• Title/Summary/Keyword: Forecasting system

Search Result 1,542, Processing Time 0.033 seconds

Flood-Flow Managenent System Model of River Basin (하천유역의 홍수관리 시스템 모델)

  • Lee, Soon-Tak
    • Water for future
    • /
    • v.26 no.4
    • /
    • pp.117-125
    • /
    • 1993
  • A flood -flow management system model of river basin has been developed in this study. The system model consists of the observation and telemetering system, the rainfall forecasting and data-bank system, the flood runoff simulation system, the dam operation simulation system, the flood forecasting simulation system and the flood warning system. The Multivariate model(MV) and Meterological-factor regression model(FR) for rainfall forecasting and the Streamflow synthesis and reservoir regulation(SSARR) model for flood runoff simulation have been adopted for the development of a new system model for flood-flow management. These models are calibrated to determine the optimal parameters on the basis of observed rainfall, streamflow and other hydrological data during the past flood periods. The flood-flow management system model with SSARR model(FFMM-SR,FFMM-SR(FR) and FFMM-SR(MV)), in which the integrated operation of dams and rainfall forecasting in the basin are considered, is then suggested and applied for flood-flow management and forecasting. The results of the simulations done at the base stations are analysed and were found to be more accurate and effective in the FFMM-SR and FFMM0-SR(MV).

  • PDF

An Intelligent Decision Support System for Demand Forecasting. (수요예측을 위한 지능형 의사결정지원시스템 구축)

  • 염창선
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.43-51
    • /
    • 2000
  • Many organizations are currently adjusting the statistical forecasts with qualitative factors. However, so for a few forecasting system with adjustment process have been developed. They have difficulties in managing knowledge and estimating the quantity of adjustment. In this study, the forecasting support system adopting the frame based knowledge representation and containing the decision making scheme for adjustment is proposed to overcome these difficulties. According to the experiments, the proposed system improves the forecasting performance on gasoline case.

  • PDF

A Study of Forecast System for Clear-Air Turbulence in Korea, Part II: Graphical Turbulence Guidance (GTG) System (한국의 청천난류 예보 시스템에 대한 연구 Part II: Graphical Turbulence Guidance (GTG) 시스템)

  • Kim, Jung-Hoon;Chun, Hye-Yeong;Jang, Wook;Sharman, R.
    • Atmosphere
    • /
    • v.19 no.3
    • /
    • pp.269-287
    • /
    • 2009
  • CAT (clear-air turbulence) forecasting algorithm, the Graphical Turbulence Guidance (GTG) system developed at NCAR (national center for atmospheric research), is evaluated with available observations (e.g., pilot reports; PIREPs) reported in South Korea during the recent 5 years (2003-2008, excluding 2005). The GTG system includes several steps. First, 44 CAT indices are calculated in the domain of the Regional Data Assimilation and Prediction System (RDAPS) analysis data with 30 km horizontal grid spacing provided by KMA (Korean Meteorological Administration). Second, 10 indices that performed ten best forecasting scores are selected. Finally, 10 indices are combined by measuring the score based on the probability of detection, which is calculated using PIREPs exclusively of moderate-or-greater intensity. In order to investigate the best performance of the GTG system in Korea, various statistical examinations and sensitivity tests of the GTG system are performed by yearly and seasonally classified PIREPs. Performances of the GTG system based on yearly distributed PIREPs have annual variations because the compositions of indices are different from each year. Seasonal forecasting is generally better than yearly forecasting, because selected CAT indices in each season represent meteorological condition much more properly than applying the selected CAT indices to all seasons. Wintertime forecasting is the best among the four seasonal forecastings. This is likely due to that the GTG system consists of many CAT indices related to the jet stream, and turbulence associated with the jet stream can be activated mostly in wintertime under strong jet magnitude. On the other hand, summertime forecasting skill is much less than other seasons. Compared with current operational CAT prediction system (KITFA; Korean Integrated Turbulence Forecasting System), overall performance of the GTG system is better when CAT indices are selected seasonally.

Development of Short-Term Load Forecasting Method by Analysis of Load Characteristics during Chuseok Holiday (추석 연휴 전력수요 특성 분석을 통한 단기전력 수요예측 기법 개발)

  • Kwon, Oh-Sung;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.12
    • /
    • pp.2215-2220
    • /
    • 2011
  • The accurate short-term load forecasting is essential for the efficient power system operation and the system marginal price decision of the electricity market. So far, errors of load forecasting for Chuseok Holiday are very big compared with forecasting errors for the other special days. In order to improve the accuracy of load forecasting for Chuseok Holiday, selection of input data, the daily normalized load patterns and load forecasting model are investigated. The efficient data selection and daily normalized load pattern based on fuzzy linear regression model is proposed. The proposed load forecasting method for Chuseok Holiday is tested in recent 5 years from 2006 to 2010, and improved the accuracy of the load forecasting compared with the former research.

24 hour Load Forecasting using Combined Very-short-term and Short-term Multi-Variable Time-Series Model (초단기 및 단기 다변수 시계열 결합모델을 이용한 24시간 부하예측)

  • Lee, WonJun;Lee, Munsu;Kang, Byung-O;Jung, Jaesung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.493-499
    • /
    • 2017
  • This paper proposes a combined very-short-term and short-term multi-variate time-series model for 24 hour load forecasting. First, the best model for very-short-term and short-term load forecasting is selected by considering the least error value, and then they are combined by the optimal forecasting time. The actual load data of industry complex is used to show the effectiveness of the proposed model. As a result the load forecasting accuracy of the combined model has increased more than a single model for 24 hour load forecasting.

System Dynamics Approach for the Forecasting KOSPI (시스템다이내믹스를 활용한 종합 주가지수 예측 모델 연구)

  • Cho, Kang-Rae;Jeong, Kwan-Yong
    • Korean System Dynamics Review
    • /
    • v.8 no.2
    • /
    • pp.175-190
    • /
    • 2007
  • Stock market volatility largely depends on firms' value and growth opportunities. However, with the globalization of world economy, the effect of the synchronization in major countries is gaining its importance. Also, domestically, the business cycle and cash market of the country are additional factors needed to be considered. The main purpose of this research is to attest the application and usefulness of System Dynamics as a general stock market forecasting tool. Throughout this research, System Dynamics suggests a conceptual model for forecasting a KOSPI(Korea Composite Stock Price Index), taking the factors of the composite stock price indexes in traditional researches. In conclusion of this research, System Dynamics was proved to bean appropriate model for forecasting the volatility and direction of a stock market as a whole. With its timely adaptability, System Dynamic overcomes the limit of traditional statistic models.

  • PDF

A System Dynamics Model for Basic Material Price and Fare Analysis and Forecasting (시스템 시뮬레이션을 통한 원자재 가격 및 운송 운임 모델)

  • Jung, Jae-Heon
    • Korean System Dynamics Review
    • /
    • v.10 no.1
    • /
    • pp.61-76
    • /
    • 2009
  • We try to use system dynamics to forecast the demand/supply and price, also transportation fare for iron ore. Iron ore is very important mineral resource for industrial production. The structure for this system dynamics shows non-linear pattern and we anticipated the system dynamic method will catch this non-linear reality better than the regression analysis. Our model is calibrated and tested for the past 6 year monthly data (2003-2008) and used for next 6 year monthly data(2008-2013) forecasting. The test results show that our system dynamics approach fits the real data with higher accuracy than the regression one. And we have run the simulations for scenarios made by possible future changes in demand or supply and fare related variables. This simulations imply some meaningful price and fare change patterns.

  • PDF

A Study on the Demand Forecasting by using Transfer Function with the Short Term Time Series and Analyzing the Effect of Marketing Policy (단기 시계열 제품의 전이함수를 이용한 수요예측과 마케팅 정책에 미치는 영향에 관한 연구)

  • Seo, Myeong-Yu;Rhee, Jong-Tae
    • IE interfaces
    • /
    • v.16 no.4
    • /
    • pp.400-410
    • /
    • 2003
  • Most of the demand forecasting which have been studied is about long-term time series over 15 years demand forecasting. In this paper, we set up the most optimal ARIMA model for the short-term time series demand forecasting and suggest demand forecasting system for short-term time series by appraising suitability and predictability. We are going to use the univariate ARIMA model in parallel with the bivariate transfer function model to improve the accuracy of forecasting. We also analyze the effect of advertisement cost, scale of branch stores, and number of clerk on the establishment of marketing policy by applying statistical methods. After then we are going to show you customer's needs, which are number of buying products. We have applied this method to forecast the annual sales of refrigerator in four branch stores of A company.

A study on the short-term load forecasting expert system considering the load variations due to the change in temperature (기온변화에 의한 수요변동을 고려한 단기 전력수요예측 전문가시스템의 연구)

  • Kim, Kwang-Ho;Lee, Chul-Heui
    • Journal of Industrial Technology
    • /
    • v.15
    • /
    • pp.187-193
    • /
    • 1995
  • In this paper, a short-term load forecasting expert system considering the load variation due to the change in temperature is presented. The change in temperature is an important load variation factor that varies the normal load pattern. The conventional load forecasting methods by artificial neural networks have used the technique where the temperature variables were included in the input neurons of artificial neural networks. However, simply adding the input units of temperature data may make the forecasting accuracy worse, since the accuracy of the load forecasting in this method depends on the accuracy of weather forecasting. In this paper, the fuzzy expert system that modifies the forecasted load using fuzzy rules representing the relations of load and temperature is presented and compared with a conventional load forecasting technique. In the test case of 1991, the proposed model provided a more accurate forecast than the conventional technique.

  • PDF

Very Short-term Electric Load Forecasting for Real-time Power System Operation

  • Jung, Hyun-Woo;Song, Kyung-Bin;Park, Jeong-Do;Park, Rae-Jun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1419-1424
    • /
    • 2018
  • Very short-term electric load forecasting is essential for real-time power system operation. In this paper, a very short-term electric load forecasting technique applying the Kalman filter algorithm is proposed. In order to apply the Kalman filter algorithm to electric load forecasting, an electrical load forecasting algorithm is defined as an observation model and a state space model in a time domain. In addition, in order to precisely reflect the noise characteristics of the Kalman filter algorithm, the optimal error covariance matrixes Q and R are selected from several experiments. The proposed algorithm is expected to contribute to stable real-time power system operation by providing a precise electric load forecasting result in the next six hours.