• 제목/요약/키워드: Frame Works

검색결과 272건 처리시간 0.024초

건설기계·장비의 안전재해 네트워크 및 위험도 분석 (An Analysis on the Safety Accident Network and Risk Level of Construction Machine and Equipment)

  • 신원상;손창백
    • 대한건축학회논문집:구조계
    • /
    • 제34권5호
    • /
    • pp.35-42
    • /
    • 2018
  • In order to seek out methods to reduce safety accidents caused by construction machinery and equipment, this study collects data about safety accidents and draws main risk factors by construction from the data, through SNA. It aimed to suggest safety management points to be used in future construction fields, by analyzing risk index of such factors. The finding can be summarized: First, Backhoe Bucket is the risk factor for crash accidents of average workers in earth works; boring machines-maintenance is the risk factor for fall accidents of construction machinery operators in foundation works; bending machine-reinforcing rod processing is the risk factor for jamming accidents of reinforcing rod engineers in frame works; and mobile crane-hook is the risk factor for crash accidents of average workers in lifting works. Second, works can be arranged in turn, according to the risk index: earth, lifting, frame and foundation works. Risk factors can be also arranged according to the risk index: Backhoe in earth works, pile drivers in foundation works, bending machines in frame works and mobile cranes in lifting works. This study has some limits, in that it only analyzed main machinery/equipment, among various kinds of them, for earth, foundation, frame and temporary works (lifting works) and used data collected over three years. Therefore, it is necessary to conduct an analysis using big data, by collecting additional data about a lot of machinery/equipment in future construction fields.

터널의 유지보수공사 개선을 위한 가설 스페이스 트러스 프레임의 사용성 및 안정성 평가 (Structural and Functional Measurements of a Space Truss Frame for Maintenance Works in Tunnels)

  • 이동규;김도환;김진호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제16권3호
    • /
    • pp.92-98
    • /
    • 2012
  • 본 연구는 터널의 유지, 보수, 보강에 필요한 가설공사용 스페이스 트러스 프레임 구조물을 소개한다. 기존 가설공사 시공방식과 장비들의 현황 및 문제점을 분석하고, 터널 설계의 핵심 구성요소를 파악함으로써, 제안된 새로운 가설 시공기술 시스템을 개발하는 과정을 순차적으로 설명한다. 그리고 개발된 가설 시스템을 발주처, 시공사, 터널 이용자 관점에서 사용성 및 경제성을 분석하고, 구조적인 안전성 검토와 최적단면 산정 평가를 상용 유한요소 해석프로그램인 ABAQUS 6.5로 구현하여 본 가설 시스템의 현장적용 기반을 구축한다.

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

  • 조태제;최종수
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.9-17
    • /
    • 2011
  • 건설프로젝트에서 공기지연은 공정 및 공사비 관리 측면에서 핵심 관리사항에 해당된다. 본 연구는 아파트 건설공사에서 직접비의 상당부분을 차지하는 골조공사를 대상으로 공사부위별 공기지연 수준을 분석하고 대책을 제시한 실증연구로 10개 현장의 공사비 비중분석 결과에 기반하여 골조공사에서 지연이 발생하는 부위의 순위, 원인 등을 분석하였다. 분석결과 1층 골조공사에서 가장 큰 지연이 발생하는 것으로 나타났으며 지연원인을 다양한 분류에 의거하여 분석하고 대책을 제시하였다.

타워크레인 붕괴사고의 구조적 분석 (Structural Analysis for the Collapse Accident of Tower Crane)

  • 이명구;노민래
    • 한국안전학회지
    • /
    • 제16권4호
    • /
    • pp.147-152
    • /
    • 2001
  • The tower cranes are the very useful construction machine in the high place works. But they are very susceptible to the load balance, the wind load and the hanging load because they are the very slender structures and those center of gravity is located in the upper part. Therefore, the collapse accidents of tower one have repeatedly happened during the assemble or disassemble works. The correcting frame may has often used in order to correct the error in the setting of foundation anchors. The goal of this study is that propose the methods preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting frame. This study result in the methods preventible the same accident.

  • PDF

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • 한국건축시공학회지
    • /
    • 제11권5호
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

동절기 골조공사 시행이 마감공사의 주공정선에 미치는 영향 -아파트 공사의 사례분석을 중심으로- (Influence of the Structural Framework on the Critical Path of Finish Works in Winter Season -Focusing on Case Study of High-rise Apartment Housing-)

  • 한충희;방종대
    • 한국건설관리학회논문집
    • /
    • 제7권1호
    • /
    • pp.148-158
    • /
    • 2006
  • 공공발주기관의 동절기 공사불능기간의 운영은 공사기간을 길게 하고, 건설사업비를 증가시킨다 또한, 건설인력의 활용을 어렵게 하여 근로소득을 감소시킴으로써 국가 경제에도 나쁜 영향을 미친다. 그러므로 동절기에도 골조공사는 시행되어야 할 것이다. 그러나 동절기에 골조공사만 시행하고 마감공사를 시행하지 않을 경우, 골조공사의 빠른 진척이 마감공사의 주공정선에 영향을 미치게 됨으로 이에 대한 규명이 필요하다. 본 연구에서는 동절기 골조공사 시행이 마감공사의 주공정선의 작업기간에 미치는 영향을 규명하였다. 이를 위해 가상현장을 설정한 후, 이 현장을 대상으로 마감공사의 공정표와 주공정선, 전체 공정표 및 주공정선을 작성하고, 공정시뮬레이션을 실시하였다. 본 연구결과는 동절기 골조공사 시행 시 아파트 공사의 공기산정에 유용하게 활용될 수 있을 것이다.

Development of an Automatic Silkworm Breeding System

  • Sang Kwun Jeong;Sung Wook Jang;Jin kook Son;Seong Wan Kim
    • International Journal of Industrial Entomology and Biomaterials
    • /
    • 제47권2호
    • /
    • pp.79-89
    • /
    • 2023
  • This paper is about the development results of an automatic silkworm breeding system to reduce labor and time by automatically performing the works for silkworm droppings changing and feed its food. It consists of an automatic guided vehicle and a processing unit. The automatic guided vehicle transports a silkworm dropping changing frame mounted on a silkworm tray stand, and the processing unit takes over the dropping changing frame on it, removes excrement contained the droppings changing frame and feeds silkworm food. In the case of the current silkworm farming, because the breeding period for large silkworms (4 to 5 stage) is short to 14 days and the supply of mulberry leaves takes 98% of the total amount of mulberry leaves needed for breeding silkworms at this time, labor concentration is intensive, and all breeding works depends on manpower. Therefore, it was difficult to breed large silkworms on a large scale. Moreover, silkworms are bred by adding Silkworm bed (Seop) and mulberry in the silkworm tray, and their droppings changing is to separate silkworms and excrement by moving silkworm trays one by one, and the production cost increases due to the high-cost manpower for silkworm breeding. To solve this problem, technology for automating silkworm breeding has also been developed. However, there is still a limitation that silkworm feeding and droppings changing works are not suitable for mass breeding because a lot of labor and time are spent depending on manual work. Therefore, a new silkworm breeding system for breeding silkworm automatically is needed and so we developed an Automatic Silkworm Breeding System applying the droppings change frame, the inverting unit, the feeding silkworm food device and automatic guided vehicle.

A graphical user interface for stand-alone and mixed-type modelling of reinforced concrete structures

  • Sadeghian, Vahid;Vecchio, Frank
    • Computers and Concrete
    • /
    • 제16권2호
    • /
    • pp.287-309
    • /
    • 2015
  • FormWorks-Plus is a generalized public domain user-friendly preprocessor developed to facilitate the process of creating finite element models for structural analysis programs. The lack of a graphical user interface in most academic analysis programs forces users to input the structural model information into the standard text files, which is a time-consuming and error-prone process. FormWorks-Plus enables engineers to conveniently set up the finite element model in a graphical environment, eliminating the problems associated with conventional input text files and improving the user's perception of the application. In this paper, a brief overview of the FormWorks-Plus structure is presented, followed by a detailed explanation of the main features of the program. In addition, demonstration is made of the application of FormWorks-Plus in combination with VecTor programs, advanced nonlinear analysis tools for reinforced concrete structures. Finally, aspects relating to the modelling and analysis of three case studies are discussed: a reinforced concrete beam-column joint, a steel-concrete composite shear wall, and a SFRC shear panel. The unique mixed-type frame-membrane modelling procedure implemented in FormWorks-Plus can address the limitations associated with most frame type analyses.

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

철골공사의 품질관리 업무 프로세스 모델 개발 (A Work Process Model for a Quality Management in Steel Frame Work)

  • 김종성;김형중;변은정;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.150-158
    • /
    • 2007
  • 건축물이 고층화, 대형화되면서 철골구조를 기본골조로 채택하는 경우가 많아지고 있으며, 철골공사의 품질관리는 사전계획단계부터 이루어지며, 단계별 참여자간의 업무 구분 및 연계가 매우 중요하다 이에 본 연구는 철골공사의 품질관리를 보다 원활하게 수행하기 위하여, 기존 철골공사 품질관리업무를 기반으로 업무간 상호관계 및 입출력 정보를 고려한 품질관리 업무 프로세스 모델을 개발하고자 한다.