveying method thus surveyors intend to get data only for the heavy undulated topographic features chosen by himself to save time and expenses. Consequently, it causes poor results due to low dense measurement as well as it's not matched with the results by another surveyors. As a result, the conflicts related in earthwork volume calculation often arises among the owner, contractors and sub contractors. In this study, we developed a method to get surveying data for fast and accurate volume calculation using 3D Mobile Laser System and conducted an application test. Also we carried out experiments for topographic survey using MLS to judge for the application additionally. The results showed that we could reduce a time for cross section survey from 48 hours to 2 hours and collected high dense data which have 0.2m interval instead of 3m interval compare with existing method. Also we could make a map which has high accuracy within 10cm in horizontal through topographic survey using MLS.

A Study on the Application of Drone Based Aeromagnetic Survey System to Iron Mine Site (드론 기반 항공자력탐사 시스템을 이용한 철광산 탐사 적용성 연구)

  • Min, Dongmin;Oh, Seokhoon
    • Journal of the Korean earth science society
    • /
    • v.38 no.4
    • /
    • pp.251-262
    • /
    • 2017
  • The system of magnetic exploration with a drone flight was constructed and applied to the iron mine site. The magnetic probe system installed on the drone used a sensor as Bartington's fluxgate type magnetometer, Mag639 and the A/D converter to collect magnetic intensity values on the tablet PC. The drone flight control module is a highly expandable Pixhawk with allowing 15 minutes of flight by loading 3kg. Experiments on the magnetic field interference range were performed to remove the erroneous effect from the drone with applying RTK GPS to obtain the magnetic intensity value at the accurate position. The accurate location information enabled to obtain the gradient measurement of magnetic field by measuring twice at different altitudes. Also, by using the terrain information, we could eliminate the terrain effect by setting the flight path to fly along the terrain. These results are in line with the field experiments using the nuclear proton magnetometer G-858 of Geometrics Co., Ltd, which adds to the reliability of the drone based aeromagnetic survey system we constructed.

Construction of Management System of Road Position Information Using GPS Surveying Data

  • Kim, Jin-Soo;Roh, Tae-Ho;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • This study aims to construct a management system of road position information as part of the build-up to a maintenance and management system of highways. First, information on the positions of the roads were obtained by a real-time kinematic satellite surveying, and then the degree of accuracy was analyzed in comparison with the data of the existing design drawings. The linear coordinates of road center line obtained by using RTK GPS showed about 7.6-13.2cm errors in X and Y directions in the case of the national road No.2 section, and about 8.4-9.2cm errors in the case of local road No.1045 section. These errors were within the tolerance scope regulated by the TS survey, and could be practically used. In the case of vertical alignment, there were about 6.2cm errors in the Z direction in local road No.1045 section. Aerial photographs are normally used in producing numerical maps, and it can be practically used because the tolerance scope of the elevation control point is l0cm when the scale of aerial photographs is 1/1000. The management system of road position information, utilizing Object-Oriented Programming(OOP), was built having the data acquired in this way as the attribute data. The system developed in this way can enable us to spot the positions of road facilities, the target of management with ease, to easily update the data in case of changes in the positions of roads and road facilities, and to manage the positions of roads and road facilities more effectively.

  • PDF

The Utilization of DEM Made by Digital Map in Height Evaluation of Buildings in a Flying Safety Area (비행안전구역 건물 높이 평가에서 수치지형도로 제작한 DEM의 활용성)

  • Park, Jong-Chul;Kim, Man-Kyu;Jung, Woong-Sun;Han, Gyu-Cheol;Ryu, Young-Ki
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.14 no.3
    • /
    • pp.78-95
    • /
    • 2011
  • This study has developed various DEMs with different spatial resolutions using many different interpolation methods with the aid of a 1:5,000 digital map. In addition, this study has evaluated the vertical accuracy of various DEMs constructed by check point data obtained from the network RTK GPS survey. The obtained results suggest that a DEM developed from the TIN-based Terrain method performs well in evaluating height restriction of buildings in a flying safety area considering general RMSE values, land-type RMSE values and profile evaluation results, etc. And, it has been found that three meters is the right spatial resolution for a DEM in evaluating height restriction of buildings in a flying safety area. Meanwhile, elevation values obtained by the DEM are not point estimation values but interval estimation values. This can be used to check whether the height of buildings in the vicinity of an airfield violates height limitation values of the area. To check whether the height of buildings measured in interval estimation values violates height limitation values of the area, this study has adopted three steps: 1) high probability of violation, 2) low probability of violation, 3) inconclusiveness about the violation. The obtained results will provide an important basis for developing a GIS related to the evaluation of height restriction of buildings in the vicinity of an airfield. Furthermore, although results are limited to the study area, the vertical accuracy values of the DEM constructed from a two-dimensional digital map may provide useful information to researchers who try to use DEMs.