Kang, Jae Kyoung;Lee, Jae Seong;Suh, Michelle;Lim, Gil Chae;Shin, Myoung Soo;Yun, Byung Min
Archives of Craniofacial Surgery
/
v.20
no.5
/
pp.319-323
/
2019
Cochlear implant extrusion, which is a common complication of cochlear implants, is generally repaired by a well visualized soft-tissue flap. A 61-year-old female patient with a medical history of schizophrenia who had a skin ulcer that caused cochlear implant extrusion, but that would be a stronger statement was referred to our department for removal of the implant and reconstruction of the resultant scalp defect. Accordingly, the broad defect was covered via rotation of a temporoparietal fascia flap (TPFF) using the superficial temporal artery, with the pedicle in the preauricular region as the pivot point. Coverage of TPFF was achieved with a split-thickness skin graft using the scalp as the donor site, which led to a quick recovery after the operation and satisfactory results in terms of aesthetics. This case suggests that a TPFF might be used as a flexible flap with low donor site morbidity for reconstructing cases of cochlear implant extrusion accompanied by a large full-layer scalp defect.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2009.05a
/
pp.895-898
/
2009
In this contribution, we designed a general purpose input/output (GPIO) suitable for embedded systems, especially for Bluetooth baseband. Proposed architecture is compatible for the APB bus in AMBA bus architecture. General purpose I/O should be used as multi-functional and versatile interrupt sources. We considered the edge-sensitive mode as well as the level-sensitive mode for acquiring the interrupt sources. Also, we provided an option to select the operation polarity for flexible application to the embedded systems. The designed GPIO module was automatically synthesized, placed, and routed. Implementation was performed through the Altera FPGA and well operated at 25MHz clock frequency.
Kim, Juyong;Cho, Jintae;Kim, Hongjoo;Cho, Youngpyo;Lee, Hansang
KEPCO Journal on Electric Power and Energy
/
v.6
no.4
/
pp.419-425
/
2020
DC distribution system has been evaluated as an excellent one in comparison with existing AC distribution network because it needs fewer power conversion stages and the full capacity of the equipment can be used without consideration for power factor. Recently, research and development on the implementation of DC distribution networks have been progressed globally based on the rapid advancement in power-electronics technology, and the technological developments from the viewpoint of infrastructure are also in progress. However, to configure a distribution network which is a distribution line for DC, more accurate and rapid introduction of analysis technology is needed for the monitoring, control and operation of the system, which ensure the system run flexible and efficiently. However, in case of a bipolar DC distribution network, there are two buses acting as slack buses, so the Jacobian matrix cannot be configured. Without solving this problem, DC distribution network cannot be operated when the network is unbalanced. Therefore, this paper presented a comprehensive method of analysis with consideration of operating elements which are directly connected between neutral electric potential caused by the unbalanced of load in DC distribution network with bipolar structure.
Purpose - This paper investigates the theories and practices of Most-Favored-Nation (MFN) clauses. The MFN clause became a controversial issue during the past two decades, especially in the context of investment arbitration. This paper aims to clarify a reasonable way to apply MFN clauses. It in particular focuses on the territoriality requirements and the scope of investment activity which are common features included in most of investment treaties. Design/methodology - This paper analyses two investment arbitration cases, Ansung Housing and Beijing Urban Construction. Through the case study, this paper reveals limitations of the currently dominant views on the operation of MFN clauses. It then tries to reconstruct the system of MFN application within the relevant arbitration principles. Findings - Tribunals of recent investment arbitration as represented in the two cases above employed strict literal interpretation of the treaty provisions, especially of the phrase "in its territory". This paper finds a more functional interpretation is appropriate and consistent with theories of public international law and developments of global economy. Originality/value - Existing studies either stuck to literal interpretation or suggested more flexible interpretation of the phrase "in its territory" without full explanation. This paper tries to fill the gap in the existing discussion by analyzing legal foundations and theoretical structure for an effective interpretation of MFN clauses.
The current SBAS service does not provide a method to integrate multiple SBAS corrections. This paper proposes a positioning method to effectively integrate multiple SBAS and multiple GNSS. In the method, the final position is obtained by the weighted sum of the positions obtained from the combination of GNSS and SBAS. Since each position is independently computed and combined using flexible weights, it has a simple structure that can easily cope with various environments. In order to verify the operation and performance of the proposed method, raw measurements of GNSS and SBAS were collected using commercial receivers. The experiments using real signals show that the combined use of two SBAS corrections was more accurate by 0.05~0.4m(2dRMS) than using only one SBAS correction. To improve the position accuracy, this paper considered the integration of multi-GNSS and multi-SBAS, which was not found in other existing studies. The proposed method is expected to be a core technology for designing multi-GNSS navigation receivers considering multi-SBAS corrections. The importance of the method will be increased as KPS and KASS also available in near future.
This study aimed to reduce of traps incident of metro train door by suggesting preventive actions throughout analyzing why railway drivers and passengers commit unsafe behaviors which are human factors making occurrence of the incidents. The incident cases were analyzed and Incident Tree was structured by brainstorming with safety experts. In addition, the questionnaire survey was conducted for comparison with the analysis results. As the result, this study suggested driver's factors, passenger's factors, and public relation plan for safe use of metro in order to reduce the frequency of the incidents. For driver's factors, implementing job-rotation systems between railway and non-railway drivers, installing Object Detection Sensors between the metro doors and PSD, and flexible operation of dwell time were suggested. For passenger's factors, placing a platform safety person, installing a safety fence in front of the stairs and the elevators, and country wide public relations through mass media were suggested.
Ahn, Sung Jae;Song, Seung Yong;Park, Hyung Seok;Park, Se Ho;Lew, Dae Hyun;Roh, Tai Suk;Lee, Dong Won
Archives of Plastic Surgery
/
v.46
no.1
/
pp.79-83
/
2019
Robotic surgery facilitates surgical procedures by employing flexible arms with multiple degrees of freedom and providing high-quality 3-dimensional imaging. Robot-assisted nipple-sparing mastectomy with immediate reconstruction is currently performed to avoid breast scars. Four patients with invasive ductal carcinoma underwent robot-assisted nipple-sparing mastectomy and immediate robot-assisted expander insertion. Through a 6-cm incision along the anterior axillary line, sentinel lymph node biopsy and nipple-sparing mastectomy were performed by oncologic surgeons. The pectoralis major muscle was elevated, an acellular dermal matrix (ADM) sling was created with robotic assistance, and an expander was inserted into the subpectoral, sub-ADM pocket. No patients had major complications such as hematoma, seroma, infection, capsular contracture, or nipple-areolar necrosis. The mean operation time for expander insertion was 1 hour and 20 minutes, and it became shorter with more experience. The first patient completed 2-stage prosthetic reconstruction and was highly satisfied with the unnoticeable scar and symmetric reconstruction. We describe several cases of immediate robot-assisted prosthetic breast reconstruction. This procedure is a feasible surgical option for patients who want to conceal surgical scars.
As the spreading speed of electric vehicles increases rapidly, those are expected to be able to use them as flexible resources in the power system beyond the concern for the supply of its charging power. Especially when the Renewable Energy sources (RES) which have no intrinsic control capability have replaced the synchronous generators more and more, the power system needs to secure the additional frequency control resources to ensure its stability. However, the feasibility of using electric vehicles as the frequency control resources should be analyzed from the perspective of the power system operation and it requires the existing simulation frameworks for the power system. Therefore, this paper proposes the grid connected modeling of the primary frequency control provided by electric vehicles which can be integrated into the existing power system model. In addition, the proposed model is implemented considering technical performances constrained by the characteristics of the Vehicle-Grid Integration (VGI) system so that the simulation results can be accepted by the power utilities operating the power system conservatively.
According to the Renewable Energy 3020 Implementation Plan announced in 2017 by the South Korean government, the electricity share of renewable energy will be expanded to 20% of the total electricity generation by 2030. Given the intermittency of electricity generation from renewable energy, realization of such a plan presents challenges to managing South Korea's isolated national electric grid and implies potentially large excess electricity generation in certain situations. The purpose of this study is: 1) to develop a model to accurately simulate the effects of excess electricity generation from renewables which would arise during the transition, and 2) to propose strategies to manage excess electricity generation through effective utilization of domestic electricity generating capabilities. Our results show that in periods of greater PV and wind power, namely the spring and fall seasons, the frequency of excess electricity generation increases, while electricity demand decreases. This being the case, flexible operation of coal and nuclear power plants along with LNG and pumped-storage hydroelectricity can be used to counterbalance the excess electricity generation from renewables. In addition, nuclear energy plays an important role in reducing CO2 emissions and electricity costs unlike the fossil fuel-based generation sources outlined in the 8th Basic Plan.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.35
no.5
/
pp.509-515
/
2022
As the 4th industrial revolution based on ICT is progressing in the manufacturing field, interest in building smart factories that can be flexible and customized according to customer demand is increasing. To this end, it is necessary to maximize the efficiency of factory by performing an automated process in real time through a network communication between engineers and equipment to be able to link the established IT system. It is also necessary to collect and store real-time data from heterogeneous facilities and to analyze and visualize a vast amount of data to utilize necessary information. Therefore, in this study, four types of controllers such as PLC, Arduino, Raspberry Pi, and embedded system, which are generally used to build a smart factory that can connect technologies such as artificial intelligence (AI), Internet of Things (IoT), and big data, are configured. This study was conducted for the development of a program that can collect and store data in real time to visualize and manage information. For communication verification by controller, data communication was implemented and verified with the data log in the program, and 3D monitoring was implemented and verified to check the process status such as planned quantity for each controller, actual quantity, production progress, operation rate, and defect rate.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.