• Title/Summary/Keyword: Flood modeling

Search Result 277, Processing Time 0.022 seconds

Development of 2D inundation model based on adaptive cut cell mesh (K-Flood) (적응적 분할격자 기반 2차원 침수해석모형 K-Flood의 개발)

  • An, Hyunuk;Jeong, Anchul;Kim, Yeonsu;Noh, Joonwoo
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.10
    • /
    • pp.853-862
    • /
    • 2018
  • An adaptive cut-cell grid based 2D inundation analysis model, K-Flood, is developed in this study. Cut cell grid method divides a grid into a flow area and a non-flow area depending the characteristics of the flows. With adaptive mesh refinement technique cut cell method can represent complex flow area using relatively small number of cells. In recent years, the urban inundation modeling using high resolution and fine quality data is increasing to achieve more accurate flood analysis or flood forecasting. K-Flood has potential to simulate such complex urban inundation using efficient grid generation technique. A finite volume numerical scheme of second order accuracy for space and time was applied. For verification of K-Flood, 1) shockwave reflex simulation by circular cylinder, 2) urban flood experiment simulation, 3) Malpasset dam collapse simulation are performed and the results are compared with observed data and previous simulation results.

Turbidity Modeling for a Negative Buoyant Density Flow in a Reservoir with Consideration of Multiple Particle Sizes (입자크기 분포를 고려한 부력침강 저수지 밀도류의 탁도 모델링)

  • Chung, Se Woong;Lee, Heung Soo;Jung, Yong Rak
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.3
    • /
    • pp.365-377
    • /
    • 2008
  • Large artificial dam reservoirs and associated downstream ecosystems are under increased pressure from long-term negative impacts of turbid flood runoff. Despite various emerging issues of reservoir turbidity flow, turbidity modeling studies have been rare due to lack of experimental data that can support scientific interpretation. Modeling suspended sediment (SS) dynamics, and therefore turbidity ($C_T$), requires provision of constitutive relationships ($SS-C_T$) and accounting for deposition of different SS size fractions/types distribution in order to display this complicated dynamic behavior. This study explored the performance of a coupled two-dimensional (2D) hydrodynamic and particle dynamics model that simulates the fate and transport of a turbid density flow in a negatively buoyant density flow regime. Multiple groups of suspended sediment (SS), classified by the particle size and their site-specific $SS-C_T$ relationships, were used for the conversion between field measurements ($C_T$) and model state variables (SS). The 2D model showed, in overall, good performance in reproducing the reservoir thermal structure, flood propagation dynamics and the magnitude and distribution of turbidity in the stratified reservoir. Some significant errors were noticed in the transitional zone due to the inherent lateral averaging assumption of the 2D hydrodynamic model, and in the lacustrine zone possibly due to long-term decay of particulate organic matters induced during flood runoffs.

An Agent-Based Modeling Approach for Estimating Inundation Areas over Time (행위자 기반 모델링을 활용한 시간에 따른 침수 지역 예상)

  • Kim, Byungil;Shin, Sha Chul;Jung, Jaehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.20-27
    • /
    • 2016
  • Emergency and evacuation planning is critical to reduce potential loss of life from flooding. In order to develop evacuation plans, emergency managers and decision makers require estimates of probable inundation areas and times of inundation. In this paper, we present an agent-based modeling approach that incorporates in a hydrodynamic model to estimate both of these properties. A case study is conducted modeling the failure of a dam located in Andong, South Korea. We estimate flood travel times for Manning's roughness coefficients and discharge using a coupling of the continuity equation and Manning's equation. Using the output from the hydrodynamic model and the flood travel times, the agent-based model produces flood inundation maps at each time interval. The model estimates that for two-thirds of the Andong region the time of inundation is estimated to be slightly less than three minutes. The results of this study can be used to in the development of emergency and evacuation planning for the region.

FLO-2D Simulation of the Flood Inundation Zone in the Case of Failure of the Sandae Reservoir Gyeongju, Gyeongbuk (댐붕괴 모형과 FLO-2D를 연동한 산대저수지 붕괴 침수 모의)

  • Go, Dae-hong;Lee, Khil-Ha;Kim, Jin-Man;Kim, Sung-Wook
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.449-458
    • /
    • 2015
  • The compilation of a flood hazard map is an efficient technique in managing areas at risk of flooding in the case of a dam-break. A scenario-based numerical modeling approach is commonly used to compile a flood hazard map related to dam-break and to determine the model parameters that capture peak discharge, including breach formation and progress, which are important in the modeling method. This approach might be considered less reliable if an existing model is used without local validation. In this study, a dam-break model is linked to a routing model to identify flood-risk areas in the case of failure of the Sandae Reservoir Gyeongju, Gyeongbuk. Model parameters are extracted from a DEM, and maps of land use and soil texture. The simulation results are compared with on-site investigations in terms of inundation and depth. The model reproduces the inundation zone with reasonable accuracy.

A Model for Real-time Reservoir Operations during Flood Period I : Theory and Modeling (홍수기중의 실시간 저수지운영 모형(I) 이론과 모형화)

  • 심명필;선우중
    • Water for future
    • /
    • v.23 no.3
    • /
    • pp.373-384
    • /
    • 1990
  • The purposes of the reservoir operation during flood period are the reduction of the flood damage in the downstrem reaches and the conservation of flood control for the later use. This paper presents a model of simulation technique to determine the real-time operating rules on an hourly basis. The objective of strategy is to minimize the miximum release through the spillway gates with consideration of the uncertainties associated with the forecasted inflows. In this paper, a general procedure for solving this problem is described for a single and paralle reservoirs.

  • PDF

Development of the wet and dry treatment using quadtree grids (사면구조 격자를 이용한 이동경계 기법 개발)

  • Kim, Jong-Ho;Lee, Seung-Oh;Cho, Yong-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.183-186
    • /
    • 2008
  • All measures to cope with flooding rely on flood predictions to some extent, and the effectiveness of these measures is dependent on the quality of flood predictions. It is important to track properly the movements of the river-bankline in numerical modeling because the location of it varies continuously in the flood inundation. In this study, the wet and dry treatment is used to describe the moving river-bankline accurately (Cho, 1996). An oscillatory flow motion in a parabolic basin is used to validate the performance of the developed model based on quadtree grids. As a result of a simulation, a reasonable agreement is observed with analytical and Cho's results.

  • PDF

Application of the Fuzzy Method to Improve GIS Geomorphological Method of Predicting Flood Vulnerable Area

  • Kim Su Jeong;Yom Jae-Hong;Lee Dong-Cheon
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.264-267
    • /
    • 2004
  • In identifying flood vulnerable areas, three methods are generally deployed: the geomorphology method which is based on topographic features; the past evidence method based on observed data of past actual floods; and, prediction of flood areas through hydrologic models. This study aims to improve the prediction model of the geomorphology method through the application of fuzzy method in GIS modeling. The generally used GIS method of superimposing thematic map layers assumes crisp boundaries of the layers, which results in either risk-averse solutions or risk-taking solutions. The introduction of fuzzy concepts to processing of evaluation criteria (DEM, slope, aspect) solves this problem. As the result of applying the fuzzy method to a test site in the west Nak-Dong river, similar flood vulnerable areas were predicted as when using the conventional Boolean criteria. The resulting map, however, showed varying degree of uncertainty of flooding in these areas. This extra information is deemed to be valuable in taking phased actions during flood response, leading to a more effective and timely decision-making.

  • PDF

Estimating Ungauged River Section for Flood Stage Analysis (홍수위 해석을 위한 미측정 하천 단면 추정)

  • Shin, Sat Byeol;Kang, Moon Seong;Jun, Sang Min;Song, Jung Hun;Kim, Kyeung;Ryu, Jeong Hoon;Park, Jihoon;Lee, Do Gil;Lee, Kyeong-Do
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.5
    • /
    • pp.11-18
    • /
    • 2016
  • The objective of this study was to develop the simple method to estimate ungauged river section for flood stage analysis. Damage prediction should be prioritized using hydrological modeling to reduce flood risk. Mostly, the geographical data using hydrological modeling depends on national river cross-section survey. However because of the lack of measured data, it is difficult to apply to many local streams or small watersheds. For this reason, this study suggest the method to estimate unguaged river cross-section. Simple regression equations were derived and used to estimate river cross-section by analyzing the correlation between the river cross-sectional characteristics (width, height and area). The estimated cross-sections were used to simulate flood level by HEC-RAS (Hydrologic Engineering Center's River Analysis System). The applicability of this method was verified by comparing simulated flood level between measured and estimated cross-section. The water surface elevation of the flood stage analysis was 6.56-7.24 m, 5.33-5.95 m and 6.12-6.75 m for measured cross section, for estimated cross section and for estimated cross section based on DEM elevation, respectively. Further study should consider other factors for more accurate flood stage analysis. This study might be used one of the guidelines to estimate ungauged river section for flood stage analysis.

Estimation of the Flood Area Using Multi-temporal RADARSAT SAR Imagery

  • Sohn, Hong-Gyoo;Song, Yeong-Sun;Yoo, Hwan-Hee;Jung, Won-Jo
    • Korean Journal of Geomatics
    • /
    • v.2 no.1
    • /
    • pp.37-46
    • /
    • 2002
  • Accurate classification of water area is an preliminary step to accurately analyze the flooded area and damages caused by flood. This step is especially useful for monitoring the region where annually repeating flood is a problem. The accurate estimation of flooded area can ultimately be utilized as a primary source of information for the policy decision. Although SAR (Synthetic Aperture Radar) imagery with its own energy source is sensitive to the water area, its shadow effect similar to the reflectance signature of the water area should be carefully checked before accurate classification. Especially when we want to identify small flood area with mountainous environment, the step for removing shadow effect turns out to be essential in order to accurately classify the water area from the SAR imagery. In this paper, the flood area was classified and monitored using multi-temporal RADARSAT SAR images of Ok-Chun and Bo-Eun located in Chung-Book Province taken in 12th (during the flood) and 19th (after the flood) of August, 1998. We applied several steps of geometric and radiometric calculations to the SAR imagery. First we reduced the speckle noise of two SAR images and then calculated the radar backscattering coefficient $(\sigma^0)$. After that we performed the ortho-rectification via satellite orbit modeling developed in this study using the ephemeris information of the satellite images and ground control points. We also corrected radiometric distortion caused by the terrain relief. Finally, the water area was identified from two images and the flood area is calculated accordingly. The identified flood area is analyzed by overlapping with the existing land use map.

  • PDF