• Title/Summary/Keyword: Full-Bridge

Search Result 1,146, Processing Time 0.027 seconds

다주식 기초 해상교량에서 대구경 현장타설말뚝과 파일캡의 강결합에 대한 분석 (Analysis on the Rigid Connections between the Large Diameter Drilled Shaft and the Pile Cap for the Sea-Crossing Bridges with Multiple Pile Foundations)

  • 조성민;박상일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.343-358
    • /
    • 2008
  • Piles of a bridge pier are connected with a column through a pile cap(footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. This difference causes a change of the design method. Connection methods between pile heads and the pile cap are divided into two groups ; rigid connections and hinge connections. KHBDC(Korea Highway Bridge Design Code) has specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However some specifications prescribe that conservative results through investigations for both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which have very good quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) are unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the very large diameter drilled shaft and the pile cap for Incheon Bridge which will the longest bridge in Korea were investigated through the full modeling for rigid connection conditions.

  • PDF

광대역 출력을 가지는 전기자동차 배터리 충전용 AC/DC 컨버터 (Wide Output Range AC/DC Converter for Rechargeable Battery of Electric Vehicle)

  • 김영일;김홍중;전범수;박귀철;최재호
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2016년도 전력전자학술대회 논문집
    • /
    • pp.73-74
    • /
    • 2016
  • This paper proposes a wide output range AC/DC converter for a rechargeable battery of electric vehicle. In the proposed wide output range AC/DC converter for rechargeable battery of electric vehicle, the main transformer in the DC/DC stage is divided by two. Therefore, if the switch is connected to the middle tap, then half of the maximum voltage is applied. Otherwise, it can be applied the full range of the high voltage by connecting the switch to the whole tab. And also, it is designed to have a wide output voltage range by applying Vin/2 made by changing the full-bridge to half-bridge by using the bridge change switch of the input stage. As it can be supplied the wide range output voltage with a single module, it has the advantage of space utilization and cost reduction effect.

  • PDF

2-단계 HID 램프용 전자식 안정기의 디지털 제어 (Digital Control of Two-Stage Electronic ballast for HID Lamps)

  • 이우철
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2013년도 추계학술대회 논문집
    • /
    • pp.229-230
    • /
    • 2013
  • The conventional Three-Stage electronic ballast is stable, but Two-Stage electronic ballast has been researching because of efficiency. Three-Stage electronic ballast is consisted of PFC circuit, buck converter, and inverter circuit, but Two-stage is consisted of PFC circuit, Buck-Inverter full bridge circuit. The Buck-Inverter full bridge inverter consists of two half bridge inverters for low frequency switching, and high frequency switching. In the case of street lamp it is far from a lamp to a ballast, the conventional pulsed high voltage ignitor can not turn on the HID lamps because of reduction of ignition voltage. Therefore, it needs to do the research on a resonant ignition to turn on the HID lamps. Therefore, in the Two-Stage electronic ballast which has the resonant tank for ignition, the transient resonant current because of low frequency changing is analyzed, the novel algorithm is proposed to resuce the transient current.

  • PDF

능동 클램프형 전류형 단상 풀브리지 DC-DC 컨버터의 동작 해석 (Analysis of Current Fed Full Bridge DC-DC Converter with Active Clamp)

  • 차한주;최순호;안치형
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.205-207
    • /
    • 2007
  • Isolated Current fed full-bridge converter with active clamp is analyzed in this paper. An active clamp branch is used for limiting the voltage overshoot in the bridge switches and rectifier diodes. Zero voltage switching(ZVS) is also realized by using the energy stored in the transformer leakage inductance. To analyze the converter, 6 modes of operation are introduced and investigated. For each of the modes, voltage and current equations are derived together with corresponding equivalent circuits. 200W prototype dc-dc converter is assembled and verifies the effectiveness of the analysis and simulation.

  • PDF

지진시에 교량의 탄성 받침을 표현하는 범용 연결 유한 요소 모델의 유도식 (Derivation of General Link Finite Element Equation representing Pad Shoe in Bridge under Earthquake)

  • 정대열
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.226-233
    • /
    • 1999
  • When we numerically model the bridge under seismic condition, the full model combining the super-structure and the sub-structure is considered for the more accurate results than the separate model. In this case, the super-structure is connected with the sub-structure by the elastic pad shoe that is difficult to model, because it has the three translational elastic stiffness and the three rotational elastic stiffness. The two-node General Link element is derived in finite element equation representing such a pad shoe, and it is verified by comparing the one General Link element model with the corresponding three legacy spring element model. It is easy to model the pad shoe, if the General Link finite element is used. And the seismic analysis result of the bridge full model structure, which is modeled with the General Link element, has been compared with the one of the separate model structure. The present study gives. more conservative result than that of the separate model, which does not consider the dynamic behaviour of the sub-structure.

  • PDF

Partial-interaction fatigue assessment of stud shear connectors in composite bridge beams

  • Seracino, Rudolf;Oehlers, Deric J.;Yeo, Michael F.
    • Structural Engineering and Mechanics
    • /
    • 제13권4호
    • /
    • pp.455-464
    • /
    • 2002
  • There is a growing demand to assess the remaining strength and endurance of existing composite steel and concrete bridge beams due to the aging infrastructure, increases in permissible vehicle weights and increases in their frequencies. As codes are generally dedicated to the design of new structures, new procedures are required to aid in the assessment of existing bridges to ensure that they are utilised to the full. In this paper, simple expressions are presented to perform partial-interaction analyses directly from full-interaction analyses, so that the beneficial effect of partial-interaction on the shear forces on the shear connectors can be utilised in assessment to extend the fatigue life of simply supported bridge beams and to determine the effect of remedial work if necessary. Use of the assessment technique is described by way of an illustrative example.

위상 천이 풀 브릿지 컨버터를 위한 전압 진동 제거 기술 (Voltage Oscillation Reduction Technique for Phase Shift Full Bridge Converter)

  • 박기범;김정은;문건우;윤명중
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2005년도 전력전자학술대회 논문집
    • /
    • pp.286-288
    • /
    • 2005
  • Conventional phase shift full bridge (PSFB) converter has serious voltage oscillation problem across the secondary rectifier diodes, which would require the dissipate snubber circuit, thus degrades the overall efficiency. To overcome this problem, a new voltage oscillation reduction technique (VORT) which effectively reduce the voltage oscillation of the secondary rectifier diodes for phase shift 1011 bridge converter is proposed. Therefore, no dissipate snubber for rectifier diodes is needed. In addition, since it has wide zero voltage switching (ZVS) range, high efficiency can be achieved. Operational principle, analysis of voltage oscillation, and design consideration are presented compare with that of the conventional PSFB converter. To confirm the validity of the proposed VORT, experimental results from a 420W, 385Vdc/210Vdc prototype are presented.

  • PDF

연료전지 발전시스템에 관한 연구 (A study on Fuel Cell generation system)

  • 정동효
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 정기총회 및 학술대회 전문대학교육위원
    • /
    • pp.77-78
    • /
    • 2008
  • Recently, a fuel cell is remarkable for new generation system. The fuel cell generation system converts the chemical energy of a fuel directly into electrical energy. The fuel cell generation is characterized by low voltage and high current. For connecting to utility, it needs both a step up converter and an inverter. The step up converter makes DC link and the inverter changes DC to AC. In this paper, full bridge converter and the single phase inverter are designed and installed for fuel cell. Simulation and experiment verify that fuel cell generation system could be applied for the distributed generation. In this paper, the 1.5kW active clamp current-fed full bridge converter employing MOSFETs is operated to discharge the battery whereas a voltage-fed half bridge converter employing IGBTs is operated to charge the battery.

  • PDF

HID 램프용 Two-Stage 전자식 안정기의 과도 전류 제어 (Transient Current Control of Two-Stage Electronics Ballast for HID Lamps)

  • 이우철
    • 조명전기설비학회논문지
    • /
    • 제28권1호
    • /
    • pp.1-8
    • /
    • 2014
  • The conventional Three-Stage electronic ballast is stable, but Two-Stage electronic ballast has been researching because of efficiency. Three-Stage electronic ballast is consisted of PFC circuit, buck converter, and inverter circuit, but Two-stage is consisted of PFC circuit, Buck-Inverter full bridge circuit. The Buck-Inverter full bridge inverter consists of two half bridge inverters for low frequency switching, and high frequency switching. In the case of street lamp it is far from a lamp to a ballast, the conventional pulsed high voltage ignitor can not turn on the HID lamps because of reduction of ignition voltage. Therefore, it needs to do the research on a resonant ignition to turn on the HID lamps. Therefore, in the Two-Stage electronic ballast which has the resonant tank for ignition, the transient resonant current because of low frequency changing is analyzed, the novel algorithm is proposed to resuce the transient current.

새론운 복합변압기를 적용한 영전압 풀브릿지 컨버터에 관한 연구 (A Study on the ZVS Full Bridge Converters using the New Integrated Magnetics Transformer)

  • 안태영;봉상철;김돈식
    • 전력전자학회논문지
    • /
    • 제13권5호
    • /
    • pp.396-402
    • /
    • 2008
  • 본 논문에서는 영전압 스위칭 풀브릿지 컨버터에 적용할 수 있는 새로운 방식의 복합 변압기(Integrated magnetics) 구조를 제안하고 시험용 컨버터에 적용하여 실험 결과를 보고한 것이다. 제안된 복합변압기의 권선 방법은 두 개의 1차측 권선을 병렬로 하고 2차측 권선은 중앙에 탭이 있는 배전압 방식으로 구성이 된다. 복합변압기의 구조는 기본적으로 EE, EI 코어를 이용하며 코어 양쪽 다리에 변압기의 1, 2차 권선이 각각 위치하고, 중앙의 다리에는 출력 필터용 인덕터 권선을 구성한다 제안된 복합변압기의 성능을 평가하기 위해서 100kHz의 스위칭 주파수, 12V 출력전압과 최대출력 720W급의 컨버터를 제작하였으며 복합변압기는 전 범위에서 동작이 안정되었으며 컨버터는 최대 92%의 전력변환효율을 나타내었다.