• Title/Summary/Keyword: Fire explosion

Search Result 637, Processing Time 0.027 seconds

A Case Study and Analysis of the Causes for Natural Gas Vehicle Accidents (천연가스자동차 사고사례 및 원인분석)

  • Kim, Young-Seob;Cho, Eun-Goo;Kim, Lae-Hyun
    • Journal of the Korean Institute of Gas
    • /
    • v.13 no.2
    • /
    • pp.41-48
    • /
    • 2009
  • I collected the cases of CNG vehicle accidents which had happened for 30 years and analyzed the causes of the accidents according to each type of cylinders. There are about six accidents including three cylinder explosion accidents due to bad heat treatment, one composite damage, one CNG vehicle fire, and one fuel piping accident owing to the poor maintenance. When looking into the cylinder types involved in the accidents and the causes, 29% of the cylinder accidents are Type I and 24% Type IV, 16% Type II, and 14% Type III. 37% of the accidents are caused by the defects of the raw materials and the errors of a manufacturing process, 16% by the stress corrosion cracking as a result of the repetitive use, 15% by the cylinder's explosion on account of the malfunction of PRD(Pressure Relief Device) and the overpressure. The remainders of the causes are fire and unknown causes. Therefore, cylinder manufacturers have to strengthen quality management of raw materials and manufacturing process and painting regardless of each type of cylinder. Also bus operators need to make an effort to keep safety condition through every day check.

  • PDF

A Study on Practical Analyzing and Improving Disaster Management Organization of Korean Government (재난관리조직의 실태분석과 발전방안)

  • 권오한;남상화;이춘하
    • Fire Science and Engineering
    • /
    • v.15 no.1
    • /
    • pp.127-138
    • /
    • 2001
  • I. introduction. A government goal at the present is established to make a welfare nation and to keep people's safe living, but it is criticised that when a large-scale disaster happens, the authority concerned could not deal with it, causing many people injured and material damage. Moreover, in these days, cities have many risk factors. extremely large and intelligent building, industrial facilities and underground equipment have many risk themselves along with scientific progress. The cope with disaster effectively, government must have efficient organization, skillful personnel, tool, facilities and so on. To reduce the damages, what's the most effective government organization\ulcorner II. Government organization for managing disaster In a few decades, a large-sized accidents broke out in korea, for example, collapse of Sampoong department store, break of Sungso bridge, explosion of Daegu city gas, gas explosion accident at Ahyon-dong etc. but government has not any adequate disaster response organization. Especially, after collapse of Sampoong department store broke out, Disaster Management Act is enacted to solve the past problem. According to Disaster management Act, disaster is limited in manmaid disaster. Therefore, in this thesis, disaster management is inspected theoretically, organization of disaster management for pattern of disaster, and role, duty of government organization, emergency relief organization system and actual conditions are analyzed. there are some problems. there are trials and errors. the government has changed the disaster management organization by the disaster management law. the organization consists of central and local government. but both of government do not work together harmoniously. in thesis, I would like to introduce the advanced nations disaster management organization, and study our central, local government organization. III. Conclusion Change and development of the government disaster management organization is the goal of this thesis. we have to increase public service in response and manage disaster. protecting civilian's life from the disaster is very important responsibility of government. there would be better way of government disaster management organization.

  • PDF

Process Risk Assessment for a Batch Condensation Reaction of Polyester Resin using K-PSR Technique (K-PSR 기법을 활용한 회분식 폴리에스터 축합반응에서의 공정 위험성 평가 연구)

  • Park, Kyung-Min;Lee, Dong-Kyu;Lee, Haakil;Lee, Joon-Man;Ahn, Won-Sool
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.35-42
    • /
    • 2019
  • Risk assessment and analysis for a medium-to-small sized chemical plant that manufactures a polyester resin by the process of batch-type condensation reaction was conducted using K-PSR technique which is one of the risk assessment methods used to implement the Process Safety Management System (PSM). K-PSR is a risk assessment technique developed by KOSHA to compensate for difficulties caused by the lack of infrastructure of medium-to-small sized chemical plants in the re-evaluation. To apply the K-PSR technique, the entire process of a selected chemical palnt was classified in two review sections, i.e., the condensation reaction process and the dilution/filtration process, and the potential risks of the process about these review sections were identified and classified based on the four guide-words (release, fire.explosion, process trouble, and injury). As the results of the research, refer to recommend of risk rating has been confirmed that non-destructive testing of old facilities and the preparation of LOTO procedures for the electrical equipments are necessary as specific measures to prevent the risk of release and fire.explosion. It was also shown that pressure gauges and thermometers should be installed on the hot-oil supply piping to minimize the process trouble, and exhausting hood should be installed to prevent potential injury.

A Study on the Selection of Hydrogen Refueling Station Locations within Military Bases Considering Minimum Safe Distances between Adjacent Buildings (인접 건물 간 최소 안전거리를 고려한 군부대 내 수소충전소 위치선정 연구)

  • Dong-Yeon Kim;Hyuk-Jin Kwon
    • Journal of Internet Computing and Services
    • /
    • v.24 no.6
    • /
    • pp.171-180
    • /
    • 2023
  • Hydrogen energy technology is gaining importance in the era of the Fourth Industrial Revolution, offering military advantages when applied to military vehicles due to its characteristics such as reduced greenhouse gas emissions, noise, and low vibration. Korea's military has initiated the Army Tiger 4.0 plan, focusing on hydrogen application, downsizing, and AI-based smart features. The Ministry of National Defense plans to collaborate with the Ministry of Environment to expand hydrogen charging stations nationwide, anticipating increased deployment of military hydrogen vehicles. However, considering the Jet Fire and VCE(Vapor Cloud Explosion) nature of hydrogen, ensuring safety during installation is crucial. Current military guidelines specify a minimum safety distance of 2m from adjacent buildings for charging stations. Scientific methods have been employed to quantitatively assess the accident damage range of hydrogen, proposing a minimum safety distance beyond the affected area.

Evaluation of the Actual Conditions for the Construction of a Firefighting Safety Management System in Domestic Power Plants (국내발전소 소방안전경영시스템구축을 위한 실태평가에 관한 연구)

  • Kang, Gil-Soo;Choi, Jae-wook
    • Fire Science and Engineering
    • /
    • v.32 no.1
    • /
    • pp.89-98
    • /
    • 2018
  • Fire accidents in foreign countries, like the accident in a thermal power plant in Beijing, the accidents in domestic power plants, including Boryeong Power Plant in 2012 and Taean Power Plant in 2016, a disaster in a nuclear power plant in Fukushima in 2011 or the large-scale power failure in California in 2001 are safety accidents related to electric power, which caused losses in the people's stable lives and the countries. Electricity has an absolute impact on the people's life and the economy, so we can easily expect the serious situation affecting economic growth as well as direct damage to the protection of the people's lives and the losses of properties, if there are fire or explosion accidents or radioactive leak because of negligence in safety management, or problems because of natural disasters like an earthquake in power plants that generate electricity. In this study, it was drawn the improvement of the organizations exclusively in charge of firefighting, the operation of a program for the improvement of professional competency, the development of a customized firefighting management system for plants for systematic firefighting safety management and the improvement of the earthquake-proof correspondence system, which has recently become an issue, as measures for improvements through a survey of the actual conditions concerning the necessity of the construction of a firefighting safety management system for power plants with five power generation companies, including Korea Southern Power Co., Ltd., and the persons in charge of firefighting safety Korea Hydro & Nuclear Power Co., Ltd.

Study on Work-Efficiency in feild of PFB(POSCO E&C Fire Board) for High Sterength Concrete Spalling Control (고강도 콘크리트 폭렬제어를 위한 PFB(POSCO E&C Fire Board) 공법의 현장 시공성에 관한 연구)

  • Kim, Woo-Jae;Park, Dong-Cheol;Yang, Wan-Hee;Lee, Sea-Hyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.961-964
    • /
    • 2008
  • There are researches in progress on ensuring the safety of the high impact concrete in case of fire which is a current rising social problem and this research institute also developed PFB technology, the explosion preventing technology. PFB technology is to apply POSCO E&C Fire Board, a fireproof board, with an adhesive agent on the construction site, and this technology passed 3-hour fireproof test and this technology was proven from a previous research that the temperature of main root is maintained under $200^{\circ}C$. Therefore, tests on basic contents was performed in this research before the actual construction, with a full scale of wooden prototype to apply PFB technology to actual construction sites and the tests were done on the workability of fireproof board, the adhesive power, the resistance against imprint of wooden nail, the heat conductivity and etc. As the results of these tests, PFB technology was proven to have an excellent workability at a construction site and to be easy for processing and also, this technology was proven to have a great resisting power against imprint of wooden nail. Therefore, this research has confirmed that PFB technology has no problem to be applied on a construction site.

  • PDF

A Study on the Probability of BLEVE of Above-ground LP Gas Storage Tanks Exposed to External Fire (지상식 LPG 저장탱크의 외부화재에 의한 BLEVE 가능성 해석)

  • Lee Seung-Lim;Lee Young-Soon
    • Journal of the Korean Institute of Gas
    • /
    • v.7 no.1 s.18
    • /
    • pp.19-23
    • /
    • 2003
  • The purpose of this thesis is to investigate the BLEVE probability of LP gas storage tanks which are relatively more dangerous, by the deductive calculating method using the results of Birk's pilot tank test and the required heat capacity of BLEVE. The result that BLEVEs can occur in only above 43.68 percent of liquid filling level under $600^{\circ}C$ of tank pate temperature and $53^{\circ}C$ of inner liquid temperature, was obtained and will be useful for preventing the BLEVE of LP gas storage tanks in fire sites. In addition, this research showed conditions of external leak and fire causing BLEVE, based on 15ton capacity of LP gas tank which has the same specifications as those in Puchon LP gas filling station accident. The result of the calculation is that the minimum pool fire conditions of BLEVE are above 7.2mm equivalent diameter under a liquid release condition and above 17.6mm equivalent diameter under a two-phase release condition. In the end, the result of calculating the pool size corresponding the above conditions using EFFECTS version 2.1, concludes that a minimum of 3.3 meters of diameter and 10.4 meters of height should be needed for BLEVE outbreak.

  • PDF

Proposal for Ignition Source and Flammable Material Safety Management through 3D Modeling of Hazardous Area: Focus on Indoor Mixing Processes (폭발위험장소 구분도의 3D Modeling을 통한 점화원 및 가연물 안전관리 방안 제안: 실내 혼합공정을 중심으로)

  • Hak-Jae Kim;Duk-Han Kim;Young-Woo Chon
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.47-59
    • /
    • 2024
  • Purpose: This study aims to propose measures for the prevention of fire and explosion accidents within manufacturing facilities by improving the existing classification criteria for hazardous locations based on the leakage patterns of flammable liquids. The objective is to suggest ways to safely manage ignition sources and combustible materials. Method: The hazardous locations were calculated using "KS C IEC 60079-10-1," and the calculated explosion hazard distances were visualized in 3D. Additionally, the formula for the atmospheric dispersion of flammable vapors, as outlined in "P-91-2023," was utilized to calculate the dispersion rates within the hazardous locations represented in 3D. Result: Visualization of hazardous locations in 3D enabled the identification of blind spots in the floor plan, facilitating immediate recognition of ignition sources within these areas. Furthermore, when calculating the time taken for the Lower Explosive Limit (LEL) to reach within the volumetric space of the hazardous locations represented in 3D, it was found that the risk level did not correspond identically with the explosion hazard distances. Conclusion: Considering the atmospheric dispersion of flammable liquids, it was concluded that safety management should be conducted. Therefore, a method for calculating the concentration values requiring detection and alert based on realistically achievable ventilation rates within the facility is proposed.

Experimental Study on Combined Failure Damage of Bi-directional Prestressed Concrete Panel under Impact-Fire Loading (충돌 후 화재에 대한 이방향 프리스트레스트 콘크리트 패널부재의 복합 파괴손상에 관한 실험적 연구)

  • Yi, Na-Hyun;Lee, Sang-Won;Choi, Seung-Jai;Kim, Jang-Ho Jay
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.4
    • /
    • pp.429-440
    • /
    • 2014
  • Since the World Trade Center and Pentagon attacks in 2001, terror, military attack, or man-made disaster caused impact, explosion, and fire accident have frequently occured on civil infrastructures. However, structural behavior researches on major Prestressed Concrete (PSC) infrastructures such as bridges, tunnels, Prestressed Concrete Containment Vessel (PCCVs), and LNG tanks under extreme loading are significantly lacking. Especially, researches on possible secondary fire scenarios after terror, bombing, collision of vehicles and vessels on concrete structures have not been performed domestically where most of the past researches related to extreme loadings on structures focused on an independent isolated extreme loading scenario. Due to the outcry of public concerns and anxiety of potential terrorist attacks on major infrastructures and structures, a study is urgently needed at this time. Therefore, in this study, the bi-directional prestressed concrete $1400{\times}1000{\times}300mm$ panels applied with 430 kN prestressing force using unbonded prestressing thread bars were experimentally evaluated under impact, fire, and impact-fire combined loadings. Due to test site restrictions, impact tests were performed with 14 kN impactor with drop heights of 10m and 3.5 m to evaluate impact resistance capacity. Also, fire and impact-fire combined loading were tested using RABT fire loading curve. The measured residual strength capacities of PSC and RC specimens applied with impact, fire, impact-fire combined loadings were compared with the residual strength capacity of undamaged PSC and RC specimens for evaluation. The study results can be used as basic research data for related research areas such as protective design and numerical simulation under extreme loading scenarios.

A Study on Mitigating Accidents for Liquid Hydrogen (액체수소 사고피해 완화기술에 대한 연구)

  • Jo, Young-Do;Kim, Jin-Jun
    • Journal of the Korean Institute of Gas
    • /
    • v.16 no.6
    • /
    • pp.29-33
    • /
    • 2012
  • This paper is an attempt to give a concise overview of the state-of-the-art in the recent liquid hydrogen safety researches with unwanted event progress. The vessel of liquified hydrogen may fail and liquid hydrogen spilled. The hydrogen will immediately start to evaporate above a pool and make a hydrogen cloud. The cloud will disperse and can produce a vapor cloud explosion. The vessel containing the liquid hydrogen may not be able to cope with the boil-off due to heat influx, especially in case of a fire, and a BLEVE may occur. In equipment where it exists as compressed gas, a leak generates a jet of gas that can self-ignite immediately or after a short delay and produce a jet flame, or in case it ignites at a source a certain distance from the leak (delayed ignition), a flash fire occurs in the open and with confinement a deflagration or even detonation may develop. The up-to-date knowledge in these events, recent progress and future research are discussed in brief.