• Title/Summary/Keyword: Fuzzy assessment

Search Result 257, Processing Time 0.02 seconds

Ranking Decision on Assessment Indicator of Natural Resource Conservation Area Using Fuzzy Theory - Focused on Site Selection for the National Trust - (퍼지이론을 이용한 자연자원 보전지역의 평가지표 순위 결정 - 내셔널 트러스트 후보지 선정을 중심으로 -)

  • You Ju-Han;Jung Sung-Gwan;Park Kyung-Hun;Oh Jeong-Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.4 s.111
    • /
    • pp.97-107
    • /
    • 2005
  • This study was carried out to construct accurate and scientific system of assessment indicators in selection of National Trust conservation areas, which was new concept of domestic environment movement and offer the raw data of new analytic method by introducing the fuzzy theory and weight for overcoming the uncertainty of ranking decision. To transform the Likert's scale granted to assessment indicators into the type of triangular fuzzy number(a, b, c), there was conversion to each minimum(a), median(b), and maximum(c) in applying membership function, and in using the center of gravity and eigenvalue, there was to decide the ranking. The rankings of converted values applied a mean importance and weight were confirmed that they were generally changed. Therefore, the ranking decision was better to accomplish objective and rational ranking decision by applying weight that was calculated in grouping of indicator than to judge the singular concept and to be useful in assessment of diverse National Trust site. In the future, because AHP, which was general method of calculating weight, was lacked, there was to understand the critical point to fix a pertinent weight, and to carry out the study applying engineering concept like fuzzy integral using $\lambda-measure$.

Group Decision Making Approach to Flood Vulnerability Assessment (홍수 취약성 평가를 위한 그룹 의사결정 접근법)

  • Kim, Yeong Kyu;Chung, Eun-Sung;Lee, Kil Seong;Kim, Yeonjoo
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.2
    • /
    • pp.99-109
    • /
    • 2013
  • Increasing complexity of the basin environments makes it difficult for single decision maker to consider all relevant aspects of problem, and thus the uncertainty of decision making grows. This study attempts to develop an approach to quantify the spatial flood vulnerability of South Korea. Fuzzy TOPSIS is used to calculate individual preference by each group and then three GDM techniques (Borda count method, Condorcet method, and Copeland method) are used to integrate the individual preference. Finally, rankings from Fuzzy TOPSIS, TOPSIS, and GDM are compared with Spearman rank correlation, Kendall rank correlation, and Emond & Mason rank correlation. As a result, the rankings of some areas are dramatically changed by the use of GDM techniques. Because GDM technique in regional vulnerability assessment may cause a significant change in priorities, the model presented in this study should be considered for objective flood vulnerability assessment.

Determining the Priority of Investment for Remedial Works of Slopes (사면관리를 위한 재원의 투자 우선 순위 평가)

  • 김상규;류지협;구호본;정하익;윤수호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.269-276
    • /
    • 1999
  • The program ESRAS Ver 0.5 that can assess the risk of slopes by means of fuzzy inference is developed in this paper. The results of assessment involve the degree of stability of slopes, the possible travel distance of the soil mass being failed, and anticipated loss of life and properties. With this program, vulnerable slopes can be managed most effectively and the fuzzy inference is used to express quantitatively the judgement of an expert and the uncertainty of slope stability. The fuzzy rule base is composed of an evaluation list for slope stability together with the experience of an expert. This program has been examined for 88 slopes which have been failed or shown a possibility of failure. With this examination, the standards to assess the stability of slopes can be presented and it is proven that this is particularly useful in determining the priority of investment for remedial works of slopes.

  • PDF

Market-Based Transmission Expansion Planning Under Uncertainty in Bids by Fuzzy Assessment

  • Kamyab, Gholam-Reza;Fotuhi-Firuzabad, Mahmood;Rashidinejad, Masoud
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.4
    • /
    • pp.468-479
    • /
    • 2012
  • In this paper, by a simple example it is shown that existing market-based criteria alone cannot completely and correctly evaluate the transmission network expansion from market view. However criteria congestion cost (CC) and social welfare (SW) together are able to correctly evaluate transmission network from market view and so they are adopted for the market-based transmission expansion planning. To simply indicate the limits of CC and SW social welfare percentage (SWP) and congestion cost percentage (CCP) are defined. To consider uncertainty in bids of market producers and consumers, and also indeterminacy in the acceptable boundaries of the SWP and CCP and their priorities, fuzzy assessment approach is used. In this approach, appropriate fuzzy sets and a fuzzy rule base are provided to evaluate the acceptability of an expansion plan. Then, the least-investment cost plan, which is acceptable in all probable scenarios, is searched. The proposed method is applied to an 8-bus system.

Risk Analysis System in Fuzzy Set Theory (퍼지 집합론을 이용한 위험분석 시스템)

  • 홍상우
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.21
    • /
    • pp.29-41
    • /
    • 1990
  • An assessment of risk in industrial and urban environments is essential in the prevention of accident and in the analysis of situations which are hazardous to public health and safety. The risk imposed by a particular hazard increases with the likelihood of occurence of the event, the exposure and the possible consequence of that event. In a traditional approach, the calculation of a quantitative value of risk is usually based on an assignment of numerical values of each of the risk factors. Then the product of the values of likelihood, exposure and consequences called risk score is derived. However vagueness and imprecision in mathematical quantification of risk are equated with fuzziness rather than randomness. In this paper, a fuzzy set theoretic approach to risk analysis is proposed as an alternative to the techniques currently used in the area of systems safety. Then the concept of risk evaluation using linguistic representation of the likelihood, exposure and consequences is introduced. A risk assessment model using approximate reasoning technique based on fuzzy logic is presented to drive fuzzy values of risk and numerical example for risk analysis is also presented to illustrate the results.

  • PDF

Condition Assessment Models and Fuzzy Reliability Analysis of Structural Systems (구조시스템의 퍼지신뢰성해석 및 상태평가모델)

  • 이증빈;손용우;박주원
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.10a
    • /
    • pp.61-68
    • /
    • 1998
  • It has become important to evaluate the qualitive reliability and condition assessment of existing structural systems in order to establish a rational program for repair and maintenance. Since most of if existing structural system may suffer from defect corrosion and damage, it is necessary to account for their effects in fuzzy reliability analysis, In this paper, an attempt is made to develope a reliability analysis for damaged structural systems using failure possibility theory. Damage state is specified in terms of linguistic valiables using natural language information and numerical information, which are defined by fuzzy sets. Using a subjective condition index of failure possibility and information of the damage state is introduced into the calculation of failure probability. The subjective condition index of quantitative and qualitative analysis method is newly proposed based on the fuzzy set operations, namely logical product, drastic product, logical sum and drastic sum

  • PDF

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.

A Note on E-Learning Dynamic Assessment with Fuzzy Estimations

  • Orozova Daniela;Kim Tae-Kyun;Kim Yung-Hwan;Park Dal-Won;Seo Jong-Jin;Atanassov Krassimir;Kang Dong-Jin;Rim Seog-Hoon;Jang Lee-Chae;Ryoo Cheon-Seoung
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.5 no.3
    • /
    • pp.179-182
    • /
    • 2005
  • A model of an assessment module has been created, using intuitionistic fuzzy estimations, which render account on the knowledge of the trained objects. The final mark is determined on the basis of a set of evaluation units. An opportunity is offered no only fur tracing the changes of the parameters of the trainer object, but there is also an opportunity of tracing the status of the already comprehended knowledge, as well as evaluating and changing the training themes and evaluation criteria.

Development of a Risk Analysis Assessment Models for the Construction Projects (건설공사의 위험도 분석평가 및 모델개발)

  • Lee, Jeong-Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.3 no.2
    • /
    • pp.233-240
    • /
    • 1999
  • Even though the recent construction safety disasters not only result in the loss inside construction sites but also become to a large public disasters, safety activities are managed in an irrational way and safety rules are ignored in the construction sites which leads to occur same type of disasters repeatedly. In this paper, a fuzzy set theoretic approach to risk analysis is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using linguistic representation of the likelihood, exposure and consequences is introduced. A risk assessment model using approximate reasoning technique base on fuzzy logic is presented to drive fuzzy values of risk and numerical example for risk analysis is also presented to illustrate the results.

  • PDF

Disassembility Assessment of Air-cleaner by DFDA ( For Korea-Japan Passenger-Vehicle ) (DFDA를 이용한 에어 크리너의 분해성 평가 ( 한일 차량용을 중심으로 ))

  • 김하수;강희용;양성모;진정선
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.428-433
    • /
    • 2000
  • A disassembility assessment has mostly depend on the subjective decision making from the qualitative element. The work of disassembly is already classified with given disassemble points from the symbolic chart method. It is not useful in the practical assessment because it is not specified. The new method of design for disassembility assessment(DFDA) is practical to introduce the fuzzy number as the conversion of quantitative element from qualitative. It is appled to compare the usefulness of air-cleaner in Korea-Japan passenger-vehicle.

  • PDF