• Title/Summary/Keyword: Forest work

Search Result 470, Processing Time 0.024 seconds

Work analysis of route survey work on forest-road (임도 노선측량 작업의 작업분석)

  • Kweon, Hyeong-Keon;Lee, Joon-Woo;Choi, Sung-Min;Yeom, In-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.3
    • /
    • pp.209-214
    • /
    • 2013
  • This study examined the work time, work posture, and work intensity for the actual measurement step in forest road the design work that was being carried out. The measurement of the forest road was being carried by a team of three workers and a team of four workers. The examination of work time found that the measurement of 1km took about 8 hours for the four-worker team and 12 hours for the three-worker team. The examination of work intensity found that the energy metabolic rates of the three-worker team were lower than four-worker team. Because their energy consumption per minute decreased as their work time and rest time increased. Furthermore, when appropriate rest time was applied according to work time, the energy metabolic rate decreased and the work intensity became lower. The four-worker team was more advantageous from the time and cost aspects of the forest road measurement work. Furthermore, as the rest time was very low compared to the work time, more efficient forest road measurement work would be possible if the work intensity was lowered by considering the rest time when calculating the standard work time.

Strategies for Improving Forest Work Team Management (산림작업(山林作業) 영림단(營林團) 운영개선(運營改善) 방안(方案)에 관한 연구(硏究))

  • Kang, Gun-Uh
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.3 s.160
    • /
    • pp.153-160
    • /
    • 2005
  • This study was analyze the performance of Forest Work Team from 1999 to 2003. Following recommendations were come up by reviewing the performance of Forest Work Team. The volume of forest works should be increased in order to supply the constant daily work. This would provide the increase of their salary and maintain their salary and maintain their livelihood. The Forest Work Teams should be the members of registered business with highly trained manpower. Qualified Work Team should have extra financial incentive by comparing with general forest workers who did not have adequate skills. The percentage of the certified forest workers should be increased by providing the technical training. To increase the efficiency of forest work, the forest mechanization should be accomplished and the training of forest mechanization had to be offered regularly for the forest workers, and provided them with an education allowance.

A Case Study on the Estimation of Forest Work Load Index in the Type of Forest Tending Operation (숲가꾸기사업 유형별 산림작업부하지수 추정을 위한 사례연구)

  • Sung-Min Park;Hyeong-keun Kweon;Sung-Min Choi
    • Journal of Korean Society of Forest Science
    • /
    • v.112 no.3
    • /
    • pp.303-321
    • /
    • 2023
  • To develop the Forest Work Load Index (FWLI) for estimating the work intensity of forest workers, a study focused on forest tending was conducted. To estimate the FWLI, we used the Ovako Working Posture Analysis System (OWAS) and the Work Load Index (WLI). The OWAS is a prominent method used for analyzing musculoskeletal load in work tasks, and WLI is a prominent method used for analyzing the work intensity of workers. The PRI values analyzed for each forest tending project were 185.3 (Thinning), 150.6 (Pruning), 181.1 (Thinning for Forest Fire Prevention), and 197.0 (Thinning for Young Trees). The WLI values, calculated on the basis of the measured heart rates, were 59.5% (Thinning), 53.5% (Pruning), 56.2% (Thinning for Forest Fire Prevention), and 62.3% (Thinning for Young Trees). The FWLI was calculated using the analyzed PRI and WLI values. The FWLI values for the forest tending project were 110.2 (Thinning), 80.7 (Pruning), 102.1 (Thinning for Forest Fire Prevention), and 123.0 (Thinning for Young Trees). The FWLI developed in this study can be used to quantitatively compare the workloads of forest workers. In the future, the analyzed FWLI can be used as a basis for improving forest workers' postures and comparing workloads across different forest projects.

The Design and Implementation of Mobile Application Solution for Forest Fire based on Drone Photography and Amazon Web Service (AWS)

  • Choi, Si-eun;Bang, Jong-ho
    • Journal of Internet Computing and Services
    • /
    • v.21 no.5
    • /
    • pp.31-37
    • /
    • 2020
  • Last year's Goseong-Sokcho forest fires have highlighted the limitations of extinguishing work for night-time forest fire and the importance of quick identification for information on the spread of forest fire. However, it is not easy to find services that take into account the characteristics of forest fires, as most existing disaster-related mobile applications and research assume various disaster situations rather than just forest fire situations. Therefore, a system that can provide information quickly is needed, taking into account the characteristics of forest fires and the limitations of extinguishing work. In this paper, we propose evacuation route guidance services that bypass areas where fire has already spread, supplement existing methods of extinguishing work, and provide general information on forest fire situations in real time, by putting drones into forest fire situations. It has been implemented to automate image analysis using the Rekognition service of Amazon Web Service (AWS), and the results of fire detection and the T Map API guide the evacuation path. It is expected that the results of this paper will allow efficient and rapid rescue and extinguishing work to be carried out, and further reduce the damage of human life caused by forest fires.

Analysis of working posture of forest trail construction (숲길 조성공사 작업자의 작업자세 분석에 관한 연구)

  • Lee, Myeong-Kyo;Park, Bum-Jin;Lee, Joon-Woo;Choi, Sung-Min
    • Korean Journal of Agricultural Science
    • /
    • v.42 no.2
    • /
    • pp.117-124
    • /
    • 2015
  • In forest work, working conditions are very hard to improve. The good posture is believed to bring about direct improvements such as accident prevention. Therefore, this research carried on analysis of working posture in forest work (construct in stepping-stone) using OWAS analysis system. According to the analytical results provided by OWAS, the ratio of category III (Work posture has a distinctly harmful effect on the musculoskeletal system) has shawn that worker 2 was 32.2%, worker 1 was 25.2% and worker 3 was 15.5%. Furthermore, the ratio of category IV (Work posture with an extremely harmful effect on the musculoskeletal system) has shown that worker 2 was 9.8%, worker 3 was 1.4% and worker 1 was 1.2%. According to the OWAS method, percentage of OWAS action categories III and IV in the worker 2 was higher than another workers.

Analysis of work times and postures occurring relating to stone channel work in forest engineering (돌수로공의 작업시간 및 작업자세 분석에 관한 연구)

  • Yeom, In-Hwan;Choi, Yeon-Ho;Kim, Myeong-Jun;Kweon, Hyeong-Keun;Lee, Joon-Woo;Kim, Je-Su;Park, Bum-Jin
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.101-108
    • /
    • 2011
  • In forest work, working conditions are very hard to improve. The proper distribution of work time and good posture is believed to bring about direct improvements such as accident prevention. On this, this study has analyzed forest workers' posture and their working hours in order to improve their working conditions in stone channel work. Authors has chosen several core elements of stone channel work to focus on, which include stone masonry, excavation of bed, moving stone, directing work, choosing stone, and breaking stone. The ratio of real working time over total working time was shown as 84.6%. As for the time ratio of each elemental work over the real working time, the stone masonry was 60.4%, the directing work was 15.1%, moving stone was 12.1%, choosing stone was 7.1%, breaking stone was 3.3%, and excavation of bed was 2.0%. According to the analytical results provided by OWAS, the ratio of category III (Work posture has a distinctly harmful effect on the musculoskeletal system) has shown that moving stone turned out 65.2%, choosing stone was 61.5%, stone masonry was 46.1%, breaking stone was 14.3%, excavation of bed was 12.5% and directing work was 6.8%. Furthermore, the ratio of category IV (Work posture with an extremely harmful effect on the musculoskeletal system) has shown that excavation of bed turned out 37.5%, breaking stone was 28.6%, stone masonry was 27.3%, choosing stone was 7.7%, moving stone was 6.1% and directing working was 4.5%. These results are expected to be utilized for the improvement with respect to both working methods in the stone channel work and the workers' working posture.

Enhancement of Water Purification Functions of Watershed Basin (II) -­With a Special Reference to the Point at Issue and Counterplans­- (수변구역 산림의 수질정화기능 증진 (II) -­문제점과 대책을 중심으로­-)

  • Park, Jae-Hyeon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.3
    • /
    • pp.58-65
    • /
    • 2002
  • This study synthesizes previous research accomplishments with analysis of problems and counterplan for the riparian forest zone management and ongoing research strategy is suggested. If a part of budgets for water use allotments is supported for forest watershed owner, this policy for the forest owner could encourage the forest management of watershed. Integrated riparian forest management guideline in city and county needs to be established for the implementation of government guidelines. Base on the guideline, working plans of city and county could be evaluated. Public Forest Tending Work for stream water quality and quantity conservation should be enlarged for forest watershed and forest area management in five big river watersheds. Forest watershed should be managed with a connected system for a pollutant reduction strategy in urban and industrial areas.

A Study on the Change of Work and Improvement in the Private Forest Road of Chungcheongnam Province (충청남도 민유임도에 적용된 공종의 변화 및 개선방안에 관한 연구)

  • Lee, Joon Woo;Kim, Ju Baek;Choi, Yeon Ho;Kim, Myeong Jun;Park, Bum Jin;Park, Jong-Min
    • Journal of Forest and Environmental Science
    • /
    • v.23 no.1
    • /
    • pp.21-28
    • /
    • 2007
  • In my study, I analysed and criticised the change of applied works based on a design drawing of a private forest road in Chungchengnam province from 1990 to 2003. The aim of this study is to obtain the fundamental resources for establishment the green forest road which is environment friendly. Working expenses of forest road was gradually increased by a business year. In particular, the working expenses dramatically increased in 1999-2000. In change rate of cost of construction by works, earth work rate of the cost of constructions was declined: from 25.4% in 1990-1999, to 18.5% in 2000-2003. However, the total cost of the construction of slope protection work and structural work increased. Nevertheless the rate of the cost of constructions are not increased where as the earth work rate of the cost of constructions were reduced. The rate of the price construction materials and the cost of construction was the main causes which was led by the extension of the standard requirement of applied work and the increase of the materials of applied work. In other word, materials of structural work and slope protection work increased. If the increase of the cost of construction has seem through the increase of contractual materials and extension of the standard requirement would led to weak competitiveness of forest road. Therefore, diverse method of constructions need to apply and a new method should be developed.

  • PDF

Estimation of Rock Drilling Work Size for Mountain Forest Road Construction (산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.193-199
    • /
    • 1987
  • Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.

  • PDF

A Study on the Assessment of Standard Wage System for Forestry Workers in Korea (임업기능인 임금조사를 통한 직종별 기준임금 산정에 관한 연구)

  • Han, Sang-Kyun;Han, Han-Sup;Woo, Hee-Sung;Choi, Byoung-Koo;Cho, Min-Jae;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.4
    • /
    • pp.632-639
    • /
    • 2015
  • Working in the forest would require a wide range of skills and experience for specific tasks which involve with a high level of risks to worker's safety. However, there has been a concern on the current standard wage system for forest workers because it does not effectively reflect the characteristics of typical working conditions in the forest. In addition, the current standard wages for forestry workers was estimated based on the construction industry's wage system. Therefore, the purpose of this study is to assess a current wage system through the mail survey method and to develop a new wage system for forest worker which effectively reflects skill sets and experience required for successful completion of the work in the forest. We mailed the survey questionnaire consisting of 19 questions to 659 forest workers and received 188 responses resulting in a 28.5% response rate. The results showed that the current average optimal wages of forest worker, special worker and feller were 97,680won/day, 127,559won/day and 152,403won/day, respectively though there were variations depending on the regions. In developing the new standard wage system, this study suggest the current work types(worker, special worker and feller) could be divided into 5 work types (forest-environment workers, forest operations in beginner, forest operations in intermediate, forest operations in advanced and forest equipment operator) reflecting specialty of forest operation thereby stabilizing the new wage system for forest workers.