Our country automatic wet pipe sprinkler system of hydraulically designed system has not deviated from the pipe regulation process, therefore we face limitations when using an independent method to hydraulically designed system. Therefore. after reviewing a developed country's methods using the drainage-density concept, we found it necessary for our country to introduce the drainage-density concept. Currently, under the National Fire Safety Codes(NFSC), this does not solve the problem and the limitation of hydraulically designed system because different problems arise depending on where the head was installed. To make improvements, first, such as the developed country, overcome the difference by introducing the drainage-density concept to determine the amount of drainage. Second, by using diverse head caliber and decreasing the limits on the amounts of distribution, we can expect a leveling off of the drainage density. Third, using the increase of hydraulically designed system through the application of the rule to hydraulically designed system, finally, development to performance based fire protection design.
The values of the AIT (autoignition temperature) for fire and explosion protection are normally the lowest reported. The MAITB (Minimum Autoignition Temperature Behavior) of flammable liquid mixture is exhibited when the AITs of mixture is below the AIT of the individual components. The MAITB is an interesting experimental features, which can be significant from the perspective of industrial fire safety. In this study, the AITs of toluene + iso-propanol(IPA) and p-xylene + n-butanol systems were measured using ASTM E659-78 apparatus. The AITs of toluene, iso-propanol (IPA), pxylene and n-butanol which constituted two binary systems were $547^{\circ}C,\;463^{\circ}C,\;557^{\circ}C$ and $340^{\circ}C$ respectively. The toluene + iso-propanol(IPA) system is exhibited MAITB at 0.3 mole fraction of toluene, and its minimum autoignition temperature was $460^{\circ}C$.
Electrical Connections often cause fires due to poor contact. Occurrence rate of these fires tends to increase annually. The reason why poor contacts occur is often because it is the low mechanical pressure at the contact points. A typical connection method using mechanical pressure is a screw terminal type. This study reviewed these poor contact cases in the screw terminals. In order to get reproduction of such cases, two types of experiments were conducted. the first one was conducted under the normal contact condition, and the other one was conducted under the poor contact condition that screw terminal of breaker was loosen and did not meet the requirements of toque value. In both types of experiments, compulsory vibration was adopted as a variable to aggravate poor contacts. Each of various current values(4.5A, 9.0A, 13.5A) is input. In these experiments, relationships of a contact, electrical signal such as current and electric pulse by ZCT and thermal characteristics according to vibration effect are analyzed. The suggested data and results in this study provide the useful resources helping to investigate fires due to poor contact, and they develop the detector for poor contact and finally reduce the electrical fire occurrence rate.
An, Byung-Kug;Kim, Woon-Hyung;Seo, Dong-Hun;Ham, Eun-Gu
Journal of the Society of Disaster Information
/
v.15
no.1
/
pp.98-108
/
2019
Purpose: The purpose of this study is to test the sprinkler performance to protect the wall and ceiling joints of the sandwich panel warehouse in case of fire. Method: Based on the field surveys, test was setup and combustibles were prepared. The sprinkler discharge tests were performed at the corner of the wall and right under the sprinkler head. Results: It has been found that operation of the K-80 closed sprinkler head prevents the ignition of the sandwich panel and therefore no damage to the joints of sandwich panels. To prevent skipping phenomenon, it is necessary to install the sprinkler head from the corner of the wall and to keep a minimum distance of 2.4m and a maximum distance of 3m. Conclution: A Standard Operation Procedure should be prepared to suppress and rescue of fire brigade for a sandwich panel warehouse protected by perimeter sprinklers preventing a ignition of core materials and control fire.
In this study, the risk of heat generation due to normal and overload currents that vary with the abnormal loosening angle of wire-connecting bolts were identified. The risks were analyzed based on the thermal characteristics to minimize the carbonization accidents of terminal blocks inside distribution panels typically used in industrial sites. We applied a method for measuring the heating temperature and temperature variations in the terminal blocks in real-time by installing a resistance temperature detector sensor board in the terminal block. The experimental results showed that the terminal block model with a low-rated current exhibited a higher heating temperature, thus, confirming the need to select the terminal block capacity based on load currents. Additionally, the higher the rated current of the terminal block with a high-rated current and the higher the degree of loosening, the faster the carbonization point. Such heating temperature monitoring enabled real-time thermal temperature measurement and a step-by-step risk level setting through thermal analysis. The results of the measurement and analysis of carbonization risks can provide a theoretical basis for further research regarding the risk of fire due to carbonization. Furthermore, the deterioration measurement method using the temperature sensor board developed in this study is widely applicable to prevent fires caused by poor electrical contact as well as risk-level management.
Purpose: The purpose of this study is to develop a new sewage bay that has removed its previous problems and verify the excellence of the maintainability of the new sewage bay. Method: The fluid characteristics in the developed sewage bay was analysed with computer simulation tool(COMSOL MultiphysicsTM ver. 3.2 ; COMSOL) and clarified the problems of the existing sewage bay. In addition, the durability of the newly developed sewage bay was verified by the long-term usability testing. Results: As a result of the simulation of a blocked drainage trap, an whirlpool and blockage did not occurred at the flow rate of 0.6m/sec, and we verified that switch device of drain trap was in good condition durably with 6 months long-term usability test. Conclusion: In this study, a newly advanced sewage bay was developed that solved the problems of the existing sewage bay structure. With the fluid simulation and the long-term usability tests, the excellence of the maintenance ability of the newly developed sewage bay was proved.
Purpose: This study is intended to confirm the business disruptive risk in the Serious Accidents, and propose a plan to comply with the Serious Accidents Punishment Act through the Disaster Mitigation Activity Management System. Method: Through literature review and case studies, the requirements and characteristics of each of the Serious Accidents Punishment Act, the Disaster Mitigation Activity Management System, and ISO 45001 were compared and analyzed, and implications were derived. Result: The business disruption and financial adverse effects caused by industrial accidents were identified. Based on this and by using the Disaster Mitigation Activity Management System, measures to link the documentation requirements of the the Serious Accidents Punishment Act to the Disaster Mitigation Activity Management System, and to manage the implementation records of the Serious Accidents Punishment Act's duty were derived. Conclusion: When establishing and operating the Disaster Mitigation Activity Management System, it can not only comply with the Serious Accidents Punishment Act but also contribute to maintaining business continuity and ESG management through the prevention of various disasters and the minimization of secondary damage, etc.
Yang, So-Jin;Lee, Young-Jae;Kim, Woon-Hyung;Dewey, James M.;Ham, Eun-Gu
Journal of the Society of Disaster Information
/
v.15
no.4
/
pp.531-539
/
2019
Purpose: The purpose of this study is to present the commodity classification method of domestic rack-type warehouse for sprinkler system design. Method: On-site surveys and classification criteria of the NFPA, FMDS, EN and Japan were analysed and ISO 12949 test were carried out with proposed each classification commodity. Result: Based on a heat of combustion, a classification method for extra high, high, medium and low are proposed. Conclusion: Sprinkler design criteria to secure the maximum extinguishing strength for each class of commodity need to be applied.
Journal of Korean Tunnelling and Underground Space Association
/
v.16
no.1
/
pp.105-115
/
2014
A numerical analysis on the smoke behavior and evacuee safety has been performed with computational fluid dynamics. The purpose of this study is to build computational processes for an evacuation and prevention of a fire disaster of a 3 km-length tunnel in Korea. To save computational cost, 1.5 km of the tunnel that can include a few cross-passing tunnels is considered. We are going to assess the fire safety in a road tunnel according to the smoke level, which consists of the smoke density and the height from the floor. The smoke density is obtained in detail from three-dimensional unsteady CFD analysis. To obtain proper temperature distributions on the tunnel wall, one-dimensional conduction equation is considered instead of an adiabatic wall boundary or a constant heat flux. The tunnel considered in this study equips the cross passing tunnels for evacuees every 250 m. The distance is critical in both safety and economy. The more cross passing tunnels, the more safe but the more expensive. Three different jet fan operations can be considered in this study; under- and over-critical velocities for normal traffic condition and 0-velocoty operation for the traffic congestion. The SE (smoke environment) level maps show a smoke environment and an evacuating behavior every moment.
Transactions of the Korean Society of Mechanical Engineers A
/
v.32
no.7
/
pp.610-616
/
2008
For this study, the forming analyses and body strength tests of TBP were performed on the main pipe size 150A(KS D3507, KS D 3576 10S). The branched pipe sizes utilized were 25A, 32A, 40A, 50A, 65A, 80A, 100A and 125A. A general FEM program, ABAQUS, was used as the forming analyses method of TBP. Using the results, the strength of TBP was then tested in order to determine the safety of TBP when the working pressure was applied. The results indicate that TBP may be safely used in water-based fire protection pipe systems in terms of the strength.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.