• Title/Summary/Keyword: Four Major River

Search Result 184, Processing Time 0.028 seconds

Characteristics and Reference Information of Riparian Vegetation for Realizing Ecological Restoration Classified by Reach of the River in Korea (한국 하천의 구간 별 특성과 생태적 복원을 실현하기 위한 대조식생 정보)

  • Jung, Song Hie;Kim, Areum;Seol, Jaewon;Lim, Bong Soon;Lee, Chang Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.5
    • /
    • pp.447-461
    • /
    • 2018
  • To realize river restoration that ecological characteristics of the river are reflected, we classified the river into four reaches of valley stream, upstream, midstream, and downstream based on substrate as well as riverbed gradient obtained from the relationship between distance from the river mouth, and above sea level. Considering that the rivers of Korea have been dominated by various and intense artificial interferences over a lengthy period, we determined cross sectional range of the river based on the geological map and clarified transformation degree by reach. Vegetation profile diagram was prepared by depicting horizontal range and vertical stratification of major vegetation appearing in a belt transect of 10 m breadth installed between weirs constructed in both sides of the river. Restoration models by river reach were prepared based on breadth of waterway, bare ground, herb, shrub, and tree dominated vegetation zones on vegetation profiles wherein a flooding regime was reflected. Species composition information collected from vegetation established in each zone was systematized to use for restoring each reach ecologically. Further, background that longitudinal reaches and horizontal zones were divided, was discussed by comparing with case studies in foreign countries. In addition, necessity of ecological restoration of the river was discussed based on degree of integrity of Korean rivers, ecological significance of riparian vegetation, and importance of reference information for ecological restoration of the river.

Long-term Bed Change Analysis and Equilibrium Bed Elevation Prediction after Weir Construction in Nakdong River (낙동강의 보 구조물 설치 후 장기 하상변동 분석 및 평형하상고 예측에 관한 연구)

  • Ji, Un;Jang, Eun-Kyung;Kim, Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7089-7097
    • /
    • 2015
  • Bed changes in the Nakdong River were analyzed with long-term monitoring data for analyzing riverbed change patterns after Four Major Rivers Restoration Project (FMRRP). Also, possible long-term bed changes were predicted using one-dimensional numerical model for the section where the largest change was observed after FMRRP. The sensitive analysis was performed with different incoming sediment discharge conditions and sediment transport equations. The numerical model was calibrated by comparing short-term monitoring data and simulated results, and was applied for predicting bed change after 10 years. As a result of monitoring data analysis, the largest change in bed elevation occurred at the section between the Changnyeong-Haman and Hapcheon-Changnyeong weirs. The result of one-dimensional numerical modeling for 10 years indicated that maximum depositions of 2.07 m and 3.26 m were produced in this section.

Analysis of Sediment Discharge by Long-term Runoff in Nakdong River Watershed using SWAT Model (SWAT 모형을 이용한 낙동강 유역의 장기 유출에 따른 유사량 분석)

  • Ji, Un;Kim, Tae-Geun;Lee, Eun-Jeong;Ryoo, Kyong-Sik;Hwang, Man-Ha;Jang, Eun-Kyung
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.723-735
    • /
    • 2014
  • Sediment discharge by long-term runoff in the Nakdong River watershed should be predicted for the maintenance and management of the Nakdong River newly changed by the four major river restoration project. The data establishment by the analysis of runoff and sediment discharge using the long-term watershed model is necessary to predict possible problems by incoming sediments and to prepare countermeasures for the maintenance and management. Therefore, sediment discharges by long-term runoff in the main points of the Nakdong River were calculated using SWAT(soil and water assessment tool) model and the relations and features between rainfall, runoff, and sediment discharge were analyzed in this study. As a result of sediment discharge calculation in the main points of the Nakdong River and tributaries, the sediment discharge at the outlet of the Naesung Stream was greater than the Jindong Station in the Lower Nakdong River from 1999 to 2008 except the years with low precipitation. The sediment discharge at the Nakdong River Estuary Barrage (NREB) was corresponding to 20% of the Jindong Station which is located about 80 km upstream from NREB.

Verification of Water Environment Network Representative at the Baekcheon Junction of the Nakdong River (낙동강 백천 합류부 지점의 물환경측정망 대표성 검증)

  • Ahn, Jung Min;Im, Teo Hyo;Kim, Sung Min;Kim, Shin;Kim, Gyeong Hoon;Kwon, Heon Gak;Shin, Dongseok;Yang, Deuk Seok
    • Journal of Environmental Science International
    • /
    • v.27 no.6
    • /
    • pp.371-381
    • /
    • 2018
  • Multifunctional weirs constructed through the Four Major Rivers Restoration Project are operated as management water levels. The purpose of this study was to evaluate the effect of water level in the main stem on the tributary water level according to multifunctional weir operation, because the operation of multifunctional weirs for water level management influences the drainage of tributaries. In this study, water level pressure gauges were installed and spatial and temporal water quality was observed. The LOcally Weighted Scatterplot Smoothing (LOWESS) technique was applied to the Nakdong River and the Baekcheon Junction, both upstream of the Gangjeong-Goryeong weir, in order to analyze water quality trends. When considering the overall analysis and observations, it was found that the water quality forecasting point located at the Baekcheon estuary point should be transferred to the Dosung Bridge, which is located upstream of the Sunwon Bridge.

A study on comparison and analysis of chlorophyll sensor with aceton extraction for chlorophyll measurement in the Nakdong River (낙동강에서 클로로필(Chlorophyll) 측정을 위한 클로로필 센서와 아세톤 추출법의 비교분석에 관한 연구)

  • Park, Joo-Hyun;Lee, Kyoung-Jin;Cho, Jae-Won;Jeon, Sook-Lye;Kang, Seon-Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.325-335
    • /
    • 2015
  • Concerns about water quality in the Nakdong River have been raised because the Nakdong River will change from a lotic environment to a lentic environmental due to the installation of eight weirs to be constructed as part of the Four Major Rivers Restoration Project. The rapid urbanization and industrialization of the middle and the lower reaches of Nakdong River causes the indiscreet discharge of uncleanly living sewage and industrial wastewater. And the water quality of lower reaches of Nakdong River is getting seriously worse. Owing to the water shortage of Nakdong River and the closing of reaches because of the estuary dyke in the dry season, the velocity of a moving fluid is almost accumulated under 0.03m/sec. Then a pollutant is piled up on the bottom of the river. Polluted sediment is formed and nutrition level of water is increased more and more. The eutrophication state propagated to dark brown or green from eutrophication often comes out. Therefore in this study, we measured Chl. a of chlorophyll sensor (YSI6600V2) and aceton extraction through field observation in the Nakdong River and Samrangjin. And we evaluated the reliability of chlorophyll sensor. In correlation analysis between chlorophyll sensor and aceton extraction, it shows high relation in general. And it also shows high relation among the chlorophyll sensor and aceton extraction of the dominant diatom (Skeletonema costatum), Dinophyta (Prorocentrum minimum) in the Nakdong River estuary by laboratory analysis results.

Reassessment on the Four Major Rivers Restoration Project and the Weirs Management (4대강 살리기사업의 재평가와 보의 운용방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.4
    • /
    • pp.225-236
    • /
    • 2021
  • The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.

Analysis of Baseflow at Four Major Rivers using Web-based SWAT Bflow System (Web 기반 SWAT Bflow을 이용한 4대강 유역 기저유출 분석)

  • Kum, Dong-Hyuk;Moon, Jong-Pil;Ryu, Ji-Chul;Kang, Hyun-Woo;Jang, Won-Seok;Lim, Kyoung-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.373-373
    • /
    • 2011
  • Korean Government has been promoting Four River Restoration Project (i.e., Han, Geum, Nakdong, and Yeongsan rivers) since the second half of 2008. This project is expected to protect against floods and droughts by water resources management. Many researchers have study water resources management, but most studies were focused on direct runoff. However, in order to efficiently protect against floods and droughts, baseflow should be studied as well as direct runoff. Because baseflow has a great effect on streamflow, it needs to be correctly analyzed. For more accurate analysis of baseflow, direct runoff and baseflow from streamflow should be separated first. In this study, 12 flow gauging stations of four major rivers were selected, and flow data from them were obtained (2004-2010) through WAMIS and Web-based SWAT Bflow system (http://www.envsys.co.kr/~swatbflow) which was used to separate direct runoff and baseflow. Baseflow values of Pass 2 in SWAT Bflow system were used. As a result of this study, baseflow contribution was ranged from 23.4% to 68.6% and accounted for about 50% of streamflow. Through this study, it shows that in the case of the flow fluctuation, baseflow is more affected than direct runoff by changes in streamflow in a flood or dry season. Thus, baseflow estimation should not be overlooked for efficient water resources management. However, it has a limitation in this study that because this study used to select randomly 12 flow gauging stations, it did not show a common tendency on each watershed. It is important that flow gauging stations reflected on topographic characteristics of each watershed should be selected in a rigorous manner for further reliable and accurate baseflow estimation on four major rivers.

  • PDF

Levee Stability Assessment depending on Level of Inland and Riverside land in Flow State (흐름상태와 제내지 및 제외지의 표고변화에 따른 제방의 파이핑안정성 평가)

  • Kang, Taeun;An, Hyunuk;Kim, Yeonsu;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.4
    • /
    • pp.269-279
    • /
    • 2015
  • Nowadays, the world has suffered by natural disaster of climate change due to global warming. Korea has also faced with similar situation. To prevent these natural disaster, Four Major River Management has conducted. One of conducted content in Four Major River Management is the levee maintenance which classified into fill-up the inland, levee of reinforcement and so on. These maintenances may make the characteristics of groundwater flow change and affect to the levee safety (piping phenomenon). Therefore, analysis on groundwater fluctuation according to level of riverside and inland should be required. This study focus on levee of Hoe stream, which is connected to Nakdong river, and piping safety factor in the levee analyzed by using pore water pressure. Besides, groundwater fluctuation, which is depended on level of riverside and inland, is simulated by using the SEEP/W (2D ground water model). This simulation considered steady flow and unsteady flow. As a result, piping safety factor increased due to rising the inland level. Piping safety factor of riverside was effected by only river water level. Therefore, external levee factor considering inland level raising and suitable control of river water level is need to increase piping safety factor.

Big Data-based Monitoring System Design for Water Quality Analysis that Affects Human Life Quality (인간의 삶의 질에 영향을 끼치는 수질(물) 분석을 위한 빅데이터 기반 모니터링 시스템 설계)

  • Park, Sung-Hoon;Seo, Yong-Cheol;Kim, Yong-Hwan;Pang, Seung-Peom
    • Journal of Korea Entertainment Industry Association
    • /
    • v.15 no.3
    • /
    • pp.289-295
    • /
    • 2021
  • Today, the most important factor affecting the quality of human life is thought to be due to the environment. The importance of environmental monitoring systems to improve human life and improve welfare as the magnitude of the damage increases year by year due to the rapid increase in the frequency of hail, typhoons, collapse of incisions, landslides, etc. Is increasing day by day. Among environmental problems, problems caused by water quality have a very high proportion, and as there is a growing concern that the scale of damage will increase when water pollution accidents occur due to urbanization and industrialization, the demand for social water safety nets is increasing. have. In the last 5 years, 259 cases of water pollution (Han River 99, Nakdong River 31, Geum River 25, Seomjin River and Yeongsan River 19, and 85 others) have occurred in the four major river basins. Caused damage. Therefore, it is required to establish a water quality environment management strategy system based on big data that can minimize the uncertainty of the water quality environment by expanding the target of water quality management from the current water quality management system centered on the four major rivers to small and medium-sized rivers, tributaries/branches, and reservoirs. In this paper, we intend to construct and analyze a water quality monitoring system based on big data that can present useful water quality environment information by analyzing the water quality information accumulated for a long time.

Numerical Simulation of Bed Change at the Confluence of the Gamcheon and Mihocheon (합류부에서 하상변동 수치모의 연구: 미호천 및 감천 합류부를 대상으로)

  • Park, Moonhyung;Kim, Hyung Suk
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.328-338
    • /
    • 2019
  • This paper presents the numerical simulations of future river bed changes using CCHE2D, a two-dimensional numerical model, for river confluences at the confluences of the Nakdong River and Gamcheon as well as Geum River and Mihocheon. The numerical simulations of future river bed changes were conducted for three years using hydrological data from August 30, 2012, to August 29, 2015 after the Four Major River Restoration Project. The simulation results demonstrated that river bed changes occurred actively near the confluence where sediment deposition was concentrated, resulting in the possibility of point bar formation. Through the numerical simulations, the characteristics of future river bed change was evaluated by investigating the characteristics of bed changes, average bed elevation changes, and the difference between deposition and erosion in the target section. The two-dimensional numerical model is expected to be used in the future to prepare effective stabilization plans for the tributary confluence.