• Title/Summary/Keyword: Flood Stability

Search Result 118, Processing Time 0.029 seconds

Detection Method of Distributed Denial-of-Service Flooding Attacks Using Analysis of Flow Information (플로우 분석을 이용한 분산 서비스 거부 공격 탐지 방법)

  • Jun, Jae-Hyun;Kim, Min-Jun;Cho, Jeong-Hyun;Ahn, Cheol-Woong;Kim, Sung-Ho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.1
    • /
    • pp.203-209
    • /
    • 2014
  • Today, Distributed denial of service (DDoS) attack present a very serious threat to the stability of the internet. The DDoS attack, which is consuming all of the computing or communication resources necessary for the service, is known very difficult to protect. The DDoS attack usually transmits heavy traffic data to networks or servers and they cannot handle the normal service requests because of running out of resources. It is very hard to prevent the DDoS attack. Therefore, an intrusion detection system on large network is need to efficient real-time detection. In this paper, we propose the detection mechanism using analysis of flow information against DDoS attacks in order to guarantee the transmission of normal traffic and prevent the flood of abnormal traffic. The OPNET simulation results show that our ideas can provide enough services in DDoS attack.

Stability analysis of tunnel spillway under internal water pressure (내부수압이 작용하는 여수로터널의 안정성 검토)

  • Park, Inn-Joon;Park, Moo-Jong;Kim, Sung-In;Kwak, Chang-Won;Jang, Seo-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • The influence of internal water pressure under the Probable Maximum Flood (PMF) on tunnel spillway is analysed using 3D FDM analysis. HEC-RAS program including 1-D hydrologic numerical model was also implemented to estimate the maximum pressure on the lining under the PMF, thereafter determined rational internal water pressure. Tunnel spillway was designed as twin tunnel and excavation and supporting stage are fully considered. Analysis was classified into the 3 cases; pressure is applied only to the left tunnel, only to right tunnel, and to both tunnels. The maximum tensile stress and axial force in supporting materials induced by water flow were compared with the critical values to assess the stablilty of the tunnel and the locations of stress concentration parts were also examined.

  • PDF

An experimental study on tailings deposition characteristics and variation of tailings dam saturation line

  • Wang, Guangjin;Tian, Sen;Hu, Bin;Kong, Xiangyun;Chen, Jie
    • Geomechanics and Engineering
    • /
    • v.23 no.1
    • /
    • pp.85-92
    • /
    • 2020
  • This study adopted soil test and laboratory physical model experiments to simulate the tailings impoundment accumulation process according to the principle of similarity. Relying on the practical engineering, it analyzed the tailings deposition characteristics on dry beach surface during the damming process, as well as the variation rules of dam saturation line. Results suggested that, the tailings particles gradually became finer along the dry beach surface to inside the impoundment. The particle size suddenly changed at the junction between the deposited beach and the water surface, which displayed an obvious coarsening phenomenon. Besides, the deposited beach exhibited the vertical feature of coarse upward and fine downward on the whole. Additionally, in the physical model, the saturation line elevated with the increase in dam height, and its amplitude was relatively obvious within the range of 1.0-4.5 m away from the initial dam. Under flood condition, the saturation line height was higher than that under normal condition on the whole, with the maximum height difference of 4 cm. This study could provide an important theoretical basis for further studies on dam failure experiments and the evolution rules of leaked tailings flow.

A Case Study of Bridge Scour Vulnerability Evaluation and Prioritization for National Highway Bridges in the National Capital Region (수도권 국도교량 세굴위험도 평가 및 등급화 사례 연구)

  • Park, Jae-Hyun;Kim, Jeong-Hun;An, Seong-Chul;Lee, Ju-Hyung;Chung, Moon-Kyung;Kwak, Ki-Seok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.2
    • /
    • pp.7-21
    • /
    • 2008
  • Foundation failure due to bridge scour during floods is the leading cause of bridge failure. Performed were the evaluation of bridge scour vulnerability and prioritization on real bridges registered in the National Highway Bridge Inventory of the capital region. The case studies for 30 national highway bridges consist of site investigation including boring test, bridge scour analysis fur the design flood, bearing capacity evaluation of the bridge foundation before and after scour, comprehensive evaluation of bridge scour vulnerability, and prioritization. Nine of 26 spread (feting bridges showed the potential future vulnerability to scour with significant decrease in the bearing capacity of foundations due to scour and the remaining 17 spread footing bridges were expected to maintain their stability to resist the effects of scour. Three of 4 pile foundation bridges exhibited considerable decrease in the bearing capacity of foundation after scour.

Hydraulic Characteristic Analysis for Prevention of River Disaster at Estuary in the Eastern Coast of Korea (동해안 하천 하구부의 하천재해 방지를 위한 수리특성 분석)

  • Choi, Jong-Ho;Jun, Kye-Won;Yoon, Yong-Ho
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.2
    • /
    • pp.83-89
    • /
    • 2018
  • The significant sedimentation at the estuary in the eastern coast of Korea frequently causes river mouth occlusion where disconnection between the river and sea is observed. River mouth occlusion causing watershed retention raises the environmental risk of the area as it impairs water quality and threatens the area's safety in the event of floods. This study proposes a plan to maintain stability of river channel and flow of flood discharge at the estuary with loss of its function for disaster prevention. To this end, the study tries to change the location and width of stream path, focusing on the center line of stream near the sand bar of river mouth. This allows to identify a shape of stream path that leads the most stable flow. To review the result, this study uses the SRH-2D, a model for two-dimensional hydraulic analysis, and conduct numeric simulation. The simulation result showed that the most effective plan for maintaining the stable flow of running water without having the area sensitive to changes in hydraulic characteristics is to lower the overall river bed height of the sand bar near the center line of stream to a equal level.

A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures- (淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로-)

  • Nam, Seong-Woo;Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.2
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF

An Experimental Study to Evaluate Hydraulic Characteristics and Stability of Scour Protection for Historic Site Restoration of Woljeong-gyo (월정교 사적지 복원을 위한 수리특성 및 세굴보호공 안정성 검토에 관한 수리모형실험 연구)

  • Kang, Joon-Gu;Yeo, Hong-Koo;Son, Byung-Ju;Ji, Un
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.8
    • /
    • pp.845-854
    • /
    • 2008
  • The old bridge of Woljeong-gyo, which has the fluvial history and culture, represents the ancient construction and civil engineering techniques. It is the oldest stone bridge in Korea and currently restored with its vicinities. In this study, the experimental model was used to analyze the hydraulic characteristics, the local pier-scour depth without scour protection, and the stability of riprap protection using the old grid type panels and stones for Woljeong-gyo of the study area. The water levels were increased around 30cm due to the restored bridge piers and foundations and the effects went up to 200m upstream. The maximum scour depth of 5.4m was measured and the scour protection tests were performed with the riprap size calculated using empirical equations and the existing scour protection range. The riprap of the existing scour protection in the upstream side was broken away, while the riprap of extended scour protection was very stable for the design flood condition of Woljeong-gyo area.

Landslide Analysis of River Bank Affected by Water Level Fluctuation II (저수위 변동에 영향을 받는 강기슭의 산사태 해석 II)

  • Kim, You-Seong;Wang, Yu-Mei;Choi, Jae-Seon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.3
    • /
    • pp.87-93
    • /
    • 2010
  • The change of water level in reservoirs is an important factor causing failure of bank slopes, i.e. landslide. The water level of Three Gorges reservoir in China fluctuate between 145 m and 175 m, as a matter of flood control. During its normal operational state, the rate of water level fluctuation is supposed to range from 0.67 m/d to 3.0 m/d. Majiagou slope is located on the left bank of Zhaxi River, 2.1 km up from the outlet. Zhaxi River is a tributary of the Yangtze River within the Three Gorges area, of which the water level changes with the reservoir. At the back of Majiagou slope, a 20 m long and 3~10 cm wide fissure developed just after the reservoir water level rose from 95 m to 135 m in 2003. This big fissure was a full suggestion of potential failure of this slope. In this study, the pore water pressure files obtained from seepage analysis were used to evaluate the change in factor of safety (FS) with reservoir water level. Slope stability analyses then were carried out, with fully specified slip surface and limit equilibrium method. In the limit equilibrium analysis, the contribution of negative pore water pressure to shear strength was considered by the use of Fredlund's shear strength equation for unsaturated soils. On the base of the analyses, the change of FS with reservoir water level was interpreted in detail. It was found that FS against bank slopes decreases with the rise of the reservoir water level and increases with the drawdown of the reservoir water level. The most dangerous state was when the reservoir water level stays at the highest for a long time.

  • PDF

Physical Modeling of Horizontal Force on the Inland Vertical Structure by Tsunami-like Waves (육상의 직립구조물에 미치는 지진 해일에 의한 수평 파력 및 파압에 대한 수리모형실험)

  • Park, Hyongsu;Cox, Daniel;Shin, Sungwon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.6
    • /
    • pp.363-368
    • /
    • 2017
  • The tsunami flood the coastal cities and damage the land structures. The study on wave pressure and force on land structures is one of the important factors in designing the stability of inland structures. In this study, two - dimensional wave flume tests on the horizontal wave force and pressure of tsunamis on a simplified box-type structure was conducted. Vertical distribution and wave power of horizontal wave pressure over time were measured by pressure sensors and force transducer. Also, those were measured from the different wave breaking types. The vertical distribution of horizontal wave pressure was uniform at the moment when the horizontal wave force to the structure was maximum under the breaking wave condition. A surf similarity parameter was employed in order to figure out the relationship between the maximum horizontal wave force on the structure as a function of various incident wave conditions. As a result, the non - dimensionalized horizontal wave force tends to decrease exponentially as the surf similarity parameter increases.

Hydraulic Stability and Wave Transmit Property of Stacked Geotextile Tube by Hydraulic Model Test (수리모형시험을 통한 다단식 지오텍스타일 튜브의 안정성 및 파랑 전달특성에 관한 연구)

  • Oh Young In;Shin Eun Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.2
    • /
    • pp.57-65
    • /
    • 2005
  • Geotextile have been used for the past 30 years for various types of containers, such as small sandbag, 3-D fabric forms and aggregate filled gabion etc. While they are mainly used for flood and water control, they are also used against beach erosion fir shore protection. Especially, large-sized geotextile tube structures are used in various innovative coastal systems involving breakwaters. This paper presents the hydrodynamic behavior of geotextile tubes based on the results of hydraulic model tests. These tube are generally about 1.0 m to 2.0 m in diameter, thou띤 they can be sized for any application. The tubes can be used solely, or stacked to add greater height and usability. Stacked geotextile tubes will be created by adding the height necessary for some breakwaters and embankment, therefore increasing the usability of geotextile tubes. The hydraulic model test was conducted as structural condition and wave conditions. Structural condition is installation direction to the wave (perpendicular and 45$^{circ}$$), and wave condition is varied with the significant wave height ranging from 3.0 m to 6.0 m. Compared with previous test result, the stacked geotextile tube is more stable against wave attack than single tube. Also, the case of none-water depth above crest is more stable than 0.5H of water depth above crest. The incline installed stacked tube is more effective for wave adsorption.