• 제목/요약/키워드: Flood control reservoir

검색결과 180건 처리시간 0.027초

웹기반 홍수관리시스템 구현을 위한 홍수분석모듈개발 (Development of Flood Analysis Module for the Implementation of a Web-Based Flood Management System)

  • 정인균;박종윤;김성준;장철희
    • 한국농공학회논문집
    • /
    • 제56권6호
    • /
    • pp.103-111
    • /
    • 2014
  • This study was to develop the flood analysis module (FAM) for implementation of a web-based real-time agricultural flood management system. The FAM was developed to apply for an individual watershed, including agricultural reservoir. This module calculates the flood inflow hydrograph to the reservoir using effective rainfall by NRCS-CN method and unit hydrograph calculated by Clark, SCS, and Nakayasu synthetic unit hydrograph methods, and then perform the reservoir routing by modified Puls method. It was programmed to consider the automatic reservoir operation method (AutoROM) based on flood control water level of reservoir. For a $15.7km^2$ Gyeryong watershed including $472{\times}10^4m^3$ agricultural reservoir, rainfall loss, rainfall excess, peak inflow, total inflow, maximum discharge, and maximum water level for each duration time were compared between the FAM and HEC-HMS (applied SCS and Clark unit hydrograph methods). The FAM results showed entirely consistent for all components with simulated results by HEC-HMS. It means that the applied methods to the FAM were implemented properly.

황룡강 유역 저수지군 하류하천 영향평가 (Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed)

  • 황순호;강문성;김지혜;송정헌;전상민;이상현;최진용
    • 한국농공학회논문집
    • /
    • 제54권3호
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

Housing / Urban Development Integrated with Flood-Control Reservoirs in Japan

  • Watanabe, Naoyuki
    • 토지주택연구
    • /
    • 제5권3호
    • /
    • pp.203-214
    • /
    • 2014
  • The purpose of this paper is to introduce two integrated urban development projects in Japan that take full advantage of flood-control reservoirs: the Tetsugakudo Park Collective Housing Development Project and the Koshigaya Lake Town Project. The former project - implemented cooperatively by the Tokyo metropolitan government in charge of river management, Shinjuku and Nakano wards (in Tokyo) responsible for park management, and the Urban Renaissance Agency, a housing project developer - set a significant precedent for three-dimensional river use by realizing the three-dimensional integrated development of a flood control reservoir, a park, and collective housing. The Koshigaya Lake Town Project, launched as a drastic storm water management measure for a low-lying area often plagued by flooding, has achieved a sustainable coexistence between the waterfront environment and the urban living environment, with an artificial flood-control reservoir as the core for urban development. This project is fully committed to environmental coexistence through the optimal use of local environmental resources, with the cooperation of the central government, Saitama Prefecture and Koshigaya City.

퍼지제어모형을 이용한 다목적댐의 홍수조절모형 (III) - 댐군의 연계운영방안 - (Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( III ) - Multi Reservoir Operation Methods -)

  • 심재현;김지태;조원철;김진영
    • 한국방재학회 논문집
    • /
    • 제4권3호
    • /
    • pp.61-72
    • /
    • 2004
  • 본 연구에서는 퍼지제어 모형을 이용한 단일댐의 운영모형을 기포로 하여 한강수계 댐군의 연계운영 방안을 제시하였다. 단일댐 모형에 의한 댐 운영의 결과가 하류부 수위에 미치는 영향을 검토하여 모형의 홍수조절 효과를 확인하였으며 각 댐들의 제어규칙을 모의하여 하류부의 홍수조절 효과가 가장 큰 규칙을 찾음으로써 연계운영 규칙을 선정하였다. 1990, 1995년 대홍수 발생시 실제 운영실적과 연계운영의 결과를 비교한 결과 본 연구에서 개발한 모형이 각 댐의 안정성을 확보하면서 상류부 침수피해를 줄이며 하류부에서 낮은 수위을 확보할 수 있었다는 점에서 치수적인 효과가 뛰어난 운영방안이라고 판단된다.

HEC-HMS와 HEC-RAS모형의 연계에 의한 댐 유역의 홍수영향 분석 (Flood Effects Analysis of Reservoir Basin through the Linkage of HEC-HMS and HEC-RAS Models)

  • 이원희;김선주;김필식
    • 한국농공학회논문집
    • /
    • 제46권2호
    • /
    • pp.15-25
    • /
    • 2004
  • For the effective operation of irrigation reservoirs, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. In this study, the flood effective analysis system was developed through the integration of long-term water budget analysis model, GIS-based HEC-HMS model and HEC-RAS model. The system structure consists of long-term water budget model using modified TANK theory, flood runoff and flood effects analysis model using HEC-GeoHMS, HEC-HMS and HEC-RAS models. The flood effects analysis system simulated the flood runoff from the upstream, downstream flood and long-term runoff of the watershed using the observed data collected from 1998 to 2002 of Seongju dam. The simulated results were reasonably good compared with the observed data. The optimal management method of the reservoir during the whole season is suggested in this study, and the flood analysis system can be a useful tool to evaluate a reservoir operation quantitatively for the mitigation of flood damages of reservoir basin.

저수지 추적을 통한 사이펀 여수로의 홍수조절 효과 분석 (Analysis on Flood Control Effect of Siphon Spillway by Reservoir Routing)

  • 고수현;김재영;이기하
    • 한국지반환경공학회 논문집
    • /
    • 제14권11호
    • /
    • pp.55-63
    • /
    • 2013
  • 농업용 저수지의 경우, 인위적인 홍수조절 기능이 없어 홍수 발생 시 급격한 저수지 수위상승에 따른 월류로 인해 제체의 파괴위험이 높고, 예 경보 없이 상류에서 유입되는 홍수량을 그대로 방류하여 하류 지역에 농경지 침수 등 홍수피해가 발생할 위험성이 높다. 본 연구에서는 경상북도 상주시에 위치한 지평저수지를 대상으로 수문분석을 실시하여 설계홍수량(200년 빈도의 1.2배)을 산정하고, 저수지 추적기법을 통해 기존 여수로와 사이펀 여수로 설치에 따른 저수지 홍수조절능력을 비교 분석하여 사이펀 여수로의 홍수조절 효과를 분석하였다. 그 결과, 지평저수지의 설계홍수량은 $284.3m^3/s$, 로 산정되었으며, 사이펀 여수로의 사전방류를 통해 수위가 약 40cm 정도 하강하고 방류량은 $91m^3/s$, 정도 감소하는 것으로 분석되었다.

하구방조제의 홍수조절 해석 (Flood control analysis of the sea dike at estuary.)

  • 서승덕
    • 물과 미래
    • /
    • 제10권2호
    • /
    • pp.113-124
    • /
    • 1977
  • Alone the southwesten coast of Korean peninsula, the extensive available arable acreages suited for forming are found in the development of tidal flats in the geographically curved bays with a motable tidal emplitude. It was found that the developments of these tidal flats cover an estimated area more than 276,000ha. In this paper, a flood control system by Pul's Storage Indication Method and Pul's Graphical Method at Return Periods-50 yrs, design rainfall-267mm per 48hrs and design flood-926c.m.s. and at 0.2meter control height above the High Water Ordinary Spring Tide Level (+11.0m) was studied. At the result, the flood demage in the reservoir at Return Periods-50 yrs and the tidal level at H.W.O.S.T.L. were satisfied to the below E.L. 11.20m (Flood Level in the reservoir). Well skilled flood control technique and management and control of draining sluice gate should be required for the disaster prevention from the flood and tide damage.

  • PDF

타부탐색기법에 의한 홍수시 저수지 운영에 관한 연구 (Reservoir Operation by Tabu Search Method during Flood)

  • 정한우;최승안;김형수;심명필
    • 한국수자원학회논문집
    • /
    • 제38권9호
    • /
    • pp.761-770
    • /
    • 2005
  • 본 연구에서는 퍼지논리제어의 적용을 통해 홍수시 저수지의 방류량을 결정하는데 있어, 예측유입량 자료에 내재된 불확실성을 고려할 수 있는 저수지 운영 모형을 구성하고자 하였다. 제어규칙은 전문가들의 의견을 반영해 규칙기반을 설정하는데 이러한 일반적인 방법의 단점을 보완하고자 전역 최적화 기법인 타부탐색을 이용하여 제어규칙을 자동적으로 설정해 퍼지-타부탐색 모형을 구성하였다. 모형의 적용 결과, 첨두방류량이 감소되어 홍수조절율이 개선되었으며, 총 방류량도 감소하는 것으로 나타나 결과적으로 치수효과가 증대될 수 있음을 확인하였다. 또한 홍수 후에 가용할 수 있는 수자원의 양이 증가되어 실제운영방법보다 이수적 차원에서 향상된 결과를 나타내었다.

이상홍수를 고려한 퍼지 최적 저수지 운영 (Fuzzy Optimal Reservoir Operation Considering Abnormal Flood)

  • 최창원;유명수;이재응
    • 대한토목학회논문집
    • /
    • 제32권4B호
    • /
    • pp.221-232
    • /
    • 2012
  • 본 연구에서는 이상홍수 발생 시 저수지의 안전성을 확보함과 동시에 두 개의 저수지를 효율적으로 연계운영하여 하류의 홍수피해를 줄이기 위한 모형을 개발하였다. 이상홍수 발생 시 저수지 최적연계운영을 위해 선형계획법을 사용하였고, 저수지 운영에서 유입량, 저수지 수위, 유입량의 증감 등의 요소에 포함된 불확실성을 해결하기 위해 퍼지제어기법을 도입하였다. 선형계획법을 이용하여 이상홍수 유입에 따른 저수지 최적연계운영규칙을 찾아내고, 퍼지제어기법을 사용하여 신속하고 정교한 운영이 요구되는 이상홍수 유입상황에 사용할 수 있는 모형을 개발하였다. 본 연구에서는 낙동강 상류에 위치한 안동댐과 임하댐을 대상으로 각 댐의 저수지에 100년 빈도의 홍수와 PMF가 유입될 때 안동시의 계획홍수량을 초과하지 않도록 저수지최적연계운영을 실시하였고, 최적연계운영규칙과 퍼지제어기법을 사용하여 댐 하류지점의 유량과 각 댐별 저류량, 유입량, 유입량의 증감에 따라 방류량을 결정하는 모형을 개발하였다. 개발된 모형은 안동댐과 임하댐의 각 저수지 및 안동시의 유황에 따라 결정되는 224개의 퍼지규칙으로 정리되었으며, GUI를 통해 현재 유황을 입력하면 각 댐의 방류량을 간단히 결정할 수 있다.

홍수시 실시간 저수지 운영을 위한 의사결정 지원시스템 (Decision Suport System for Real-Time Reservoir Operation during Flood Period)

  • 심순보;김선구
    • 한국수자원학회논문집
    • /
    • 제30권5호
    • /
    • pp.431-439
    • /
    • 1997
  • 본 연구의 목적은 다목적 조수지의 홍수조절능력을 극대화하기 위한 홍수시 실시간 저수지운영 의사결정 지원 시스템을 개발하는 것이다. 본 연구를 통해 개발된 의사결정 지원시스템은 모델베이스와 실시간 자료처리 부시스템, 사용자 인터페이스로 구성되어 있으며, 사용자 인터페이스는 모형에 의해 예측된 홍수조절지점의 수문곡선과 저수지의 저수위 그래프르 그래픽 형태로 보여줄 수 있도록 개발되었다. 개발된 시스템의 적용성을 검증하기 위하여 금강유역의 1987년 7월 및 1995년 8월의 과거 홍수 사상을 가상 실시간으로 대청댐 저수지 운영에 적용하여 의사결정과정을 수행하고, 당시의 운영 실적과 비교·검토하였다. 개발된 시스템의 의한 저수지 운영은 홍수유출모형에 의해 모의되었으며, 그 결과 본 시스템에 의한 저수지운영은 금강하류의 홍수조절에 기여할 수 있는 것으로 나타났다.

  • PDF