• 제목/요약/키워드: G7 train

검색결과 90건 처리시간 0.025초

G7 시제 차량의 터널내부 압력파에 대한 수치 해석 (The Numerical Simulation of the Pressure wave for G7 Test Train in the Tunnel)

  • 권혁빈;김태윤;권재현;이동호;김문상
    • 한국철도학회논문집
    • /
    • 제5권4호
    • /
    • pp.260-266
    • /
    • 2002
  • A numerical simulation has been performed to estimate the transient pressure variation in the tunnel when G7 test train passes through the test tunnel in the Kyoeng-Bu high-speed railway. A modified patched grid scheme is developed to handle the relative motion between a train and a tunnel. Also, a hybrid dimensional approach is proposed to calculate the train-tunnel interaction problem efficiently. An axi-symmetric unsteady Euler solve using the Roe's FDS is used for analyzing a complicated pressure field in tunnel during the test train is passing through the tunnel. Usually, this complex phenomenon depends ell the train speed, train length, tunnel length, blockage ratio between train and tunnel cross-sectional area, relative position between train and tunnel, etc. Therefore, numerical simulation should be done carefully in consideration of these factors. Numerical results in this study would be good guidance to make test plans, test equipments selection and to decide their measuring locations. They will also supply important information to the pressurization equipment for high-speed train.

열차풍에 의한 고속선 자갈비산현상 연구 (A Study on the Ballast-flying Phenomena by Strong Wind Induced by High-speed Train)

  • 권혁빈;박춘수
    • 한국철도학회논문집
    • /
    • 제8권1호
    • /
    • pp.6-14
    • /
    • 2005
  • The mechanism of ballast-flying phenomena by strong wind induced by high-speed trains has extensively been investigated by conducting wind tunnel test and field-measuring of wind velocity in the vicinity of the track. The ballast gathered from the Seoul-Busan high-speed railway track has been classified by mass and shape to find relationship between those properties and the characteristic of movement in high wind and 16-channel Kiel-probe array has been used to examine the detailed flow structure above the surface of the track. The probability of ballast-flying during the passage of the high-speed train has been assessed comparing the results from wind tunnel test and that from field-measuring. The results shows that when the G7 train runs well as the KTX train runs at 300km/h, about 25m/s wind gust is induced just above the tie and the probability far small ballast under 50g to fly is about 50% when it is on the tie. If the G7 train runs at 350km/h, the wind gust just above the tie increases to 30m/s, therefore radical countermeasure seems to be needed.

자갈비산 메커니즘 연구를 위한 고속철도차량 하부유동 계측 (Track Measurements of Strong Wind under High-speed Train to Investigate Ballast-flying Mechanism)

  • 권혁빈;박춘수;남성원;고태환
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.369-373
    • /
    • 2005
  • To investigate the mechanism of ballast-flying phenomena by strong wind induced by high-speed trains, wind velocity in the vicinity of the track has been measured using 16-channel Kiel-probe array and detailed flow structure near the surface of the track has been analyzed. The position at which the underflow fully develop has been examined in order to assess the driving force of the turbulent flow under train and the results yields that the turbulent flow owing to the cavity of the inter-car as well as the friction force at the underbody of the train is the main reason of the strong wind under high-speed train. The preceding wind tunnel test results has been introduced to assess the probability of ballast-flying during the passage of the high-speed train by comparing the results from field-measuring. The results shows that when the G7 train as well as the KTX train runs at 300km/h, about 25m/s wind gust is induced just above the tie and the probability for small ballast under 50g to fly is about 50% when it is on the tie. If the G7 train runs at 350km/h, the wind gust just above the tie increases to 30m/s, therefore more radical countermeasure seems to be needed.

  • PDF

G7 고속전철 기술개발사업에서의 차량시스템 엔지니어링기술 및 시제차량 디자인 개발 (Development of Train System Engineering Technology and Exterior and Interior Design of Prototype Test Train in G7 Project for High Speed Railway Technology)

  • 정경렬;김경택;이병종;윤세균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.533-541
    • /
    • 2003
  • This paper shows the results of train system engineering technology and exterior and interior design of a prototype test train(HSR 350X) which was developed in R&D project titled 'Development of High Speed Railway Technology'. The prototype test train, which has two power cars, two motorized trailers and three trailers, is now being tested on high speed line.

  • PDF

G7 고속전철기술개발사업 집전시스템 사양의 최적화 연구 (An Optimization Study on Technical Specifications of a Current Collection System in G7 Korean High Speed Train Development Project)

  • 조용현;김영국;현승호;이기원;김휘준
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.543-556
    • /
    • 2000
  • A study on Technical Specifications of the current collection system in G7 Korean High Speed Train Project is performed in this paper. First, an appropriate level of contact wire tension for 350km/h commercial operation is proposed based on the foreign high speed train operation experiences and a relevant technical criterion, Second, two optimized design specifications of the pantograph for G7 Korean High Speed Train are proposed based on current collection quality. In order to perform design optimization, a formulation on the follow-up characteristics of a pantograph with 3 levels of masse-spring-damper is derived in this paper. Dynamic design parameters of the pantograph are adjusted to maximize follow-up capability at the dropper and span passing frequencies.

  • PDF

G7 TTX 및 차량의 측풍 해석 (Analysis of crosswind around G7 and TTX)

  • 김태윤;이보성;권혁빈;고태환;이동호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.138-143
    • /
    • 2005
  • In this study, the cross-wind stability of the G7 train and TTX running under the high speed was investigated by using 2-dimensional Reynolds Averaged Navier-Stokes equations. It is very important to analysis the aerodynamic characteristic of bluff body located near a ground at the field of the aeronautical, wind engineering, ground vehicle system. To the point of running stability, it is meaningful to analysis the cross-wind effect to the G7 train and TTX developed by domestic technology. The aerodynamic characteristics of the G7 train equipped by bogie-cover is more superior to the case without bogie-cover. Also 2nd model of TTX has stream-shape body has the more good performance than 1st model of TTX.

  • PDF

철도차량의 승강장 통과시 발생하는 공기역학적 영향에 대한 실험적 연구 (An Experimental Study on the Aerodynamic Effects Generated by a Train Passing Rear by Platform)

  • 김동현;권혁빈;김도훈;김문헌;송문석
    • 대한기계학회논문집B
    • /
    • 제28권6호
    • /
    • pp.734-739
    • /
    • 2004
  • The aerodynamic effect on platform during the train passage, the results of field test on the high-speed railway platform are discussed and the whole test results and conclusions are synthesized. The field test for the high-speed railway have been conducted on the Osong temporary platform in the newly constructed Seoul-Busan high-speed line and total 12 measurements have been conducted for G7 train and KTX train. The results shows that the high-speed trains have similar aerodynamic characteristics and have far better characteristics referring to the conventional trains such as Saemaul and Mugungwha trains. To discuss the actual aerodynamic effects on the platform at its own operational speed, Beaufort wind scale have been introduced and the criteria for the safety on railway platform has also been discussed.

고속전철 진동소음해석 및 저감기술개발: G-7과제개요 및 연구방향 (Development of the Vibration & Noise Analysis and Reduction Technology for High Speed Train: G-7 Project Outline and Research Direction)

  • 이우식;박철희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 창립기념 춘계학술대회 논문집
    • /
    • pp.221-232
    • /
    • 1998
  • This paper introduces the outline of the ongoing G-7 project for the development of vibration and noise analysis and reduction technology for the Korea High Speed Train which will run at 350km/h. Extensively collected materials and data on the vibration and noise characteristics of high speed trains are summarized herein to reduce the research direction.

  • PDF

경부고속철도 시험선 구간에서 G7 고속전철 차량의 동특성 검토 (Review on the Dynamic Behavior of G7 High Speed Train(KHST) in the KTX Test Line)

  • 박찬경;김영국;배대성;박태원
    • 한국철도학회논문집
    • /
    • 제4권4호
    • /
    • pp.131-137
    • /
    • 2001
  • The dynamic behavior of high speed train is very important because of its safety and passengers' ride comfort. The railway vehicle is composed of many suspension components, such as 1st springs, 1st dampers, 2nd springs and 2nd dampers, that have an influence on the dynamic characteristics of high speed train. Also, the wheel/rail shapes and the track geometry affect the dynamic behavior of high speed train. This paper reviews the dynamic behavior of KHST in the KTX test line. The VAMPIRE program is used for this simulation. The simulation results are within the limits of safety criteria. Thus the KHST can operate safely at 350 km/h in the KTX test line.

  • PDF

고속철도 차량용 소결 마찰재료 개발 (Development of the Sintered Friction Material for the High Speed Railway)

  • 김기열;김상호;김유신;이범주;김석원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.315-321
    • /
    • 2004
  • Dawin Friction Corp. has been advanced sintered brake pad for Korean concept high speed train (so called G7 train) with KRRI, You Jin and Rotem without the assistance of foreign company. In the course of development, the evaluation of our and foreign disk pads was performed by lab scale dynamometer and full scale dynamometer. As the result of dynamo test, it is shown that our developed brake disk is equal or superior to those of foreign companies in many respects, for example, wear resistance, noise, etc. The new brake pad which is developed through 'post G7-project' is equipped with G7 train and is under many tests without any problems at the present moment.

  • PDF