• Title/Summary/Keyword: Flow quality

Search Result 3,363, Processing Time 0.032 seconds

Prediction of Water-Quality Enhancement Effects of Gates Operation in the West-Nakdong River Using RMA2/RMA4 Models (RMA2/RMA4 모형을 이용한 서낙동간 수문연계운영의 수질개선 효과 예측)

  • Lee, Keum-Chan;Yoon, Young-Sam;Lee, Nam-Joo
    • Journal of Environmental Science International
    • /
    • v.18 no.9
    • /
    • pp.971-981
    • /
    • 2009
  • An objective of this study is as follows: 1) performing sensitivity analysis and parameter estimation of RMA2 and RMA4 models for the West-Nakdong River, 2) drawing up alternatives of gates-operation for water-quality enhancement, and 3) quantitative evaluation of methodology of 'flow-restoration by gates-operation' among 'Comprehensive Plan Improving Water-Quality in the West-Nakdong River(WNR)' with the target water-quality(BOD at Nakbon-N point: below 4.3 mg/L). The parameters for the RMA2 (depth-averaged two-dimensional flow model) and RMA4 (depth-averaged two-dimensional water-quality model) were determined by sensitivity analysis. Result of parameter estimation for RMA2 and RMA4 models is $1,000\;Pa{\cdot}s$ of the eddy viscosity, 20 of the Peclet number, 0.025 of the Manning coefficient, and $1.0\;m^2/s$ of the diffusion coefficient. We have evaluated the effects of water-quality enhancement of the selected alternatives by numerical simulation technique with the models under the steady-state flow condition and the time-variant transport condition. Because of no-resuspension from river bottom and considering BOD as conservative matter, these simulation results slightly differ from real phenomena. In the case of $50\;m^3/s$ of Daejeo-gate inflow, two-dimensional flow pn results result represents that small velocity occurs in the Pyungkang Stream and no flow in the Maekdo River. In the WNR, there occurs the most rapid flow near timhae-bridge. In the WNR, changes of water-quality for the four selected simulation cases(6, 10, 30, $50\;m^3/s$ of the Daejeo-gate inflow) were predicted. Since the Daejeo-Gate and the Noksan-Gate can be opened up to 7 days, it would be found that sustainable inflow of $30\;m^3/s$ at the Daejeo-gate makes BOD in the WNR to be under the target of water-quality.

Development of a Linear Stability Analysis Model for Vertical Boiling Channels Connecting with Unheated Risers

  • Hwang, Dae-Hyun;Yoo, Yeon-Jong;Zee, Seong-Quun
    • Nuclear Engineering and Technology
    • /
    • v.31 no.6
    • /
    • pp.572-585
    • /
    • 1999
  • The characteristics of two-phase flow instability in a vertical boiling channel connecting with an unheated riser are investigated through the linear stability analysis model. Various two-phase flow models, including thermal non-equilibrium effects, are taken into account for establishing a physical model in the time domain. A classical approach to the frequency response method is adopted for the stability analysis by employing the D-partition method. The adequacy of the linear model is verified by evaluating experimental data at high quality conditions. It reveals that the flow-pattern-dependent drift velocity model enhances the prediction accuracy while the homogeneous equilibrium model shows the most conservative predictions. The characteristics of density wave oscillations under low-power and low-quality conditions are investigated by devising a simple model which accounts for the gravitational and frictional pressure losses along the channel. The necessary conditions for the occurrences of type-I instability and flow excursion are deduced from the one-dimensional D-partition analysis. The parametric effects of some design variables on low quality oscillations are also investigated.

  • PDF

Performance Evaluation of Closed Manufacturing Systems with Sampling Inspections (샘플링 검사가 수행되는 폐쇄형 생산 시스템의 성능분석)

  • Lee, Hyo-Seong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.1
    • /
    • pp.123-140
    • /
    • 1997
  • In this paper we consider closed flow line systems with samploing inspections. The total number of parts in the system is assumed to be N. The processings carried out of each station do not always meet the requirement of quality. Therefore, upon completion of its processing at each station, a part is inspected to determine whether the processings meet the requirement of quality or not. We assume that inspection are done on a random basis. If a part is found to be defective by an inspection, it is fed back to the apropriate station. Two different cases will be considered in this study : a three-station flow line system with infinite buffers and a two-station flow line system with finite buffers. For each case, we will develop an exact method to obtain the performance measures such as throughput, machinen utilization, average outgoing quality and manufacturing lead time. For the case of the two-station flow line system ith finite buffers, we will also develop an approximation method using a stage-aggregation technique. Then using buffers, we will also develop an approximation method using a stage-aggregation technique. Then using these results, we will try to find an optimal inspection policy which maximizes the expected net profit under a certain cost structure. Although we present the results only for the two or three station flow line system in this paper, the results obtained in this paper can be extended easily to the system which consists of more than two or three stations.

  • PDF

Development of an Isotope-Dilution Flow-Injection Electrospray/ Mass Spectrometric Method for the Accurate Determination of Glucosamine in Pharmaceutical Formulation

  • Kim, Gui-Nam;Kim, Byung-Joo;Ahn, Seong-Hee;Hwang, Eui-Jin;Kim, Yong-Seong
    • Bulletin of the Korean Chemical Society
    • /
    • v.30 no.2
    • /
    • pp.363-367
    • /
    • 2009
  • An isotope-dilution flow-injection electrospray/mass spectrometric method was developed for the accurate determination of glucosamine contents in pharmaceutical formulations. Samples were extracted by methanol. After spiking glucosamine-1-$^{13}C_1$ as an internal standard, the extracts were then analyzed by flow-injection ESI/MS in a selected ion monitoring (SIM) mode to detect [M+H]$^+$ ions of the analyte and its isotope analogue at m/z 180 and m/z 181, respectively. Confirmatory measurements were made by selectively monitoring the collisionally induced dissociation channels of m/z 180 $\rightarrow$ m/z 72 and m/z 181 $\rightarrow$73, respectively, to test the possibility of bias in the SIM method due to matrix interferences, but any significant bias in the SIM mode was not observed. Repeatability and reproducibility studies showed that the flow-injection ESI/MS method is a reliable and reproducible method which can provide a typical method precision of 1.0 %. Other results for the method validation are reported.

End-to-End Quality of Service Constrained Routing and Admission Control for MPLS Networks

  • Oulai, Desire;Chamberland, Steven;Pierre, Samuel
    • Journal of Communications and Networks
    • /
    • v.11 no.3
    • /
    • pp.297-305
    • /
    • 2009
  • Multiprotocol label switching (MPLS) networks require dynamic flow admission control to guarantee end-to-end quality of service (QoS) for each Internet protocol (IP) traffic flow. In this paper, we propose to tackle the joint routing and admission control problem for the IP traffic flows in MPLS networks without rerouting already admitted flows. We propose two mathematical programming models for this problem. The first model includes end-to-end delay constraints and the second one, end-to-end packet loss constraints. These end-to-end QoS constraints are imposed not only for the new traffic flow, but also for all already admitted flows in the network. The objective function of both models is to minimize the end-to-end delay for the new flow. Numerical results show that considering end-to-end delay (or packet loss) constraints for all flows has a small impact on the flow blocking rate. Moreover, we reduces significantly the mean end-to-end delay (or the mean packet loss rate) and the proposed approach is able to make its decision within 250 msec.

Linking Omnichannel Integration Quality and Customer Loyalty in Vietnamese Banks

  • Thu Trang PHAM
    • Journal of Distribution Science
    • /
    • v.22 no.6
    • /
    • pp.95-106
    • /
    • 2024
  • Purpose: This study investigates the complex dynamics of consumer behavior in Vietnamese banking omnichannel environments, focusing on the roles of service consistency, service transparency, flow, perceived privacy risk, and loyalty intention. Research design, data and methodology: Using a sample of 422 Vietnamese bank customers, data analysis revealed significant relationships among the variables under investigation. Results: Firstly, service consistency was found to positively influence flow experiences and negatively impact perceived privacy risk, highlighting the importance of uniform service quality across channels in enhancing consumer engagement while mitigating privacy concerns. Similarly, service transparency was positively associated with flow experiences and negatively associated with perceived privacy risk, underscoring the importance of transparent information dissemination in fostering immersive consumer experiences while alleviating privacy apprehensions. Furthermore, both flow experiences and perceived privacy risk significantly influenced loyalty intentions, indicating the pivotal roles of engaging experiences and data security in driving consumer loyalty. Additionally, mediated relationships were observed, demonstrating the interplay between service consistency, service transparency, flow, perceived privacy risk, and loyalty intention in shaping consumer behavior in omnichannel contexts. Conclusions: These findings provide valuable insights for retailers and marketers seeking to optimize consumer experiences and cultivate loyalty in omnichannel environments by prioritizing consistency, transparency, and data privacy protection.

Effect on water quality and fish habitat improvement of Wonju Cheon by instream flow increasing (유지유량증가 방안에 따른 원주천 수질 및 어류서식환경 개선효과)

  • Choi, Heung Sik
    • Journal of Wetlands Research
    • /
    • v.10 no.3
    • /
    • pp.57-68
    • /
    • 2008
  • For improving water quality and hish habitat environment the targeted instream flows added to the field measurement of low flow at each reach along Wonju Cheon are calculated by depth, velocity, and the present lower channel width with considering the landscape, aquatic environment, and natural ecological function. Target instream flow increasing ranged from $0.03m^3/s$ of upstream to $0.90m^3/s$ of downstream according to the proposed depths of 0.10m to 0.30m and velocity of 0.2m/s. The methods for target instream flow increasing are base flow increasing by watershed management, non polluted discharge inflow from valley and combined sewer by sewerage system modification, and discharges from upstream reservoirs and detention basins near-by stream. The possible increasing flow rates are $0.19m^3/s$ to $3.42m^3/s$ which are 1.4 to 2.5 times of low flow to be measured which are the equivalent targeted instream flows along Wonju Cheon. The BOD-based water quality improvement are analyzed by QUAL2E. The habitat suitability indices by PHABSIM of Zacco temmincki as target species at middle stream of Wonju Cheon improve significantly by low flow increasing, which is very important to improve water quality and fish habitat.

  • PDF

Study on Estimation and Application of Discharge Coefficient about Nonpoint Source Pollutants using Watershed Model (유역모형을 이용한 유량조건별 배출계수 산정 및 활용방안 연구)

  • Hwang, Ha-Sun;Rhee, Han-Pil;Park, Jihyung;Kim, Yong-Seok;Lee, Sung-Jun;Ahn, Ki Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.653-664
    • /
    • 2015
  • TPLMS (Total water pollutant load management system) that is the most powerful water-quality protection program have been implemented since 2004. In the implementation of TPLMS, target water-quality and permissible discharged load from each unit watershed can be decided by water-quality modeling. And NPS (Non-point sources) discharge coefficients associated with certain (standard) flow are used on estimation of input data for model. National Institute of Environmental Research (NIER) recommend NPS discharge coefficients as 0.15 (Q275) and 0.50 (Q185) in common for whole watershed in Korea. But, uniform coefficient is difficult to reflect various NPS characteristics of individual watershed. Monthly NPS discharge coefficients were predicted and estimated using surface flow and water-quality from HSPF watershed model in this study. Those coefficients were plotted in flow duration curve of study area (Palger stream and Geumho C watershed) with monthly average flow. Linear regression analysis was performed about NPS discharge coefficients of BOD, T-N and T-P associated with flow, and R2 of regression were distributed in 0.893~0.930 (Palger stream) and 0.939~0.959 (Geumho C). NPS Discharge coefficient through regression can be estimated flexibly according to flow, and be considered characteristics of watershed with watershed model.

Assessment of Pollution Levels in the Jangsungcheon Watershed Using Load Duration Curves and Analysis of the Causes

  • Cho, Sohyun;Bak, Jonghun;Lee, Yeong Jae;Kim, Kyunghyun;Jung, Kang Young
    • Journal of Environmental Science International
    • /
    • v.28 no.10
    • /
    • pp.873-885
    • /
    • 2019
  • In this study, a load duration curve was applied to the Jangseongcheon, one of the tributaries of the Yeongsan River, to assess whether the target water quality was achieved. In addition, pollution of the water body was investigated to develop and suggest the optimal management time with respect to polluted flow sections and monthly conditions. The average flow rates of sections JS1 and JS2 were $0.25m^3/s$ and $1.08m^3/s$, respectively. The BOD and T-P for water-quality standards at JS1 were rated at II, whereas the COD and TOC were rated at III, thus indicating a fair level of water quality. By contrast, the BOD at JS2 was rated at III, the T-P at IV, and the TOC at V, indicating poor water quality in this section. The load duration curve was plotted using the actual flow data measured in eight-day intervals for eight years from 2011 to 2018 at locations JS1 and JS2 in the Jangsungcheon Basin. In an assessment using the load duration curve on whether the target water quality was met at location JS1, all of the water quality parameters (BOD, COD, TOC, T-N, T-P, and SS) satisfied the target water quality. By contrast, at location JS2, parameters COD, TOC, T-N, and T-P exceeded target values by more than 50%, indicating the target water quality was not met. The discharge loads of locations JS1 and JS2 were analyzed to identify the reasons the target water quality was exceeded. Results revealed that the land system contributed considerably. Furthermore, the discharge load of JS2 accounted for more than 80% of the load on the entire basin, excluding that of JS1. Therefore, the best method for restraining the inflow of pollutants into the stream near location JS2 must be applied to manage the water quality of the Jangsungcheon.

Flow-Aware Link Dimensioning for Guaranteed-QoS Services in Broadband Convergence Networks

  • Lee, Hoon;Sohraby, Khosrow
    • Journal of Communications and Networks
    • /
    • v.8 no.4
    • /
    • pp.410-421
    • /
    • 2006
  • In this work, we propose an analytic framework for dimensioning the link capacity of broadband access networks which provide universal broadband access services to a diverse kind of customers such as patient and impatient customers. The proposed framework takes into account the flow-level quality of service (QoS) of a connection as well as the packet-level QoS, via which a simple and systematic provisioning and operation of the network are provided. To that purpose, we first discuss the necessity of flow-aware network dimensioning by reviewing the networking technologies of the current and future access network. Next, we propose an analytic model for dimensioning the link capacity for an access node of broadband convergence networks which takes into account both the flow and packet level QoS requirements. By carrying out extensive numerical experiment for the proposed model assuming typical parameters that represent real network environment, the validity of the proposed method is assessed.