• Title/Summary/Keyword: Floor lift

Search Result 80, Processing Time 0.024 seconds

Development of An Optimal Call-response Algorithm of Construction Lift for High-rise Building Construction (초고층 건설용 리프트의 최적 호출 응답 알고리즘 개발)

  • Ahn, Heejae;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.6-7
    • /
    • 2018
  • Although the importance of the construction lift is increasing, no improvements are being made to its operating system. This study proposed an optimal call-response algorithm of the construction lift for high-rise building construction by using image sensing technology, height measuring sensor, and load cell. This algorithm makes turn-around decision of the construction lift by considering the information and the number of user. It occurs when the call comes from a floor where the construction lift already have passed. The purpose of this study is to reduce the total latency of the construction lift user. Furthermore, it is possible to prevent delay in construction duration by carrying out a priority operation of the construction lift for the critical workforce.

  • PDF

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work (마감공사 생산성 향상을 위한 리프트 카 최적배치 모델)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

A Reasoning on the Central Column Hoisting Technique at pagoda of Hwangnyongsa Temple in 872 (872년 황룡사구층탑 찰주 드잡이 방법 추론 연구)

  • Park, Min-Chang;Han, Dong-Soo
    • Journal of architectural history
    • /
    • v.30 no.5
    • /
    • pp.7-16
    • /
    • 2021
  • According to 「Hwangnyongsa Temple Central Column Record」 among the remaining documents, under reconstruction the pagoda of Hwangnyongsa&s 9th floor was completed in July 872 on the lunar calendar. At that time, King Kyeongmun worried about sarira under its central column, saying the central column does not move, and then He ordered to lift the central column. So his servants lifted it on November 6th 872 and checked the sarira and put it back on November 25th on the lunar calendar. 「Hwangnyongsa Temple Central Column Record」 did not document how to lift the central column which is tens of meters. therefore, this study inferred the way the central column of the pagoda of Hwangnyongsa was lifted in 872, left as a mystery. For that, this study set various hypotheses and it researched and analyzed hoisting technique that is a way to lift the pagoda of Hwangnyongsa and a column. In conclusion, this study inferred the most suitable hoisting technique for the pagoda of Hwangnyongsa at that time, based on the research and analysis of each chapter.

Measurement of maxillary sinus volume and available alveolar bone height using computed tomography (치과 임플란트 수술 계획시 CT를 이용한 상악동 체적 및 치조골량 측정)

  • Lee Jae-Hak;Han Won-Jeong;Choi Young Hi;Kim Eun-Kyung
    • Imaging Science in Dentistry
    • /
    • v.33 no.1
    • /
    • pp.35-41
    • /
    • 2003
  • Purpose: To aid in determining the volume of graft bone required before a maxillary sinus lift procedure and compare the alveolar bone height measurements taken by panoramic radiographs to those by CT images. Materials and Methods : Data obtained by both panoramic radiographs and CT examination of 25 patients were used in this study. Maxillary sinus volumes from the antral floor to heights of 5 mm, 10 mm, 15 mm, and 20 mm, were calculated. Alveolar bone height was measured on the panoramic images at each maxillary tooth site and corrected by magnification rate (PBH). Available bone height (ABH) and full bone height (FBH) was measured on reconstructed CT images. PBH was compared with ABH and FBH at the maxillary incisors, canines, premolars, and molars. Results: Volumes of the inferior portion of the sinuses were 0.55 ± 0041 ㎤ for 5 mm lifts, 2.11 ± 0.68 ㎤ for 10 mm, 4.26 ± 1.32 ㎤ for 15 mm, 6.95 ± 2.01 ㎤ for 20 mm. For the alveolar bone measurement, measurements by panoramic images were longer than available bone heights determined by CT images at the incisor and canine areas, and shorter than full bone heights on CT images at incisor, premolar, and molar areas (p<0.001). Conclusion: In bone grafting of the maxillary sinus floor, 0.96 ㎤ or more is required for a 5 mm-lift, 2.79 ㎤ or more for a 10 mm-lift, 5.58 ㎤ or more for a 15 mm-lift, and 8.96 ㎤ or more for a 20 mm-lift. Maxillary implant length determined using panoramic radiograph alone could result in underestimation or overestimation, according to the site involved.

  • PDF

A Study for Antecedent Association Rules

  • Park, Hee-Chang;Cho, Kwang-Hyun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.4
    • /
    • pp.1077-1083
    • /
    • 2006
  • Association rule mining searches for interesting relationships among items in a given database. Association rules are frequently used by retail stores to assist in marketing, advertising, floor placement, and inventory control. There are three primary quality measures for association rule, support and confidence and lift. In this paper we present association rule mining based antecedent variables. We call these rules to antecedent association rules. An antecedent variable is a variable that occurs before the independent variable and the dependent variable.

  • PDF

Corrosion Assessment of Storage Tank Floor using Magnetic Flux Leakage Technique (누설자속법을 이용한 저장탱크 바닥판재의 부식 평가)

  • Won, Soon-Ho;Cho, Kyung-Shik
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.20 no.1
    • /
    • pp.38-45
    • /
    • 2000
  • In this research, MFL technique has been studied for the inspection of storage tank floor. The reference specimens having 20%, 40%, 60% and 80% slot's are fabricated using the carbon steel plates of a 6mm and 10mm thick. Powerful permanent magnets and Hall effect sensors are used to this application. It is shown that our system is able to detect metal loss like a slot. Also, it is possible that slot diameter is measured using transverse type of Hall generator. It is demonstrated that MFL can not differentiate between the response from top side and bottom side slot. Flux leakage response from a bottom side indication is significantly lower in amplitude than that from an equivalent top side slot. It is essential to know this sensor lift-off distance because the MFL signal also changes considerably with the sensor lift-off distance.

  • PDF

Realized Value Creation; New Construction in Constrained Urban In-fill Sites

  • Hadley, Nathaniel C.;Thornton, Charles H.
    • International Journal of High-Rise Buildings
    • /
    • v.7 no.1
    • /
    • pp.33-46
    • /
    • 2018
  • The Case Study prepared by PCPA and Lift Group will identify a growing development problem in urban areas; high value project sites that are restrictive in size or "tight" are underutilized and underdeveloped. In an effort to remedy this problem, our team will evaluate a design program through the lens of both conventional construction and Core Cantilever Construction. It is also important to differentiate between Core Cantilever construction and the plagued "Lift Slab" construction method as they may be confused, due to the top down construction sequence. This article will demonstrate that constraints inherent to conventional construction techniques prohibit economically viable development of these project sites, while Core Cantilever construction methods increase the projects value by reducing construction timelines and increasing the useable floor area.