1 |
농림부(1996), 농업용 저수지의 안전관리와 노후화에 따른 재개발 대책, pp. 17-18.
|
2 |
농수산부(1982), 농지개량사업계획설계기준(댐편), pp. 210-423.
|
3 |
윤용남(2008), 기초수문학, 청문각, pp. 444-459.
|
4 |
Babaeyan-Koopaei, K., Valentine, E. and Ervine, D.(2002), Case study on hydraulic performance of Brent reservoir siphon spillway, Journal of Hydraulic Engineering, Vol. 128, No. 6, pp. 562-567.
DOI
|
5 |
Clark, C. O.(1945), Storage and the unit hydrograph, Transaction of the American Society of Civil Engineering, Vol. 110, pp. 1419-1446.
|
6 |
Huff, F. A.(1967), Time distribution of rainfall in heavy storms, Water Resources Research, Vol. 3, No. 4, pp. 1007-1019.
DOI
|
7 |
Lee. G. H., Park, K. W., Yu. W. S., Jung. K. S. and Jang. C. L. (2011), A study on flood damage estimation using DEM-based flood inundation model and MD-FDA, Journal of Korean Society of Hazard Mitigation, Vol. 11, No. 5, pp. 327-336 (in Korean).
DOI
|
8 |
Park, H. C.(2011), Dam stability and flood control of dam downstream using siphon spillway, Water and Future, Vol. 44, No. 1, pp. 63-66 (in Korean).
|